Australia · Generator · plant location

Bogong / Mackay

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Bogong / Mackay

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)70 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-6af9a19755ed8a0f45130ebf
Aggregated Nameplate Capacity (MW AC)70 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-6af9a19755ed8a0f45130ebf
Detailed source fields
Original source fieldPublished value or condition
Survey ID1023
Site NameBogong / Mackay
Site OwnerAGL Hydro Partnership
RegionVIC1
Max Site Capacity (AC)300
Gen Info Unit ID102304
Unit NameBogong2
Technology TypeHydro
Technology DetailDam
DUIDMCKAY1
Dispatch TypeScheduled
Unit Count1
Unit Capacity (MW AC)70
Aggregated Nameplate Capacity (MW AC)70
Commitment StatusIn Service
Expected Closure Year2057
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-26T10:11:20
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:139

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:139

Sources EV-6af9a19755ed8a0f45130ebf
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 e27f7f5370a6b20f22b92bd2eecbb0897a06b2d0f8f100a25b6e520b83201957

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:61

Sources EV-af8865a82cbdfc7f193178b0
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 c5d4960bf0aeb0ecc7c6241a12d72a19d94c5362af474ac259ab4679f101a732

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel