POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 16items · current page 1–16 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-7efcdaf5dca34304400faec3
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_ed1da4b0fe7073e9
stable_project_keyprjtDef:232402:ESB
project_definition232402
first_region_codeESB
manual_source_formatfalse
project_name154kV 내곡분기T/L 건설사업
project_name_list154kV 내곡분기 송전선로 건설사업
purpose창원 의창구 내곡지구 개발에 따른 안정적 공급
project_region_detail경상남도 창원시 의창구,함안군
project_period_raw2020.10~2027.10
project_scale_rawACSR 410㎟×2B×4C, 약 2.6㎞, 철탑7기
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_29df96fae5e757df
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_ed1da4b0fe7073e9

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_ed1da4b0fe7073e9

Sources EV-7efcdaf5dca34304400faec3
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 87889d4f0f4773ac63b67a25c9811df88a809e0e25d48c49258520614a43c86d
Source schedule candidates · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2020-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232402|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_29df96fae5e757df

Sources EV-c33d5795cc517a7b3bd32a0c
Evidence SHA-256 2c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
행 SHA-256 844c31c09840744b35c94cb68daf49d12513caaa6322286b0b457191292c19c9
Source schedule candidates · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232402|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_29df96fae5e757df

Sources EV-c33d5795cc517a7b3bd32a0c
Evidence SHA-256 2c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
행 SHA-256 844c31c09840744b35c94cb68daf49d12513caaa6322286b0b457191292c19c9
Source schedule candidates · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2025-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232402|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_29df96fae5e757df

Sources EV-c33d5795cc517a7b3bd32a0c
Evidence SHA-256 2c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
행 SHA-256 844c31c09840744b35c94cb68daf49d12513caaa6322286b0b457191292c19c9
Source schedule candidates · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232402|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_29df96fae5e757df

Sources EV-c33d5795cc517a7b3bd32a0c
Evidence SHA-256 2c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
행 SHA-256 844c31c09840744b35c94cb68daf49d12513caaa6322286b0b457191292c19c9
Source schedule candidates · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2025-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232402|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_29df96fae5e757df

Sources EV-c33d5795cc517a7b3bd32a0c
Evidence SHA-256 2c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
행 SHA-256 844c31c09840744b35c94cb68daf49d12513caaa6322286b0b457191292c19c9
Source schedule candidates · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232402|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_29df96fae5e757df

Sources EV-c33d5795cc517a7b3bd32a0c
Evidence SHA-256 2c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
행 SHA-256 844c31c09840744b35c94cb68daf49d12513caaa6322286b0b457191292c19c9
Source schedule candidates · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232402|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_29df96fae5e757df

Sources EV-c33d5795cc517a7b3bd32a0c
Evidence SHA-256 2c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
행 SHA-256 844c31c09840744b35c94cb68daf49d12513caaa6322286b0b457191292c19c9
Source schedule candidates · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232402|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_29df96fae5e757df

Sources EV-c33d5795cc517a7b3bd32a0c
Evidence SHA-256 2c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
행 SHA-256 844c31c09840744b35c94cb68daf49d12513caaa6322286b0b457191292c19c9
Source schedule candidates · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2027-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232402|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_29df96fae5e757df

Sources EV-c33d5795cc517a7b3bd32a0c
Evidence SHA-256 2c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
행 SHA-256 844c31c09840744b35c94cb68daf49d12513caaa6322286b0b457191292c19c9
Source schedule candidates · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2021-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232402|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_29df96fae5e757df

Sources EV-c33d5795cc517a7b3bd32a0c
Evidence SHA-256 2c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
행 SHA-256 844c31c09840744b35c94cb68daf49d12513caaa6322286b0b457191292c19c9
Source schedule candidates · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232402|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_29df96fae5e757df

Sources EV-c33d5795cc517a7b3bd32a0c
Evidence SHA-256 2c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
행 SHA-256 844c31c09840744b35c94cb68daf49d12513caaa6322286b0b457191292c19c9
Source schedule candidates · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2023-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232402|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_29df96fae5e757df

Sources EV-c33d5795cc517a7b3bd32a0c
Evidence SHA-256 2c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
행 SHA-256 844c31c09840744b35c94cb68daf49d12513caaa6322286b0b457191292c19c9
Source schedule candidates · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-08
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232402|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_29df96fae5e757df

