● Operations

STT Seoul 1

345-26 Gasan-dong, Geumcheon-gu, Seoul, South Korea

Center OverviewPhysical Sites · PowerSame operator
Operational StatusOperations

Commercial operation in June 2026

Public PowerIT Load: up to 30 MW

Distinguish between power supply, UPS, and IT load

Facility scaleApproximately 40,000 ㎡

Hyperscale and AI Colocation

Confirm move-in conditions at this center.

Discuss facility, power and network requirements → · Compare published Korean rental products

Additional power and facility specifications

Values and scope are preserved from public sources. Different phases and dates for one facility remain separate observations.

Evidence relationships · KOR · primary:b9526e8ed2b10f567a769443

stt-seoul-1

Not obtained · Identity match confirmed

Relationship status: Identity match confirmed · same canonical domestic facility
Related record stt-seoul-1 · Relationship evidence · Relationship evidence · Relationship evidence · Relationship evidence · Relationship evidence · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_iddomestic:stt-seoul-1
to_kinddomestic_facility
to_idstt-seoul-1
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 6items
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__pue__20261005

Sources EV-f5166e1aac024f496178014c
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__it_load_capacity__20261005

Sources EV-e60b0fe087e2f0acf61881c3
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__utility_feed_voltage__20261005

Sources EV-9c0971c4e82751cc343a8196
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__ups_configuration__20261005

Sources EV-773822f6cdd387ebd7269cae
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__cooling_continuity_technology__20261005

Sources EV-580b72356ad01b15f1290044
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__green_building_certification__20261005

Sources EV-ec0e320edf0b843d29af2d34
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
Power assets and projects · KOR · primary:b9526e8ed2b10f567a769443

stt-seoul-1

data center project · Published statement

Metric or conditionSource valueBasis, scope and stage
PUE1.3 ratioDesign · Facilities · operational facility
As-of date 2026-06-16
Sources EV-f5166e1aac024f496178014c
IT capacity30 MW_ITOperator announcement · Facilities · operational facility
As-of date 2026-06-16
Sources EV-e60b0fe087e2f0acf61881c3
utility_feed_voltage22.9 kVOperator announcement · Facilities · operational facility
As-of date 2026-06-16
Sources EV-9c0971c4e82751cc343a8196
ups_configurationDistributed redundant UPS configurationOperator announcement · Facilities · operational facility
As-of date 2026-06-16
Sources EV-773822f6cdd387ebd7269cae
cooling_continuity_technologyThermal energy storage (TES) technologyOperator announcement · Facilities · operational facility
As-of date 2026-06-16
Sources EV-580b72356ad01b15f1290044
green_building_certificationLEED Gold certificationOperator announcement · Facilities · operational facility
As-of date 2026-06-16
Sources EV-ec0e320edf0b843d29af2d34
commercial_operation_start2026-06 date_monthOperator announcement · Facilities · operational facility
As-of date 2026-06-16
Sources EV-58a6ee9b27e540e6cad2c88a
generator_autonomy24 hgenerator autonomy · Facilities · Operator announcement
As-of date 2026-06-16
Sources EV-4114bd0a8c6215c6b0e1b637
utility_feeder_count2 countutility feeder count · Facilities · Operator announcement
As-of date 2026-06-16
Sources EV-4114bd0a8c6215c6b0e1b637
design_certificationTier III TCDD certificationdesign certification · Facilities · design certified
As-of date 2026-06-16
Sources EV-4114bd0a8c6215c6b0e1b637
Detailed source fields
Original source fieldPublished value or condition
collection_field_gaps
  • fields
    • wue
    • water_supply_capacity
    • exact_connection_point
    • actual_energization_date
    reason
    No verified field-level original acquired for these attributes; null is not zero.
source_record_iddomestic:stt-seoul-1

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 8items
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__pue__20261005

Sources EV-f5166e1aac024f496178014c
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__it_load_capacity__20261005

Sources EV-e60b0fe087e2f0acf61881c3
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__utility_feed_voltage__20261005

Sources EV-9c0971c4e82751cc343a8196
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__ups_configuration__20261005

Sources EV-773822f6cdd387ebd7269cae
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__cooling_continuity_technology__20261005

Sources EV-580b72356ad01b15f1290044
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__green_building_certification__20261005

Sources EV-ec0e320edf0b843d29af2d34
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__commercial_operation_start__20261005

Sources EV-58a6ee9b27e540e6cad2c88a
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location facility technical specification

Sources EV-4114bd0a8c6215c6b0e1b637
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

stt-seoul-1

Facilities · Official statement

Metric or conditionSource valueBasis, scope and stage
generator_autonomy≤ 24 hgenerator autonomy · Facilities · Operator announcement
As-of date 2026-06-16
Sources EV-4114bd0a8c6215c6b0e1b637
Detailed source fields
Original source fieldPublished value or condition
Verification statusprimary_statement
Change typenew
Contracting parties

    Up to 24 hours without refuelling; source does not specify full-load basis.

