GLOBAL EVIDENCE COMPARISON
Global facility evidence comparison
Select up to three records from the map list to compare published values on the same basis.
| Item | 당진 송산 IDC |
|---|---|
| Country | South Korea |
| Data Type | Announced development projects |
| Reported operator | Check each original source |
| Review status | Development announcement · verify each phase |
| Data Reference Date | Not stated |
| Collection review date | 2026-10-05 |
| IT capacityMW · IT · Project · as published | 140 MW |
| PUEratio · Design · Project · Design | 1.33 ratio |
| site aream2 · site area · Project · Undisclosed | 43188 m2 |
| Gross floor aream2 · gross floor area · Project · Undisclosed | 106716 m2 |
| Contracted electricity supply capacityMW · contract · Campus · developer claimed secured | 300 MW |
| planned capacity unspecifiedMW · unspecified · buildings A and B · Plan | 200 MW |
| planned capacity unspecifiedMW · unspecified · building C · permitting | 100 MW |
| rack power densitykW/rack · Design · rack · Design | ≤ 160 kW/rack |
| delivery roletext · Published statement · Project · announced not independently verified | 자체 개발 하이퍼스케일 프로그램 |
| cooling technologytext · Published statement · Project · announced not independently verified | 액체냉각 설계 |
| construction start announcedtext · Published statement · Project · announced not independently verified | 2026-Q3 |
| completion targettext · Published statement · Project · announced not independently verified | 2028-Q4 |
| liquid cooled it capacityMW · IT · Project · publisher design or specification | 140 MW |
| construction start targettext · Published statement · building A · developer announced plan | 2026-11 초 |
| service start targettext · Published statement · building A · developer announced plan | 2028-Q1 |
| service start targettext · Published statement · buildings B and C · developer announced plan | 2028 |
| permit completion targettext · Published statement · building C · developer announced plan | 2026-12 |
| procurement delivery windowtext · Published statement · campus transformers · developer announced plan | 2027–2028 |
| construction contractortext · Published statement · buildings A and B · developer announced plan | DL이앤씨 선정 주장 |
| transformer suppliertext · Published statement · Campus · developer announced plan | LS일렉트릭 공급 예정 |
| development milestonetext · Published statement · buildings A and B · developer announced plan | 부지 매입·전력 계약·건축허가 완료 주장; 원 계약·허가증은 미확보 |
| specification maturitytext · Published statement · Campus · developer announced plan | 최종 제원은 입주 고객 요구에 따라 확정 예정 |
| mou partiestext · Published statement · building C · publisher reported | 충청남도; 당진시; NFD코리아; EFD |
| phase one completion targettext · Published statement · campus phase one · developer announced plan | 2028-Q3 |
| schedule review notetext · document comparison · cross source review · publisher reported | 소개 페이지 2026-Q3 착공·2028-Q4 준공, 9/9 발표 1단계 2028-Q3, 9/14 발표 A동 2026-11 착공·2028-Q1 개시. 범위·판본이 달라 확정일로 병합하지 않음. |
Only values with matching asset type, metric, unit, basis, scope, stage and period share a row. Generation, utility intake, IT, contracted and available capacities are not added or converted. Empty cells do not mean equipment is absent.