Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 4items · current page 1–4 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 동안양S/S 옥내화 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-47f5192642799af36a661f2c
Sources EV-15bf7a4a6d3fe00b938d77de Evidence SHA-256 cda55d00542df391366ccedf01b1c3a9c2255740eada4ac09e4ac65d05c083b0 행 SHA-256 a99f09c1ad9b4dbe8a59493dcc6ddeb6d8f6a826cbb9bf130cc8252bd5a883f1Source snapshots by date · KOR · kepco_planned
154kV 동안양S/S 옥내화 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_3ad69561a802c935
stable_project_id
kproj_d8ad1b27288e40ec
source_key
202609|9231231|ESB
basic_ym
202609
source_stage_raw
project_name_list
154kV 동안양S/S 옥내화 건설사업
project_name_detail
154kV 동안양S/S 옥내화 건설사업
region_summary_raw
경기도 의왕시등 1 지역
equipment_type_raw
지중송전
headquarters_raw
경기본부
office_raw
직할
section_fields
Project purpose
전력공급 신뢰도 향상 및 노후설비 재정비로 지역민원
Project region
경기도 의왕시
Project period
사업 규모
○주변압기:4BANK, ○GIS:170KV×16CCT,25.8KV×39CCT
담당 사업소
경기본부/직할
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-15bf7a4a6d3fe00b938d77de Evidence SHA-256 cda55d00542df391366ccedf01b1c3a9c2255740eada4ac09e4ac65d05c083b0 행 SHA-256 a99f09c1ad9b4dbe8a59493dcc6ddeb6d8f6a826cbb9bf130cc8252bd5a883f1Source snapshots by date · KOR · kepco_planned