GLOBAL EVIDENCE COMPARISON

Global facility evidence comparison

Select up to three records from the map list to compare published values on the same basis.

Itemequinix-sl1
CountrySouth Korea
Data TypeAnnounced development projects
Reported operatorCheck each original source
Review status공식 원천의 전력 객체 · Published statement
Data Reference DateNot stated
Collection review date2026-10-05
colocation aream² · Operator announcement · Facilities · operational facility

3082 m²
Not stated
Evidence for this value

minimum cabinet densitykVA/cabinet · Operator announcement · Facilities · operational facility

5 kVA/cabinet
Not stated
Evidence for this value

ups redundancyconfiguration · Operator announcement · Facilities · operational facility

N+1 configuration
Not stated
Evidence for this value

cooling redundancyconfiguration · Operator announcement · Facilities · operational facility

N+20% configuration
Not stated
Evidence for this value

generator autonomy full loadh · Design · Facilities · operational facility

15 h
Not stated
Evidence for this value

raised floor load capacitykN/m² · Design · Facilities · operational facility

10 kN/m²
Not stated
Evidence for this value

power distribution voltageV · power distribution voltage · internal distribution · Operator announcement

220/380 V
Not stated
Evidence for this value

generator redundancyconfiguration · generator redundancy · Facilities · Operator announcement

N+1 configuration
Not stated
Evidence for this value

Only values with matching asset type, metric, unit, basis, scope, stage and period share a row. Generation, utility intake, IT, contracted and available capacities are not added or converted. Empty cells do not mean equipment is absent.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel