GLOBAL EVIDENCE COMPARISON
Global facility evidence comparison
Select up to three records from the map list to compare published values on the same basis.
| Item | AirTrunk JHB1, Johor Bahru |
|---|---|
| Country | Malaysia |
| Data Type | Announced development projects |
| Reported operator | Check each original source |
| Review status | 공식 원천의 전력 객체 · Published statement |
| Data Reference Date | 2024-07-30 |
| Collection review date | 2026-10-05 |
| facility capacity unspecifiedMW · facility capacity unspecified · Facilities · published total | 150 MW |
| initial phase capacity unspecifiedMW · initial phase capacity unspecified · initial phases · opening announced | 50 MW |
| rooftop solar ready capacityMW · rooftop solar ready capacity · initial phase · solar ready | 1 MW |
| PUEratio · pue · Facilities · Design | 1.15 ratio |
| cooling technologytechnology · cooling technology · Facilities · Operator announcement | Direct-to-chip liquid cooling and indirect evaporative cooling technology |
Only values with matching asset type, metric, unit, basis, scope, stage and period share a row. Generation, utility intake, IT, contracted and available capacities are not added or converted. Empty cells do not mean equipment is absent.