    Sources, reference dates and retrieval dates 1items
    www.sttgdc.com ↗

    Data Source 2026-06-16 · Retrieved 2026-10-05

    www.sttgdc.com

    Source location facility technical specification

    Sources EV-4114bd0a8c6215c6b0e1b637
    Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
    Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

    stt-seoul-1

    Facilities · Official statement

    Metric or conditionSource valueBasis, scope and stage
    utility_feeder_count2 countutility feeder count · Facilities · Operator announcement
    As-of date 2026-06-16
    Sources EV-4114bd0a8c6215c6b0e1b637
    Detailed source fields
    Original source fieldPublished value or condition
    Verification statusprimary_statement
    Change typenew
    Contracting parties
      Sources, reference dates and retrieval dates 1items
      www.sttgdc.com ↗

      Data Source 2026-06-16 · Retrieved 2026-10-05

      www.sttgdc.com

      Source location facility technical specification

      Sources EV-4114bd0a8c6215c6b0e1b637
      Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
      Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

      stt-seoul-1

      Facilities · Official statement

      Metric or conditionSource valueBasis, scope and stage
      design_certificationTier III TCDD certificationdesign certification · Facilities · design certified
      As-of date 2026-06-16
      Sources EV-4114bd0a8c6215c6b0e1b637
      Detailed source fields
      Original source fieldPublished value or condition
      Verification statusprimary_statement
      Change typenew
      Contracting parties

        Design documents certification; no assertion of constructed-facility or operating certification.

        Sources, reference dates and retrieval dates 1items
        www.sttgdc.com ↗

        Data Source 2026-06-16 · Retrieved 2026-10-05

        www.sttgdc.com

        Source location facility technical specification

        Sources EV-4114bd0a8c6215c6b0e1b637
        Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
        Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

        stt-seoul-1

        Facilities · publisher stated

        Metric or conditionSource valueBasis, scope and stage
        commercial_operation_starttext 2026-06 date_monthOperator announcement · Facilities · operational facility
        As-of date 2026-06-16
        Sources EV-58a6ee9b27e540e6cad2c88a
        Detailed source fields
        Original source fieldPublished value or condition
        origin_familydomestic_specifications
        inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
        Verification statuspublisher_stated
        Change typereused
        Contracting parties

          The start of commercial operation is specified only as June. The announcement date of June 16 is not treated as the start date.

          Sources, reference dates and retrieval dates 1items
          www.sttgdc.com ↗

          Data Source 2026-06-16 · Retrieved 2026-10-05

          www.sttgdc.com

          Source location inherited domestic specification stt-seoul-1__commercial_operation_start__20261005

          Sources EV-58a6ee9b27e540e6cad2c88a
          Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
          Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

          stt-seoul-1

          Facilities · publisher stated

          Metric or conditionSource valueBasis, scope and stage
          cooling_continuity_technologytext Thermal energy storage (TES) technologyOperator announcement · Facilities · operational facility
          As-of date 2026-06-16
          Sources EV-580b72356ad01b15f1290044
          Detailed source fields
          Original source fieldPublished value or condition
          origin_familydomestic_specifications
          inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
          Verification statuspublisher_stated
          Change typereused
          Contracting parties

            The adoption of TES is specified. Storage capacity and duration are not disclosed.

            Sources, reference dates and retrieval dates 1items
            www.sttgdc.com ↗

            Data Source 2026-06-16 · Retrieved 2026-10-05

            www.sttgdc.com

            Source location inherited domestic specification stt-seoul-1__cooling_continuity_technology__20261005

            Sources EV-580b72356ad01b15f1290044
            Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
            Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

            stt-seoul-1

            Facilities · publisher stated

            Metric or conditionSource valueBasis, scope and stage
            green_building_certificationtext LEED Gold certificationOperator announcement · Facilities · operational facility
            As-of date 2026-06-16
            Sources EV-ec0e320edf0b843d29af2d34
            Detailed source fields
            Original source fieldPublished value or condition
            origin_familydomestic_specifications
            inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
            Verification statuspublisher_stated
            Change typereused
            Contracting parties

              The announcement dated 2026-06-16 states that certification was "achieved". This is the operator's latest statement, superseding the earlier "pre-certified" designation.

              Sources, reference dates and retrieval dates 1items
              www.sttgdc.com ↗

              Data Source 2026-06-16 · Retrieved 2026-10-05

              www.sttgdc.com

              Source location inherited domestic specification stt-seoul-1__green_building_certification__20261005

              Sources EV-ec0e320edf0b843d29af2d34
              Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
              Total 12evidence records

              Source-backed facility metrics

              Design values, targets and operator-disclosed figures are distinguished. Total facility capacity is not the remaining capacity available for lease, and kVA and kW are not used interchangeably.

              Evidence records 12Facility metrics 12Official Source Text 1Last reviewed 2026-10-07

              Expand a category to check the source location and applicable scope. Review dates refer to document checks, not equipment changes.

              Facility milestones and spatial scope

              Publication, review and actual start dates are distinct. Occupancy approval does not establish commercial operation, and published capacity is not saleable inventory.

              Event comparison date: 2026-10-17 · Latest evidenced event by date: Commercial operations started

              This shows the order of evidenced events and does not establish the facility’s overall current operating status.

              2026-06-012026-06-301Commercial operations started · 2026-06 · Reported actual eventCommercial operations started · 2026-06 · Reported actual event

              Wide markers show uncertainty within a stated month or year, not construction or operating duration. Planned dates are not treated as completed events.

              Milestone eventSource event dateSource / reference dates
              1. Commercial operations started
              Reported actual event
              2026-06
              Month precision
              ST Telemedia Global Data Centres ↗
              Source date: 2026-06-16 · Confirm: 2026-10-05
              Opening announcement / facility scale
              The start of commercial operation is specified only as June. The announcement date of June 16 is not treated as the start date.

              Capacity evidence by definition

              Capacity definitionPublished valueBasis / phaseSource / reference dates
              IT capacity≤ 30 MW_ITOperator-disclosed specifications
              Operational facility scope
              ST Telemedia Global Data Centres ↗
              2026-06-16 · Confirm: 2026-10-05
              Up to 30 MW. This is not utility supply capacity, the currently occupied load or capacity available for lease.

              Upper bounds and targets are not converted into confirmed capacity. Capacities with different definitions, parent/child scopes or stages are not summed.

              Saleable inventory and total market supply require separate verification.

              Milestone and scope JSON
              Power and backup supply 5 Evidence records
              IndicatorsPublished valueBasis / phaseSource / reference dates
              재급유 없는 발전기 운전 상한≤ 24 hoursOperator-disclosed specifications
              Published facility specification scope
              ST Telemedia Global Data Centres ↗
              Source date: 2026-06-16
              Confirm: 2026-10-07
              Evidence location / interpretation limits

              backup generators ... up to 24 hours without refuelling

              최대 24시간 발표. 부하 조건이 명확하지 않아 full-load 또는 design-IT-load 지표와 직접 비교하지 않습니다.

              Maximum IT load≤ 30 MW_ITOperator-disclosed specifications
              Operational facility scope
              ST Telemedia Global Data Centres ↗
              Source date: 2026-06-16
              Confirm: 2026-10-05
              Evidence location / interpretation limits

              Opening announcement / facility scale

              Up to 30 MW. This is not utility supply capacity, the currently occupied load or capacity available for lease.

              UPS configurationDistributed redundant UPS configurationOperator-disclosed specifications
              Operational facility scope
              ST Telemedia Global Data Centres ↗
              Source date: 2026-06-16
              Confirm: 2026-10-05
              Evidence location / interpretation limits

              Designed for high availability and operational resilience

              A distributed redundant configuration. It is not arbitrarily converted to N+1 or 2N.

              전력 인입 계통 수2 feedsOperator-disclosed specifications
              Published facility specification scope
              ST Telemedia Global Data Centres ↗
              Source date: 2026-06-16
              Confirm: 2026-10-07
              Evidence location / interpretation limits

              dual 22.9kV power feeds

              운영사 공개 제원. 인증서·설계도 또는 현장 실측으로 독립 검증하지 않았습니다.

