Power assets and projects · KOR · kepco_planned

154kV 북신갈S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-b9013a9a317fe0b0bb5809dd
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_ca11150c139231a4
stable_project_keyprjtDef:231613:ESB
project_definition231613
first_region_codeESB
manual_source_formatfalse
project_name154kV 북신갈S/S 건설사업
project_name_list154kV 북신갈변전소 건설사업
purpose용인플랫폼시티 신규부하 공급
project_region_detail경기도 용인시 기흥구
project_period_raw2023.04~2028.04
project_scale_raw154KV M.TR(60MVA) × 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_79e03da3e08b4098
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_ca11150c139231a4

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_ca11150c139231a4

Sources EV-b9013a9a317fe0b0bb5809dd
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 38387b9b8eb32add5b84bb60f77f0107ff6a81eb047991f4a9fe683e3586a49e
Source schedule candidates · KOR · kepco_planned

154kV 북신갈S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231613|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_79e03da3e08b4098

Sources EV-4b2a53b37b8d0884fb0fa63b
Evidence SHA-256 4136dc98d3228d36fae97ee9a10f51b7fcaba665dce33d01e3fb8cec47ed499c
행 SHA-256 32bb4fbd8023b3a1387cbfecf5bbcf9d966ca9b74494a2f2e9b3b0a548720f08
Source schedule candidates · KOR · kepco_planned

154kV 북신갈S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231613|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_79e03da3e08b4098

Sources EV-4b2a53b37b8d0884fb0fa63b
Evidence SHA-256 4136dc98d3228d36fae97ee9a10f51b7fcaba665dce33d01e3fb8cec47ed499c
행 SHA-256 32bb4fbd8023b3a1387cbfecf5bbcf9d966ca9b74494a2f2e9b3b0a548720f08
Source snapshots by date · KOR · kepco_planned

154kV 북신갈S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_79e03da3e08b4098
stable_project_idkproj_ca11150c139231a4
source_key202609|231613|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 북신갈변전소 건설사업
project_name_detail154kV 북신갈S/S 건설사업
region_summary_raw경기도 용인시 기흥구등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 용인플랫폼시티 신규부하 공급
Project region
  • 경기도 용인시 기흥구
Project period
  • 2023.04~2028.04
사업 규모
  • 154KV M.TR(60MVA) × 2BANK
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
  • 제10차 장기송변전설비계획 반영(2023.04)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 2024.02 참여 위원 수 : 13 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • □ ‘22. 3 : 용인플랫폼시티도시개발사업 개발계획 승인고시 ○ 변전소 부지 최초 반영 (2,706㎡) □ ’24.12 : 용인플랫폼시티 도시개발사업 실시계획 승인 ○ 용인시 고시 제 2024-776호, 변전소 부지 최초 반영 (2,979㎡) □ '25. 2 : 입지확정위원회 구성 및 시행 □ '25. 4 : 154kV 북신갈S/S 건설사업 부지확정 보고
[현재 추진현황] □ '26. 하반기 : 변전소 부지 관련 산단 국토부 실시계획 변경승인 대기(시행사 : 경기주택도시공사) [향후계획] □ ’28. 6 : 토건공사 착공 □ ‘28. 7 : 변전공사 착공 □ ’31.10 : 변전소 최초가압 (복합사옥 건설시)
future_plan_redacted□ 향후계획 [현재 추진현황] □ '26. 하반기 : 변전소 부지 관련 산단 국토부 실시계획 변경승인 대기(시행사 : 경기주택도시공사) [향후계획] □ ’28. 6 : 토건공사 착공 □ ‘28. 7 : 변전공사 착공 □ ’31.10 : 변전소 최초가압 (복합사옥 건설시)
attachment_count0
source_detail_sha2564136dc98d3228d36fae97ee9a10f51b7fcaba665dce33d01e3fb8cec47ed499c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231613|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_79e03da3e08b4098

Sources EV-4b2a53b37b8d0884fb0fa63b
Evidence SHA-256 4136dc98d3228d36fae97ee9a10f51b7fcaba665dce33d01e3fb8cec47ed499c
행 SHA-256 32bb4fbd8023b3a1387cbfecf5bbcf9d966ca9b74494a2f2e9b3b0a548720f08
Source snapshots by date · KOR · kepco_planned

154kV 북신갈S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_ca11150c139231a4
stable_project_keyprjtDef:231613:ESB
project_definition231613
first_region_codeESB
manual_source_formatfalse
project_name154kV 북신갈S/S 건설사업
project_name_list154kV 북신갈변전소 건설사업
purpose용인플랫폼시티 신규부하 공급
project_region_detail경기도 용인시 기흥구
project_period_raw2023.04~2028.04
project_scale_raw154KV M.TR(60MVA) × 2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_79e03da3e08b4098
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_ca11150c139231a4

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_ca11150c139231a4

Sources EV-b9013a9a317fe0b0bb5809dd
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 38387b9b8eb32add5b84bb60f77f0107ff6a81eb047991f4a9fe683e3586a49e

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel