Australia · Generator · plant location

Gladstone

공식 원천의 전력 객체 · withdrawal announced

Project stage · source basis
Stage requires verification · withdrawal_announced
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Gladstone

Generator · withdrawal announced

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)280 MWacOriginal source column definition · Generation-register unit · Announced Withdrawal
As-of date 2026-07-31
Sources EV-a13c68fb046944b49426fea2
Aggregated Nameplate Capacity (MW AC)280 MWacOriginal source column definition · Generation-register unit · Announced Withdrawal
As-of date 2026-07-31
Sources EV-a13c68fb046944b49426fea2
Detailed source fields
Original source fieldPublished value or condition
Survey ID1077
Site NameGladstone
Site OwnerGladstone Power Station Participants
RegionQLD1
Max Site Capacity (AC)1680
Gen Info Unit ID107705
Unit NameGladstone:5
Technology TypeCoal
Technology DetailBlack Coal
DUIDGSTONE5
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)280
Aggregated Nameplate Capacity (MW AC)280
Commitment StatusAnnounced Withdrawal
Expected Closure Year2029
Closure Date2029-03-31T00:00:00
Survey Last Requested Date2026-12-05T00:00:00
Survey Latest Update Date2026-05-06T15:01:43
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textAnnounced Withdrawal
source_record_idGenerator Information:544

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:544

Sources EV-a13c68fb046944b49426fea2
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 346d45a2ff961a662a55a5a32497e1a923b33dcba1b6b3dbbd8ffa205b577809

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:251

Sources EV-5d588ad853a5b9247aa8b0bd
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 11082961ef242895965947812ae19b567862be82ce922c421982c3465e992b58

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel