POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 21items · current page 1–21 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-b7cd04fc83c7751966aa60ce
Detailed source fields Original source field Published value or condition stable_project_id kproj_b1f0a25d88da7d23 stable_project_key prjtDef:231427:ESB project_definition 231427 first_region_code ESB manual_source_format false project_name 154kV 북세종S/S 건설사업 project_name_list 154kV 북세종S/S 건설사업 purpose 행정중심복합도시 개발에 따른 안정적 전력공급 project_region_detail Sejong Special Self-Governing City project_period_raw 2021.09~2028.10 project_scale_raw 45/60MVA X 2BANK(최종4BANK) responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_b1f0a25d88da7d23
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_b1f0a25d88da7d23
Sources EV-b7cd04fc83c7751966aa60ce Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 ed9808322050398c4fedd4dfbca74a0abee34c53789b268e2e5c39484e9bbb3b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-09 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2015-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2022-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2027-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2027-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2022-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type plan_change date 2022-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2021-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2028-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2028-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2022-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231427|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_0d48f7fe6786d85a stable_project_id kproj_b1f0a25d88da7d23 source_key 202609|231427|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 북세종S/S 건설사업 project_name_detail 154kV 북세종S/S 건설사업 region_summary_raw 세종특별자치시등 1 지역 equipment_type_raw 변전 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project region Sejong Special Self-Governing City 사업 규모 45/60MVA X 2BANK(최종4BANK) 계획확정 제07차 장기송변전설비계획 반영(2015.07) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2022.09 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 □ `21.09 : 9차 장기송변전설비계획 (준공목표 조정 : ’25.10→’28.10) □ `22.03 : 입지선정 실무위원회 회의 시행 (6-2生 한별리 317-8 일원 선정) □ `22.07 : 행복도시건설사업 개발계획 변경 고시 [제2022-17호(‘22. 7. 5)] □ `22.09 : 변전소 부지 확정(입지확정위원회 시행결과 : 6-2生 한별리 317-8 일원 사업설계 설계용역: 기본설계: 2026.06 ~ 2026.07 실시설계: 설계담당자: [redacted] □ `26.10 : 변전소 부지내 지장철탑 이설공사 착수(공사 : '26.11) □ `27.01 : 변전소 토건공사 착수 □ `27.03 : 변전소 변전공사 착수 □ `28.10 : 준공 future_plan_redacted □ 향후계획 □ `26.10 : 변전소 부지내 지장철탑 이설공사 착수(공사 : '26.11) □ `27.01 : 변전소 토건공사 착수 □ `27.03 : 변전소 변전공사 착수 □ `28.10 : 준공 attachment_count 0 source_detail_sha256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231427|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0d48f7fe6786d85a
Sources EV-4b7835d41ffa266a39363b1a Evidence SHA-256 eb45358f0ec4f86edbe3b026a2a3fd66fb6056497dab2b312bb4e0b1e7bbb911 행 SHA-256 085496b0686f5a40bfcc3bb57f12483480ce542e5c34bacf5c04191e6dd1bd1f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_b1f0a25d88da7d23 stable_project_key prjtDef:231427:ESB project_definition 231427 first_region_code ESB manual_source_format false project_name 154kV 북세종S/S 건설사업 project_name_list 154kV 북세종S/S 건설사업 purpose 행정중심복합도시 개발에 따른 안정적 전력공급 project_region_detail Sejong Special Self-Governing City project_period_raw 2021.09~2028.10 project_scale_raw 45/60MVA X 2BANK(최종4BANK) responsible_office_raw 중부건설본부/직할 equipment_type 변전 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_b1f0a25d88da7d23
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_b1f0a25d88da7d23
Sources EV-b7cd04fc83c7751966aa60ce Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 ed9808322050398c4fedd4dfbca74a0abee34c53789b268e2e5c39484e9bbb3b Observations for this power asset History for this project