GLOBAL EVIDENCE COMPARISON

Global facility evidence comparison

Select up to three records from the map list to compare published values on the same basis.

Itemdigital-realty-icn10
CountrySouth Korea
Data TypeAnnounced development projects
Reported operatorCheck each original source
Review status공식 원천의 전력 객체 · Published statement
Data Reference DateNot stated
Collection review date2026-10-05
total building aream² · Operator announcement · Facilities · operational facility

15200 m²
Not stated
Evidence for this value

building storeysstorey · Operator announcement · Facilities · operational facility

10 storey
Not stated
Evidence for this value

ups redundancyconfiguration · Operator announcement · Facilities · operational facility

N+1 configuration
Not stated
Evidence for this value

cooling redundancyconfiguration · Operator announcement · Facilities · operational facility

N+1 configuration
Not stated
Evidence for this value

green building certificationcertification · Operator announcement · Facilities · operational facility

GSEED certification
Not stated
Evidence for this value

energy management certificationcertification · Operator announcement · Facilities · operational facility

ISO 50001 certification
Not stated
Evidence for this value

utility feed voltagekV · Design · Facilities · operational facility

22.9 kV
Not stated
Evidence for this value

generator autonomy full loadh · Design · Facilities · operational facility

12 h
Not stated
Evidence for this value

utility feeder countcount · utility feeder count · Facilities · Operator announcement

2 count
Not stated
Evidence for this value

utility feeder configurationconfiguration · utility feeder configuration · Facilities · Operator announcement

active/standby, separate transformers configuration
Not stated
Evidence for this value

generator countcount · generator count · Facilities · Operator announcement

8 count
Not stated
Evidence for this value

generator redundancyconfiguration · generator redundancy · Facilities · Operator announcement

N+1 configuration
Not stated
Evidence for this value

cooling redundancyconfiguration · cooling redundancy · data suite · Operator announcement

N+2 configuration
Not stated
Evidence for this value

crah unit countcount · crah unit count · data suite · Operator announcement

10 count
Not stated
Evidence for this value

cloud direct connect speedsGbps · cloud direct connect speeds · AWS Direct Connect · Operator announcement

1;10;100 Gbps
Not stated
Evidence for this value

fiber route redundancyconfiguration · fiber route redundancy · Facilities · Operator announcement

diverse and redundant routes and POP rooms configuration
Not stated
Evidence for this value

Only values with matching asset type, metric, unit, basis, scope, stage and period share a row. Generation, utility intake, IT, contracted and available capacities are not added or converted. Empty cells do not mean equipment is absent.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel