POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 12items · current page 1–12 · Source records, not unique facilities.

Evidence relationships · KOR · primary:b9526e8ed2b10f567a769443

stt-seoul-1

Not obtained · Identity match confirmed

Relationship status: Identity match confirmed · same canonical domestic facility
Related record stt-seoul-1 · Relationship evidence · Relationship evidence · Relationship evidence · Relationship evidence · Relationship evidence · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_iddomestic:stt-seoul-1
to_kinddomestic_facility
to_idstt-seoul-1
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 6items
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__pue__20261005

Sources EV-f5166e1aac024f496178014c
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__it_load_capacity__20261005

Sources EV-e60b0fe087e2f0acf61881c3
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__utility_feed_voltage__20261005

Sources EV-9c0971c4e82751cc343a8196
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__ups_configuration__20261005

Sources EV-773822f6cdd387ebd7269cae
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__cooling_continuity_technology__20261005

Sources EV-580b72356ad01b15f1290044
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__green_building_certification__20261005

Sources EV-ec0e320edf0b843d29af2d34
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
Power assets and projects · KOR · primary:b9526e8ed2b10f567a769443

stt-seoul-1

data center project · Published statement

Metric or conditionSource valueBasis, scope and stage
PUE1.3 ratioDesign · Facilities · operational facility
As-of date 2026-06-16
Sources EV-f5166e1aac024f496178014c
IT capacity30 MW_ITOperator announcement · Facilities · operational facility
As-of date 2026-06-16
Sources EV-e60b0fe087e2f0acf61881c3
utility_feed_voltage22.9 kVOperator announcement · Facilities · operational facility
As-of date 2026-06-16
Sources EV-9c0971c4e82751cc343a8196
ups_configurationDistributed redundant UPS configurationOperator announcement · Facilities · operational facility
As-of date 2026-06-16
Sources EV-773822f6cdd387ebd7269cae
cooling_continuity_technologyThermal energy storage (TES) technologyOperator announcement · Facilities · operational facility
As-of date 2026-06-16
Sources EV-580b72356ad01b15f1290044
green_building_certificationLEED Gold certificationOperator announcement · Facilities · operational facility
As-of date 2026-06-16
Sources EV-ec0e320edf0b843d29af2d34
commercial_operation_start2026-06 date_monthOperator announcement · Facilities · operational facility
As-of date 2026-06-16
Sources EV-58a6ee9b27e540e6cad2c88a
generator_autonomy24 hgenerator autonomy · Facilities · Operator announcement
As-of date 2026-06-16
Sources EV-4114bd0a8c6215c6b0e1b637
utility_feeder_count2 countutility feeder count · Facilities · Operator announcement
As-of date 2026-06-16
Sources EV-4114bd0a8c6215c6b0e1b637
design_certificationTier III TCDD certificationdesign certification · Facilities · design certified
As-of date 2026-06-16
Sources EV-4114bd0a8c6215c6b0e1b637
Detailed source fields
Original source fieldPublished value or condition
collection_field_gaps
  • fields
    • wue
    • water_supply_capacity
    • exact_connection_point
    • actual_energization_date
    reason
    No verified field-level original acquired for these attributes; null is not zero.
source_record_iddomestic:stt-seoul-1

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 8items
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__pue__20261005

Sources EV-f5166e1aac024f496178014c
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__it_load_capacity__20261005

Sources EV-e60b0fe087e2f0acf61881c3
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__utility_feed_voltage__20261005

Sources EV-9c0971c4e82751cc343a8196
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__ups_configuration__20261005

Sources EV-773822f6cdd387ebd7269cae
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__cooling_continuity_technology__20261005

Sources EV-580b72356ad01b15f1290044
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__green_building_certification__20261005

Sources EV-ec0e320edf0b843d29af2d34
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location inherited domestic specification stt-seoul-1__commercial_operation_start__20261005

Sources EV-58a6ee9b27e540e6cad2c88a
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
www.sttgdc.com ↗

Data Source 2026-06-16 · Retrieved 2026-10-05

www.sttgdc.com

Source location facility technical specification

Sources EV-4114bd0a8c6215c6b0e1b637
Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

stt-seoul-1

Facilities · Official statement

Metric or conditionSource valueBasis, scope and stage
generator_autonomy≤ 24 hgenerator autonomy · Facilities · Operator announcement
As-of date 2026-06-16
Sources EV-4114bd0a8c6215c6b0e1b637
Detailed source fields
Original source fieldPublished value or condition
Verification statusprimary_statement
Change typenew
Contracting parties

    Up to 24 hours without refuelling; source does not specify full-load basis.

    Sources, reference dates and retrieval dates 1items
    www.sttgdc.com ↗

    Data Source 2026-06-16 · Retrieved 2026-10-05

    www.sttgdc.com

    Source location facility technical specification

    Sources EV-4114bd0a8c6215c6b0e1b637
    Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
    Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

    stt-seoul-1

    Facilities · Official statement

    Metric or conditionSource valueBasis, scope and stage
    utility_feeder_count2 countutility feeder count · Facilities · Operator announcement
    As-of date 2026-06-16
    Sources EV-4114bd0a8c6215c6b0e1b637
    Detailed source fields
    Original source fieldPublished value or condition
    Verification statusprimary_statement
    Change typenew
    Contracting parties
      Sources, reference dates and retrieval dates 1items
      www.sttgdc.com ↗

      Data Source 2026-06-16 · Retrieved 2026-10-05

      www.sttgdc.com

      Source location facility technical specification

      Sources EV-4114bd0a8c6215c6b0e1b637
      Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
      Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

      stt-seoul-1

      Facilities · Official statement

      Metric or conditionSource valueBasis, scope and stage
      design_certificationTier III TCDD certificationdesign certification · Facilities · design certified
      As-of date 2026-06-16
      Sources EV-4114bd0a8c6215c6b0e1b637
      Detailed source fields
      Original source fieldPublished value or condition
      Verification statusprimary_statement
      Change typenew
      Contracting parties

        Design documents certification; no assertion of constructed-facility or operating certification.

        Sources, reference dates and retrieval dates 1items
        www.sttgdc.com ↗

        Data Source 2026-06-16 · Retrieved 2026-10-05

        www.sttgdc.com

        Source location facility technical specification

        Sources EV-4114bd0a8c6215c6b0e1b637
        Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
        Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

        stt-seoul-1

        Facilities · publisher stated

        Metric or conditionSource valueBasis, scope and stage
        commercial_operation_starttext 2026-06 date_monthOperator announcement · Facilities · operational facility
        As-of date 2026-06-16
        Sources EV-58a6ee9b27e540e6cad2c88a
        Detailed source fields
        Original source fieldPublished value or condition
        origin_familydomestic_specifications
        inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
        Verification statuspublisher_stated
        Change typereused
        Contracting parties

          The start of commercial operation is specified only as June. The announcement date of June 16 is not treated as the start date.

          Sources, reference dates and retrieval dates 1items
          www.sttgdc.com ↗

          Data Source 2026-06-16 · Retrieved 2026-10-05

          www.sttgdc.com

          Source location inherited domestic specification stt-seoul-1__commercial_operation_start__20261005

          Sources EV-58a6ee9b27e540e6cad2c88a
          Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
          Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

          stt-seoul-1

          Facilities · publisher stated

          Metric or conditionSource valueBasis, scope and stage
          cooling_continuity_technologytext Thermal energy storage (TES) technologyOperator announcement · Facilities · operational facility
          As-of date 2026-06-16
          Sources EV-580b72356ad01b15f1290044
          Detailed source fields
          Original source fieldPublished value or condition
          origin_familydomestic_specifications
          inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
          Verification statuspublisher_stated
          Change typereused
          Contracting parties

            The adoption of TES is specified. Storage capacity and duration are not disclosed.

            Sources, reference dates and retrieval dates 1items
            www.sttgdc.com ↗

            Data Source 2026-06-16 · Retrieved 2026-10-05

            www.sttgdc.com

            Source location inherited domestic specification stt-seoul-1__cooling_continuity_technology__20261005

            Sources EV-580b72356ad01b15f1290044
            Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
            Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

            stt-seoul-1

            Facilities · publisher stated

            Metric or conditionSource valueBasis, scope and stage
            green_building_certificationtext LEED Gold certificationOperator announcement · Facilities · operational facility
            As-of date 2026-06-16
            Sources EV-ec0e320edf0b843d29af2d34
            Detailed source fields
            Original source fieldPublished value or condition
            origin_familydomestic_specifications
            inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
            Verification statuspublisher_stated
            Change typereused
            Contracting parties

              The announcement dated 2026-06-16 states that certification was "achieved". This is the operator's latest statement, superseding the earlier "pre-certified" designation.

