Australia · Generator · plant location

Boco Rock Wind Farm

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-07-31
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · AUS · aemo_generation

Boco Rock Wind Farm

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Unit Capacity (MW AC)1.6 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-7d044efd7af373769b941ab8
Aggregated Nameplate Capacity (MW AC)14.4 MWacOriginal source column definition · Generation-register unit · In Service
As-of date 2026-07-31
Sources EV-7d044efd7af373769b941ab8
Detailed source fields
Original source fieldPublished value or condition
Survey ID1022
Site NameBoco Rock Wind Farm
Site OwnerTilt Renewables Australia Pty Ltd
RegionNSW1
Max Site Capacity (AC)113
Gen Info Unit ID102202
Unit NameBoco Rock Wind Farm:59-67
Technology TypeWind
Technology DetailOnshore
DUIDBOCORWF1
Dispatch TypeSemi-scheduled
Unit Count9
Unit Capacity (MW AC)1.6
Aggregated Nameplate Capacity (MW AC)14.4
Commitment StatusIn Service
Expected Closure Year2040
Survey Last Requested Date2026-03-10T00:00:00
Survey Latest Update Date2026-03-31T09:23:13
record_semanticsparticipant_reported_generation_information_not_DC_supply
Original textIn Service
source_record_idGenerator Information:134

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
aemo_generation ↗

Data Source 2026-07-31 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Generator Information:134

Sources EV-7d044efd7af373769b941ab8
Evidence SHA-256 36e64862b715d7edaa736a9bb9c2f73559d63f6b3d1f7afe693e66d7beee038d
행 SHA-256 b8e29ed436c63ccd803eaf98bdcb4c197d733f5421641a200e277cd9c8daeb82

Usage terms AEMO general copyright permission subject to exceptions

aemo_closure ↗

Data Source 2026-07-24 · Retrieved 2026-10-05

Australian Energy Market Operator (AEMO), Generation Information, July 2026; normalized by DATA.

Source location Expected Closure Year:58

Sources EV-ea00061b687dc8b6497494f8
Evidence SHA-256 b945b7cf176e649d71ddaf90c4eb96eb1d2f197a592a98f1b4067ea1df56cbe8
행 SHA-256 1af6cf9f99869fd40a5498697032614941b52713cd56dfc6dfe5ea9a77e88ab5

Usage terms AEMO general copyright permission subject to exceptions

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel