← AI-DC WebtoonEPISODE 04 · 2026.09.05

If you apply through KEPCO,
Is securing power enough?

The mere fact that an application for electricity service has been received does not mean that the capacity and supply schedule have been finalized. You must verify the basis for each step, from the connection point to the scope of construction, fees, and contract terms.

1 cut. AI-DC KOREA 웹툰 4화: 한전 신청과 전력 확보 확정의 차이
1 / 10 · AI-DC KOREA Webtoon Episode 4: The Difference Between Applying to KEPCO and Securing Power Supply
2 cut. 신청 접수는 공급 검토의 시작입니다
2 / 10 · Submitting an application marks the start of the supply review process.
3 cut. 사전검토, 전기사용신청, 기술검토, 계약과 공사의 흐름
3 / 10 · Flowchart of the process: Preliminary Review, Electricity Service Application, Technical Review, Contract, and Construction
4 cut. 접속점과 실제 계통 가용용량을 확인합니다
4 / 10 · Verify the connection points and the actual available grid capacity.
5 cut. 데이터센터 준공과 전력 공급 일정을 맞춥니다
5 / 10 · We align the data center completion schedule with the power supply schedule.
6 cut. 한전 공사와 고객 공사의 범위와 소유 경계를 구분합니다
6 / 10 · Distinguish between the scope and ownership boundaries of KEPCO and customer-owned facilities.
7 cut. 부담금, 납부기한과 공사조건을 확인합니다
7 / 10 · Check the fees, payment deadlines, and construction conditions.
8 cut. 용량, 접속점, 공급시점과 공사범위를 문서에서 확인합니다
8 / 10 · Please refer to the document for details on capacity, connection points, the start date of service, and the scope of construction.
9 cut. 전력 검토문서와 부지를 함께 분석합니다
9 / 10 · We analyze power review documents and site locations together.
10 cut. 경매부지는 낙찰보다 사업 가능성을 먼저 봅니다
10 / 10 · When evaluating auction sites, project feasibility is prioritized over the winning bid.
Key Points

The supply conditions must be verified, not the application number.

The power connection process consists of a preliminary review, an application for electricity service, a technical review, and then the contract and construction phases. Since the connection point, available grid capacity, the earliest possible supply date, and the need for reinforcement work may change during the review process, the project schedule should not be finalized based on a single application form.

Verify the capacity, connection points, supply start date, and scope of work in official documents, and reflect the responsibilities of KEPCO and the customer, fees, payment deadlines, and contract terms in the total development cost. Verbal explanations and the fact of application do not constitute official confirmation of supply.