              Utility feed voltage22.9 kVOperator-disclosed specifications
              Operational facility scope
              ST Telemedia Global Data Centres ↗
              Source date: 2026-06-16
              Confirm: 2026-10-05
              Evidence location / interpretation limits

              Designed for high availability and operational resilience

              The voltage of each of the dual power feeds. It is not converted into total utility supply capacity in MW.

              Cooling and energy 2 Evidence records
              IndicatorsPublished valueBasis / phaseSource / reference dates
              Cooling continuity equipmentThermal energy storage (TES) technologyOperator-disclosed specifications
              Operational facility scope
              ST Telemedia Global Data Centres ↗
              Source date: 2026-06-16
              Confirm: 2026-10-05
              Evidence location / interpretation limits

              Designed for high availability and operational resilience

              The adoption of TES is specified. Storage capacity and duration are not disclosed.

              Design PUE< 1.3Design value
              Operational facility scope
              ST Telemedia Global Data Centres ↗
              Source date: 2026-06-16
              Confirm: 2026-10-05
              Evidence location / interpretation limits

              Designed for high availability and operational resilience

              Published as "below 1.3". This is not a measured operational PUE.

              Building and floor area 1 Evidence records
              IndicatorsPublished valueBasis / phaseSource / reference dates
              연면적 발표약 40,000 m²Operator-disclosed specifications
              Published facility specification scope
              ST Telemedia Global Data Centres ↗
              Source date: 2026-06-16
              Confirm: 2026-10-07
              Evidence location / interpretation limits

              approximately 40,000 square metres of gross floor area

              운영사 공개 제원. 인증서·설계도 또는 현장 실측으로 독립 검증하지 않았습니다.

              Safety and certifications 2 Evidence records
              IndicatorsPublished valueBasis / phaseSource / reference dates
              Green building certificationLEED Gold certificationOperator-disclosed specifications
              Operational facility scope
              ST Telemedia Global Data Centres ↗
              Source date: 2026-06-16
              Confirm: 2026-10-05
              Evidence location / interpretation limits

              Designed for high availability and operational resilience

              The announcement dated 2026-06-16 states that certification was "achieved". This is the operator's latest statement, superseding the earlier "pre-certified" designation.

              설계문서 인증 발표Uptime Tier III TCDDOperator-disclosed specifications
              Published facility specification scope
              ST Telemedia Global Data Centres ↗
              Source date: 2026-06-16
              Confirm: 2026-10-07
              Evidence location / interpretation limits

              Tier III Certification of Design Documents

              운영사 공개 제원. 인증서·설계도 또는 현장 실측으로 독립 검증하지 않았습니다.

              Operations and facility information 2 Evidence records
              IndicatorsPublished valueBasis / phaseSource / reference dates
              Commercial operation start month2026-06 date_monthOperator-disclosed specifications
              Operational facility scope
              ST Telemedia Global Data Centres ↗
              Source date: 2026-06-16
              Confirm: 2026-10-05
              Evidence location / interpretation limits

              Opening announcement / facility scale

              The start of commercial operation is specified only as June. The announcement date of June 16 is not treated as the start date.

              합작 지분 발표STT GDC 60%; Hyosung Heavy Industries 40%Operator-disclosed specifications
              Published facility specification scope
              ST Telemedia Global Data Centres ↗
              Source date: 2026-06-16
              Confirm: 2026-10-07
              Evidence location / interpretation limits

              opening announcement joint venture

              운영사 공개 제원. 인증서·설계도 또는 현장 실측으로 독립 검증하지 않았습니다.

              CENTER OVERVIEW

              About the Center

              An AI-ready data center operated in Gasan-dong by a joint venture between STT GDC and Hyosung Heavy Industries.

              01IT Load: up to 30 MW
              02Commercial operation in June 2026
              03Uptime Tier III design certification

              AI-DC KOREA ANALYSIS

              Interpretation and Verification Points

              The approximately 40,000 m² stated in the latest opening materials takes precedence. It differs from the 31,205 m² in earlier development materials; this is recorded as a difference in the scope of disclosures at different times.

              Principles for Interpreting Numbers

              Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.

              RESEARCH PRO

              Cross-Reference Data and Licensing Detail Ledger

              We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.

              AI-DC KOREA MEMBER

              Log In

              Sign in to continue on this page.

              G Continue with GoogleK Continue with Kakao

              Choose the Google or Kakao account you registered with.

              Start a consultation · Choose a channel