POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-cf18d1b197c0b46242143783
Detailed source fields Original source field Published value or condition stable_project_id kproj_ba7449f14635ffa6 stable_project_key prjtDef:232591:ESB project_definition 232591 first_region_code ESB manual_source_format false project_name 154kV 고림분기T/L 건설사업 project_name_list 154kV 고림분기 송전선로 건설사업 purpose 용인국제물류단지 및 154KV 고림변전소 전? project_region_detail 경기도 용인시 처인구 project_period_raw 2021.12~2027.12 project_scale_raw ACSR410×2B,2KM-6기[4C-1.3KM(6기),2C-0.7KM(0기)] responsible_office_raw 경인건설본부/직할 equipment_type 가공송전 headquarters 경인건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_ba7449f14635ffa6
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_ba7449f14635ffa6
Sources EV-cf18d1b197c0b46242143783 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 5154d5e3bab1eaf65ce2ab7b6fd6d455816b46f1ddbfb73410ff02f992eae013 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232591|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_88b42f628129c617
Sources EV-5637896e5d4779636bc39ba9 Evidence SHA-256 884b83df480ed72d899ca3270a2a0492fa83df7f2d4e17332641dae36922834a 행 SHA-256 eca6e5b394e9292402d1aad2c81a5ac6e6ddf73a180322761727ee79454d4fe9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232591|ESB migration_status revision2_new_snapshot_period_only
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_88b42f628129c617
Sources EV-5637896e5d4779636bc39ba9 Evidence SHA-256 884b83df480ed72d899ca3270a2a0492fa83df7f2d4e17332641dae36922834a 행 SHA-256 eca6e5b394e9292402d1aad2c81a5ac6e6ddf73a180322761727ee79454d4fe9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_88b42f628129c617 stable_project_id kproj_ba7449f14635ffa6 source_key 202609|232591|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 고림분기 송전선로 건설사업 project_name_detail 154kV 고림분기T/L 건설사업 region_summary_raw 경기도 용인시 처인구등 1 지역 equipment_type_raw 가공송전 headquarters_raw 경인건설본부 office_raw 직할 section_fields Project purpose 용인국제물류단지 및 154KV 고림변전소 전? 사업 규모 ACSR410×2B,2KM-6기[4C-1.3KM(6기),2C-0.7KM(0기)] 입지선정 전력입지영향평가 용역 착수: 2022.03 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2022.07~2022.07 경과지(부지) 확정: 2022.07 환경/재해 영향평가 환경영향평가: 2023.01 ~ 2024.06 재해영향평가: 2023.01 ~ 2024.06 주민의견 수렴 지자체 공고 열람: 2022.12 ~ 설명회·공청회: 2022.12 자체설명회: 2022.12 ~ 사업설계 설계용역: 2022.03 ~ 2024.12 기본설계: 2024.05 ~ 2024.06 실시설계: 2024.06 ~ 설계담당자: [redacted] 건설공사 개요 공사 착공: 2025.06 공사 기간: 2025.06 ~ 2027.12 감독자: [redacted], 실적): 98, 28 ○'21.09 : 제9차 장기 송변전설비계획 신규 반영 ○'22.02 : 154kV 고림변전소 입지 확정(용인 국제물류4.0 물류단지 內) ○'22.03 : 154kV 고림분기T/L 경과지 선정 및 설계측량 용역 착수 ○'22.06 : 154kV 고림분기T/L 후보 경과시 선정 ○'22.07 : 관계기관 지장유무 조회(안성시, 육군OO사단, 한국도로공사) ○'22.12 : 사업시행계획 공고,공람 및 주민설명회 시행 ○'23.08 : 전원개발사업 실시계획승인 관계기관 의견조회(산업부→중앙정부 및 지자체) ○'24.09 : 전원개발사업 실시계획승인 고시 ○'24.12 : 실시설계 완료 ○'25.06 : 공사착수 ○'27.02 : 선로가압 future_plan_redacted □ 향후계획 ○'21.09 : 제9차 장기 송변전설비계획 신규 반영 ○'22.02 : 154kV 고림변전소 입지 확정(용인 국제물류4.0 물류단지 內) ○'22.03 : 154kV 고림분기T/L 경과지 선정 및 설계측량 용역 착수 ○'22.06 : 154kV 고림분기T/L 후보 경과시 선정 ○'22.07 : 관계기관 지장유무 조회(안성시, 육군OO사단, 한국도로공사) ○'22.12 : 사업시행계획 공고,공람 및 주민설명회 시행 ○'23.08 : 전원개발사업 실시계획승인 관계기관 의견조회(산업부→중앙정부 및 지자체) ○'24.09 : 전원개발사업 실시계획승인 고시 ○'24.12 : 실시설계 완료 ○'25.06 : 공사착수 ○'27.02 : 선로가압 attachment_count 0 source_detail_sha256 884b83df480ed72d899ca3270a2a0492fa83df7f2d4e17332641dae36922834a first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232591|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_88b42f628129c617
Sources EV-5637896e5d4779636bc39ba9 Evidence SHA-256 884b83df480ed72d899ca3270a2a0492fa83df7f2d4e17332641dae36922834a 행 SHA-256 eca6e5b394e9292402d1aad2c81a5ac6e6ddf73a180322761727ee79454d4fe9 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_ba7449f14635ffa6 stable_project_key prjtDef:232591:ESB project_definition 232591 first_region_code ESB manual_source_format false project_name 154kV 고림분기T/L 건설사업 project_name_list 154kV 고림분기 송전선로 건설사업 purpose 용인국제물류단지 및 154KV 고림변전소 전? project_region_detail 경기도 용인시 처인구 project_period_raw 2021.12~2027.12 project_scale_raw ACSR410×2B,2KM-6기[4C-1.3KM(6기),2C-0.7KM(0기)] responsible_office_raw 경인건설본부/직할 equipment_type 가공송전 headquarters 경인건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_ba7449f14635ffa6
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_ba7449f14635ffa6
Sources EV-cf18d1b197c0b46242143783 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 5154d5e3bab1eaf65ce2ab7b6fd6d455816b46f1ddbfb73410ff02f992eae013 Observations for this power asset History for this project