South Korea · Announced development projects

안산 성곡동 IDC

Development announcement · verify each phase

Project stage · source basis
Planned / preconstruction · developer_reported_development
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
Not stated
Collection review date
2026-10-05
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Metrics, specifications and scope

IndicatorsSource valueBasis, scope and stagePeriod and evidence
IT capacity28 MWIT · Project · as publishedNot stated
Evidence for this value
PUE1.33 ratioDesign · Project · DesignNot stated
Evidence for this value
site area8248 m2site area · Project · UndisclosedNot stated
Evidence for this value
Gross floor area24953 m2gross floor area · Project · UndisclosedNot stated
Evidence for this value
delivery role자체 개발Published statement · Project · announced not independently verifiedNot stated
Evidence for this value
permit date announced2026-07Published statement · Project · announced not independently verifiedNot stated
Evidence for this value
construction start target2027-Q1Published statement · Project · announced not independently verifiedNot stated
Evidence for this value

Sources and terms of use


Source terms of use

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel