POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 17items · current page 1–17 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-9c91bcb28d2d65ec7e2570f0
Detailed source fields Original source field Published value or condition stable_project_id kproj_ed527360869eba63 stable_project_key prjtDef:234644:ESB project_definition 234644 first_region_code ESB manual_source_format false project_name 154kV 동평택-북평택 전력구 건설사업 project_name_list 동평택-북평택 송전관로 설치공사 purpose 고덕국제화지구 신규부하 적기공급 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2022.01~2026.10 project_scale_raw 관로 3,363M, 전력구 27M, 지향성압 100M responsible_office_raw 경인건설본부/경기건설지사 equipment_type 전력구 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_ed527360869eba63
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_ed527360869eba63
Sources EV-9c91bcb28d2d65ec7e2570f0 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3c6a5f7796542d993202aad476b834ab740552a4c1bba964f262629205b7bb31 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2022-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|234644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2024-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2023-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|234644|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_b6ff6d7d7898bb37 stable_project_id kproj_ed527360869eba63 source_key 202609|234644|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 동평택-북평택 송전관로 설치공사 project_name_detail 154kV 동평택-북평택 전력구 건설사업 region_summary_raw 경기도 평택시등 1 지역 equipment_type_raw 전력구 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields Project region Pyeongtaek, Gyeonggi Province 사업 규모 관로 3,363M, 전력구 27M, 지향성압 100M 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2022.07 ~ 2023.12 기본설계: 2022.07 ~ 2023.06 실시설계: 2023.06 ~ 2023.12 설계담당자: [redacted] 건설공사 개요 공사 착공: 2024.08 공사 기간: 2024.08 ~ 2026.10 감독자: [redacted], 실적): 99, 81 ○ '22. 3 : 현장답사 및 기본계획 수립 ○ '22. 7 : 설계용역 착수 ○ '23. 6 : 기본설계 심의 ○ '23.10 : 실시설계 심의 ○ '23.12 : 설계용역 준공 ○ '24. 7 : 공사 계약완료 ○ '24. 8 : 공사 착수 ○ '24. 9 : 건설사업관리용역 계약 ○ '25. 3 : 북평택분기구간 사용전검사 완료 ○ '26. 4 : 맨홀 전체 시공완료 및 동평택-북평택 구간 사용전검사 부분1차 시행 ○ '26.10 : 사업 준공 future_plan_redacted □ 향후계획 ○ '22. 3 : 현장답사 및 기본계획 수립 ○ '22. 7 : 설계용역 착수 ○ '23. 6 : 기본설계 심의 ○ '23.10 : 실시설계 심의 ○ '23.12 : 설계용역 준공 ○ '24. 7 : 공사 계약완료 ○ '24. 8 : 공사 착수 ○ '24. 9 : 건설사업관리용역 계약 ○ '25. 3 : 북평택분기구간 사용전검사 완료 ○ '26. 4 : 맨홀 전체 시공완료 및 동평택-북평택 구간 사용전검사 부분1차 시행 ○ '26.10 : 사업 준공 attachment_count 0 source_detail_sha256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234644|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6ff6d7d7898bb37
Sources EV-bd3069bc9c9b5dbc778b5bc4 Evidence SHA-256 82547d1a754b21af208d5f6f2fd96c00eb26f75bf6a897b6005551a8937f52e0 행 SHA-256 a56f574320b4f73d384f1592680068b1788d60799d1bf5ca9e41201a82b96193 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_ed527360869eba63 stable_project_key prjtDef:234644:ESB project_definition 234644 first_region_code ESB manual_source_format false project_name 154kV 동평택-북평택 전력구 건설사업 project_name_list 동평택-북평택 송전관로 설치공사 purpose 고덕국제화지구 신규부하 적기공급 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2022.01~2026.10 project_scale_raw 관로 3,363M, 전력구 27M, 지향성압 100M responsible_office_raw 경인건설본부/경기건설지사 equipment_type 전력구 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_ed527360869eba63
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_ed527360869eba63
Sources EV-9c91bcb28d2d65ec7e2570f0 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 3c6a5f7796542d993202aad476b834ab740552a4c1bba964f262629205b7bb31 Observations for this power asset History for this project