              Sources, reference dates and retrieval dates 1items
              www.sttgdc.com ↗

              Data Source 2026-06-16 · Retrieved 2026-10-05

              www.sttgdc.com

              Source location inherited domestic specification stt-seoul-1__green_building_certification__20261005

              Sources EV-ec0e320edf0b843d29af2d34
              Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
              Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

              stt-seoul-1

              Facilities · publisher stated

              Metric or conditionSource valueBasis, scope and stage
              IT capacity≤ 30 MW_ITOperator announcement · Facilities · operational facility
              As-of date 2026-06-16
              Sources EV-e60b0fe087e2f0acf61881c3
              Detailed source fields
              Original source fieldPublished value or condition
              origin_familydomestic_specifications
              inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
              Verification statuspublisher_stated
              Change typereused
              Contracting parties

                Up to 30 MW. This is not utility supply capacity, the currently occupied load or capacity available for lease.

                Sources, reference dates and retrieval dates 1items
                www.sttgdc.com ↗

                Data Source 2026-06-16 · Retrieved 2026-10-05

                www.sttgdc.com

                Source location inherited domestic specification stt-seoul-1__it_load_capacity__20261005

                Sources EV-e60b0fe087e2f0acf61881c3
                Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
                Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

                stt-seoul-1

                Facilities · publisher stated

                Metric or conditionSource valueBasis, scope and stage
                PUE< 1.3 ratioDesign · Facilities · operational facility
                As-of date 2026-06-16
                Sources EV-f5166e1aac024f496178014c
                Detailed source fields
                Original source fieldPublished value or condition
                origin_familydomestic_specifications
                inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
                Verification statuspublisher_stated
                Change typereused
                Contracting parties

                  Published as "below 1.3". This is not a measured operational PUE.

                  Sources, reference dates and retrieval dates 1items
                  www.sttgdc.com ↗

                  Data Source 2026-06-16 · Retrieved 2026-10-05

                  www.sttgdc.com

                  Source location inherited domestic specification stt-seoul-1__pue__20261005

                  Sources EV-f5166e1aac024f496178014c
                  Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
                  Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

                  stt-seoul-1

                  Facilities · publisher stated

                  Metric or conditionSource valueBasis, scope and stage
                  ups_configurationtext Distributed redundant UPS configurationOperator announcement · Facilities · operational facility
                  As-of date 2026-06-16
                  Sources EV-773822f6cdd387ebd7269cae
                  Detailed source fields
                  Original source fieldPublished value or condition
                  origin_familydomestic_specifications
                  inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
                  Verification statuspublisher_stated
                  Change typereused
                  Contracting parties

                    A distributed redundant configuration. It is not arbitrarily converted to N+1 or 2N.

                    Sources, reference dates and retrieval dates 1items
                    www.sttgdc.com ↗

                    Data Source 2026-06-16 · Retrieved 2026-10-05

                    www.sttgdc.com

                    Source location inherited domestic specification stt-seoul-1__ups_configuration__20261005

                    Sources EV-773822f6cdd387ebd7269cae
                    Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
                    Facility specifications · KOR · primary:b9526e8ed2b10f567a769443

                    stt-seoul-1

                    Facilities · publisher stated

                    Metric or conditionSource valueBasis, scope and stage
                    utility_feed_voltage22.9 kVOperator announcement · Facilities · operational facility
                    As-of date 2026-06-16
                    Sources EV-9c0971c4e82751cc343a8196
                    Detailed source fields
                    Original source fieldPublished value or condition
                    origin_familydomestic_specifications
                    inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
                    Verification statuspublisher_stated
                    Change typereused
                    Contracting parties

                      The voltage of each of the dual power feeds. It is not converted into total utility supply capacity in MW.

                      Sources, reference dates and retrieval dates 1items
                      www.sttgdc.com ↗

                      Data Source 2026-06-16 · Retrieved 2026-10-05

                      www.sttgdc.com

                      Source location inherited domestic specification stt-seoul-1__utility_feed_voltage__20261005

                      Sources EV-9c0971c4e82751cc343a8196
                      Evidence SHA-256 08ea859ece95d10458e2a9ec6ec95a37616f96a6b93e42fe41ce50a3e43054ad · raw_http_response
                      Start a consultation · Choose a channel