GLOBAL EVIDENCE COMPARISON
Global facility evidence comparison
Select up to three records from the map list to compare published values on the same basis.
| Item | 안산 IDC |
|---|---|
| Country | South Korea |
| Data Type | Announced development projects |
| Reported operator | Check each original source |
| Review status | Development announcement · verify each phase |
| Data Reference Date | Not stated |
| Collection review date | 2026-10-05 |
| IT capacityMW · IT · Project · as published | 28 MW |
| PUEratio · Design · Project · Design | 1.33 ratio |
| delivery roletext · Published statement · Project · announced not independently verified | 임차사 소싱; 설계; 엔지니어링 자문 |
| cooling technologytext · Published statement · Project · announced not independently verified | 공기냉각 계획 |
| permit date announcedtext · Published statement · Project · announced not independently verified | 2025-09 |
| construction start announcedtext · Published statement · Project · announced not independently verified | 2026-Q1 |
| air cooled it capacityMW · IT · Project · publisher design or specification | 28 MW |
Only values with matching asset type, metric, unit, basis, scope, stage and period share a row. Generation, utility intake, IT, contracted and available capacities are not added or converted. Empty cells do not mean equipment is absent.