Sources EV-c33d5795cc517a7b3bd32a0c
Evidence SHA-256 2c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
행 SHA-256 844c31c09840744b35c94cb68daf49d12513caaa6322286b0b457191292c19c9
Source snapshots by date · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_29df96fae5e757df
stable_project_idkproj_ed1da4b0fe7073e9
source_key202609|232402|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 내곡분기 송전선로 건설사업
project_name_detail154kV 내곡분기T/L 건설사업
region_summary_raw경상남도 창원시 의창구등 2 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 창원 의창구 내곡지구 개발에 따른 안정적 공급
Project region
  • 경상남도 창원시 의창구,함안군
Project period
  • 2020.10~2027.10
사업 규모
  • ACSR 410㎟×2B×4C, 약 2.6㎞, 철탑7기
담당 사업소
  • 남부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2023.08 입지선정위원회 구성시기: 2024.08 참여 위원 수 : 17 지장유무 조회: 2025.08~2025.09 경과지(부지) 확정: 2025.02
환경/재해 영향평가
  • 환경영향평가: 2025.05 ~ 재해영향평가: 2025.05 ~
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □ ’23.08 : 전력영향평가 및 경과지 설계용역 계약(한송엔지니어링) □ ’23.08 : 전력영향평가 및 경과지 설계용역 착수회의 시행 □ ’23.10 : 내곡변전소 입지확정 위원회 시행 □ ’23.10 : 지자체대상 사업설명회 시행(함안군, 의창구, 칠북면, 북면) □ ’24.03 : 창원시 의창구 북면행정복지센터 면장 대상 사업설명회 시행 □ ’24.04 : 함안군 칠북면 송전선로 예정경과대역 인근 마을 대상 사업설명회 시행(령동, 령서, 단계, 상촌, 아산) □ ’24.04 : 함안군 칠북면 상촌마을 이장대상 면담 시행 ㅇ 송전선로 건설사업의 필요성 설명 및 질의 응답 □ ’24.05 : 입지선정위원회 구성요청 공문발송 60일 경과일이 지나 공문 미 회신사유 지자체 문의결과 ㅇ 변전소 주민설명회 후 위촉예정으로 기다려달라고 함 □ ’24.07 : 입지선정위원회 구성지연으로 함안군 담당자: [redacted], 16시 : 아산마을 ㅇ 1.9(목) 14시 : 현천마을 □ ’25.01 : 민원인(반대대책위원회) 면담 시행(외부인접견실) ㅇ (내용) 변전소 및 인출철탑 위치 변경, 특별지원 등에 관한 사항 □ ’25.02 : 입지선정위원회 4차 회의 시행(4차?칠북면사무소) ㅇ (참석인원) 16명/17명 ㅇ (회의결과) 최적경과지 선정 완료 □ ’25.03: 경과지 설계 측량 □ ’25.04: 입지확정위원회 서면심의 시행 ㅇ 내용 : 원안(입지선정위원회 최적경과지) 가결 ㅇ 관련문서 : 남부건(송건)-2715(’25.04.22)
[추진실적] '21.10 : 9차 장기송변전설비계획 준공목표 변경(’23.12→'27.10) '23. 3 : 내곡S/S 입지선정실무위원회 합동실태조사 시행 '23. 8 : 전력영향평가 및 경과지 설계용역 계약 '24. 3 : 지자체 대상 사업설명회 완료 '24. 3 : 입지선정 위원회 구성요청(한전 → 지자체) '24. 8 : 송전선로 경과지 입지선정위원회 구성완료 '24. 8 ~ '25. 2: 입지선정위원회 운영 '25. 4: 입지확정위원회 개최 및 경과지 확정 '25. 8: 확정 경과지 지장유무 조회
future_plan_redacted□ 향후계획 [추진실적] '21.10 : 9차 장기송변전설비계획 준공목표 변경(’23.12→'27.10) '23. 3 : 내곡S/S 입지선정실무위원회 합동실태조사 시행 '23. 8 : 전력영향평가 및 경과지 설계용역 계약 '24. 3 : 지자체 대상 사업설명회 완료 '24. 3 : 입지선정 위원회 구성요청(한전 → 지자체) '24. 8 : 송전선로 경과지 입지선정위원회 구성완료 '24. 8 ~ '25. 2: 입지선정위원회 운영 '25. 4: 입지확정위원회 개최 및 경과지 확정 '25. 8: 확정 경과지 지장유무 조회
attachment_count0
source_detail_sha2562c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232402|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_29df96fae5e757df

Sources EV-c33d5795cc517a7b3bd32a0c
Evidence SHA-256 2c6bf418a30377fe58eea676c2817135a5f076c9c6078919d8275387e05f29f9
행 SHA-256 844c31c09840744b35c94cb68daf49d12513caaa6322286b0b457191292c19c9
Source snapshots by date · KOR · kepco_planned

154kV 내곡분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_ed1da4b0fe7073e9
stable_project_keyprjtDef:232402:ESB
project_definition232402
first_region_codeESB
manual_source_formatfalse
project_name154kV 내곡분기T/L 건설사업
project_name_list154kV 내곡분기 송전선로 건설사업
purpose창원 의창구 내곡지구 개발에 따른 안정적 공급
project_region_detail경상남도 창원시 의창구,함안군
project_period_raw2020.10~2027.10
project_scale_rawACSR 410㎟×2B×4C, 약 2.6㎞, 철탑7기
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_29df96fae5e757df
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_ed1da4b0fe7073e9

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_ed1da4b0fe7073e9

Sources EV-7efcdaf5dca34304400faec3
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 87889d4f0f4773ac63b67a25c9811df88a809e0e25d48c49258520614a43c86d

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel