GLOBAL EVIDENCE COMPARISON

Global facility evidence comparison

Select up to three records from the map list to compare published values on the same basis.

ItemAirTrunk JHB1, Johor Bahru
CountryMalaysia
Data TypeAnnounced development projects
Reported operatorCheck each original source
Review status공식 원천의 전력 객체 · Published statement
Data Reference Date2024-07-30
Collection review date2026-10-05
facility capacity unspecifiedMW · facility capacity unspecified · Facilities · published total

150 MW
2024-07-30
Evidence for this value

initial phase capacity unspecifiedMW · initial phase capacity unspecified · initial phases · opening announced

50 MW
2024-07-30
Evidence for this value

rooftop solar ready capacityMW · rooftop solar ready capacity · initial phase · solar ready

1 MW
2024-07-30
Evidence for this value

PUEratio · pue · Facilities · Design

1.15 ratio
2024-07-30
Evidence for this value

cooling technologytechnology · cooling technology · Facilities · Operator announcement

Direct-to-chip liquid cooling and indirect evaporative cooling technology
2024-07-30
Evidence for this value

Only values with matching asset type, metric, unit, basis, scope, stage and period share a row. Generation, utility intake, IT, contracted and available capacities are not added or converted. Empty cells do not mean equipment is absent.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel