Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 남해S/S단일계통해소 관로 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-b3a9fb74895fff4c12b90d3f
Sources EV-2d5df40e2e7aa9c9e274974b Evidence SHA-256 be6c6f7bbd45ecf58d62ad01c45b4004d0428e12c88005798ed0f9fb92c8023e 행 SHA-256 ed5ebe907d4c447ffc749439d3c0ea1ef6934cbcd8d2eaf3ec658cfc2999e9bfSource snapshots by date · KOR · kepco_planned
154kV 남해S/S단일계통해소 관로 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_228ce57b03cba47c
stable_project_id
kproj_c5d2c32ce1124c0d
source_key
202609|234681|ESB
basic_ym
202609
source_stage_raw
계획확정-사업승인전
project_name_list
.
project_name_detail
154kV 남해S/S단일계통해소 관로 건설사업
region_summary_raw
경상남도 하동군등 1 지역
equipment_type_raw
전력구
headquarters_raw
남부건설본부
office_raw
직할
section_fields
Project purpose
남해S/S 단일계통해소 및 남해지역 전력수요증가 대비
Project region
경상남도 하동군
Project period
2024.01~2027.10
사업 규모
관로 400M, 강관압입 100M
담당 사업소
남부건설본부/직할
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-2d5df40e2e7aa9c9e274974b Evidence SHA-256 be6c6f7bbd45ecf58d62ad01c45b4004d0428e12c88005798ed0f9fb92c8023e 행 SHA-256 ed5ebe907d4c447ffc749439d3c0ea1ef6934cbcd8d2eaf3ec658cfc2999e9bfSource snapshots by date · KOR · kepco_planned