Power assets and projects · KOR · kepco_planned

154kV 병곡S/S(영덕#2) 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-2aded5ebde4bcaf571f9a24c
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e9b52d85de787824
stable_project_keyprjtDef:231637:ESB
project_definition231637
first_region_codeESB
manual_source_formatfalse
project_name154kV 병곡S/S(영덕#2) 건설사업
project_name_list154kV 병곡 변전소 건설사업
purpose영덕지역 과부하 해소 및 신재생에너지 접속 연계
project_region_detail경상북도 영덕군
project_period_raw2024.07~2030.12
project_scale_raw60MVA X 2BANK(최종 4BANK)
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type변전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a2d4b5d38ef990f3
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_e9b52d85de787824

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e9b52d85de787824

Sources EV-2aded5ebde4bcaf571f9a24c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 2269757dba89f97a51b2612aae278ac86d4feb93125bd8b590907d6743100c3e
Source schedule candidates · KOR · kepco_planned

154kV 병곡S/S(영덕#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2030-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231637|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a2d4b5d38ef990f3

Sources EV-5cda5e04ae9c2487aa3057c7
Evidence SHA-256 fd4db831b1862d5fe7df20fa0a59770c2a388b60c816aced9a5f884d337b89dd
행 SHA-256 18c6e579ffcc1d92e58f66482f8318e0505f2b61ade3da5abde8c516218f8366
Source schedule candidates · KOR · kepco_planned

154kV 병곡S/S(영덕#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231637|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a2d4b5d38ef990f3

Sources EV-5cda5e04ae9c2487aa3057c7
Evidence SHA-256 fd4db831b1862d5fe7df20fa0a59770c2a388b60c816aced9a5f884d337b89dd
행 SHA-256 18c6e579ffcc1d92e58f66482f8318e0505f2b61ade3da5abde8c516218f8366
Source schedule candidates · KOR · kepco_planned

154kV 병곡S/S(영덕#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-07
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231637|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a2d4b5d38ef990f3

Sources EV-5cda5e04ae9c2487aa3057c7
Evidence SHA-256 fd4db831b1862d5fe7df20fa0a59770c2a388b60c816aced9a5f884d337b89dd
행 SHA-256 18c6e579ffcc1d92e58f66482f8318e0505f2b61ade3da5abde8c516218f8366
Source schedule candidates · KOR · kepco_planned

154kV 병곡S/S(영덕#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2029-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231637|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a2d4b5d38ef990f3

Sources EV-5cda5e04ae9c2487aa3057c7
Evidence SHA-256 fd4db831b1862d5fe7df20fa0a59770c2a388b60c816aced9a5f884d337b89dd
행 SHA-256 18c6e579ffcc1d92e58f66482f8318e0505f2b61ade3da5abde8c516218f8366
Source schedule candidates · KOR · kepco_planned

154kV 병곡S/S(영덕#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231637|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a2d4b5d38ef990f3

Sources EV-5cda5e04ae9c2487aa3057c7
Evidence SHA-256 fd4db831b1862d5fe7df20fa0a59770c2a388b60c816aced9a5f884d337b89dd
행 SHA-256 18c6e579ffcc1d92e58f66482f8318e0505f2b61ade3da5abde8c516218f8366
Source schedule candidates · KOR · kepco_planned

154kV 병곡S/S(영덕#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2030-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231637|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a2d4b5d38ef990f3

Sources EV-5cda5e04ae9c2487aa3057c7
Evidence SHA-256 fd4db831b1862d5fe7df20fa0a59770c2a388b60c816aced9a5f884d337b89dd
행 SHA-256 18c6e579ffcc1d92e58f66482f8318e0505f2b61ade3da5abde8c516218f8366
Source schedule candidates · KOR · kepco_planned

154kV 병곡S/S(영덕#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2030-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231637|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a2d4b5d38ef990f3

Sources EV-5cda5e04ae9c2487aa3057c7
Evidence SHA-256 fd4db831b1862d5fe7df20fa0a59770c2a388b60c816aced9a5f884d337b89dd
행 SHA-256 18c6e579ffcc1d92e58f66482f8318e0505f2b61ade3da5abde8c516218f8366
Source schedule candidates · KOR · kepco_planned

154kV 병곡S/S(영덕#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2025-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231637|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a2d4b5d38ef990f3

Sources EV-5cda5e04ae9c2487aa3057c7
Evidence SHA-256 fd4db831b1862d5fe7df20fa0a59770c2a388b60c816aced9a5f884d337b89dd
행 SHA-256 18c6e579ffcc1d92e58f66482f8318e0505f2b61ade3da5abde8c516218f8366
Source snapshots by date · KOR · kepco_planned

154kV 병곡S/S(영덕#2) 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_a2d4b5d38ef990f3
stable_project_idkproj_e9b52d85de787824
source_key202609|231637|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 병곡 변전소 건설사업
project_name_detail154kV 병곡S/S(영덕#2) 건설사업
region_summary_raw경상북도 영덕군등 1 지역
equipment_type_raw변전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 영덕지역 과부하 해소 및 신재생에너지 접속 연계
Project region
  • 경상북도 영덕군
Project period
  • 2024.07~2030.12
사업 규모
  • 60MVA X 2BANK(최종 4BANK)
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2024.10 입지선정위원회 구성시기: 2025.02 참여 위원 수 : 16 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
○ '29.06 : 변전공사 착공 ○ '30.12 : 준공 및 가압
future_plan_redacted□ 향후계획 ○ '29.06 : 변전공사 착공 ○ '30.12 : 준공 및 가압
attachment_count0
source_detail_sha256fd4db831b1862d5fe7df20fa0a59770c2a388b60c816aced9a5f884d337b89dd
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231637|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a2d4b5d38ef990f3

Sources EV-5cda5e04ae9c2487aa3057c7
Evidence SHA-256 fd4db831b1862d5fe7df20fa0a59770c2a388b60c816aced9a5f884d337b89dd
행 SHA-256 18c6e579ffcc1d92e58f66482f8318e0505f2b61ade3da5abde8c516218f8366
Source snapshots by date · KOR · kepco_planned

154kV 병곡S/S(영덕#2) 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e9b52d85de787824
stable_project_keyprjtDef:231637:ESB
project_definition231637
first_region_codeESB
manual_source_formatfalse
project_name154kV 병곡S/S(영덕#2) 건설사업
project_name_list154kV 병곡 변전소 건설사업
purpose영덕지역 과부하 해소 및 신재생에너지 접속 연계
project_region_detail경상북도 영덕군
project_period_raw2024.07~2030.12
project_scale_raw60MVA X 2BANK(최종 4BANK)
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type변전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a2d4b5d38ef990f3
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_e9b52d85de787824

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e9b52d85de787824

Sources EV-2aded5ebde4bcaf571f9a24c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 2269757dba89f97a51b2612aae278ac86d4feb93125bd8b590907d6743100c3e

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel