Gladstone
Generator · withdrawal announced
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Unit Capacity (MW AC) | 280 MWac | Original source column definition · Generation-register unit · Announced Withdrawal As-of date 2026-07-31 Sources EV-03490694db80a8b5a7c52da1 |
| Aggregated Nameplate Capacity (MW AC) | 280 MWac | Original source column definition · Generation-register unit · Announced Withdrawal As-of date 2026-07-31 Sources EV-03490694db80a8b5a7c52da1 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Survey ID | 1077 |
| Site Name | Gladstone |
| Site Owner | Gladstone Power Station Participants |
| Region | QLD1 |
| Max Site Capacity (AC) | 1680 |
| Gen Info Unit ID | 107702 |
| Unit Name | Gladstone:2 |
| Technology Type | Coal |
| Technology Detail | Black Coal |
| DUID | GSTONE2 |
| Dispatch Type | Scheduled |
| Unit Count | 1 |
| Unit Capacity (MW AC) | 280 |
| Aggregated Nameplate Capacity (MW AC) | 280 |
| Commitment Status | Announced Withdrawal |
| Expected Closure Year | 2029 |
| Closure Date | 2029-03-31T00:00:00 |
| Survey Last Requested Date | 2026-12-05T00:00:00 |
| Survey Latest Update Date | 2026-05-06T15:01:43 |
| record_semantics | participant_reported_generation_information_not_DC_supply |
| Original text | Announced Withdrawal |
| source_record_id | Generator Information:541 |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 2items
Data Source 2026-07-31 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Generator Information:541
Sources EV-03490694db80a8b5a7c52da1Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 618ebef6bd703c93a78aa946a83faaffdf83f5fdfe5faac37dd2d1383a3d0513
Usage terms AEMO general copyright permission subject to exceptions
Data Source 2026-07-24 · Retrieved 2026-10-05
Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.
Source location Expected Closure Year:248
Sources EV-1263a6b52297c0bdea0752a9Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 b485f810ab651d9717b3efd0ca09a9622ac4ecfbc26395cc960cb72f53a56261
Usage terms AEMO general copyright permission subject to exceptions
