POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 9items · current page 1–9 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북신갈분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-e47aef5d0c6d1319fc661875
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_a937d83b6123b776
stable_project_keyprjtDef:234762:ESB
project_definition234762
first_region_codeESB
manual_source_formatfalse
project_name154kV 북신갈분기 전력구 건설사업
project_name_list154kV 북신갈분기 전력구 건설사업
purpose용인플랫폼시티 계통보강
project_region_detail경기도 용인시 기흥구
project_period_raw2024.01~2027.09
project_scale_rawXLPE 1,200㎟ 4C
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_125133d2ffe00d09
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_a937d83b6123b776

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_a937d83b6123b776

Sources EV-e47aef5d0c6d1319fc661875
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1224fd7e8292330596642f1794bea3f546fe165e652f0cb851b57fd76d566648
Source schedule candidates · KOR · kepco_planned

154kV 북신갈분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234762|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_125133d2ffe00d09

Sources EV-52e298b0b760bf7ca4e314f3
Evidence SHA-256 76433a78c54bd5e9d2bde2e63a002a9fe70955c71207a39ad3e2286282d83589
행 SHA-256 e6be73c8463588a1d6aaa8abbc645722368fa81aa674428ae4502189dde5202c
Source schedule candidates · KOR · kepco_planned

154kV 북신갈분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234762|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_125133d2ffe00d09

Sources EV-52e298b0b760bf7ca4e314f3
Evidence SHA-256 76433a78c54bd5e9d2bde2e63a002a9fe70955c71207a39ad3e2286282d83589
행 SHA-256 e6be73c8463588a1d6aaa8abbc645722368fa81aa674428ae4502189dde5202c
Source schedule candidates · KOR · kepco_planned

154kV 북신갈분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_start
date2024-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234762|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_125133d2ffe00d09

Sources EV-52e298b0b760bf7ca4e314f3
Evidence SHA-256 76433a78c54bd5e9d2bde2e63a002a9fe70955c71207a39ad3e2286282d83589
행 SHA-256 e6be73c8463588a1d6aaa8abbc645722368fa81aa674428ae4502189dde5202c
Source schedule candidates · KOR · kepco_planned

154kV 북신갈분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-09
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234762|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_125133d2ffe00d09

Sources EV-52e298b0b760bf7ca4e314f3
Evidence SHA-256 76433a78c54bd5e9d2bde2e63a002a9fe70955c71207a39ad3e2286282d83589
행 SHA-256 e6be73c8463588a1d6aaa8abbc645722368fa81aa674428ae4502189dde5202c
Source schedule candidates · KOR · kepco_planned

154kV 북신갈분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234762|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_125133d2ffe00d09

Sources EV-52e298b0b760bf7ca4e314f3
Evidence SHA-256 76433a78c54bd5e9d2bde2e63a002a9fe70955c71207a39ad3e2286282d83589
행 SHA-256 e6be73c8463588a1d6aaa8abbc645722368fa81aa674428ae4502189dde5202c
Source schedule candidates · KOR · kepco_planned

154kV 북신갈분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234762|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_125133d2ffe00d09

Sources EV-52e298b0b760bf7ca4e314f3
Evidence SHA-256 76433a78c54bd5e9d2bde2e63a002a9fe70955c71207a39ad3e2286282d83589
행 SHA-256 e6be73c8463588a1d6aaa8abbc645722368fa81aa674428ae4502189dde5202c
Source snapshots by date · KOR · kepco_planned

154kV 북신갈분기 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_125133d2ffe00d09
stable_project_idkproj_a937d83b6123b776
source_key202609|234762|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 북신갈분기 전력구 건설사업
project_name_detail154kV 북신갈분기 전력구 건설사업
region_summary_raw경기도 용인시 기흥구등 1 지역
equipment_type_raw전력구
headquarters_raw경인건설본부
office_raw직할
section_fields
Project purpose
  • 용인플랫폼시티 계통보강
Project region
  • 경기도 용인시 기흥구
Project period
  • 2024.01~2027.09
사업 규모
  • XLPE 1,200㎟ 4C
담당 사업소
  • 경인건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
○ '24.05 : 현장답사분석 보고 및 기본계획 수립 ○ '24.06 : 배전선로 참여 계획 문의 및 회신 ○ '24.07 : 설계용역 시행품의 및 발주 ○ '24.09 : 설계용역 착수
future_plan_redacted□ 향후계획 ○ '24.05 : 현장답사분석 보고 및 기본계획 수립 ○ '24.06 : 배전선로 참여 계획 문의 및 회신 ○ '24.07 : 설계용역 시행품의 및 발주 ○ '24.09 : 설계용역 착수
attachment_count0
source_detail_sha25676433a78c54bd5e9d2bde2e63a002a9fe70955c71207a39ad3e2286282d83589
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234762|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_125133d2ffe00d09

Sources EV-52e298b0b760bf7ca4e314f3
Evidence SHA-256 76433a78c54bd5e9d2bde2e63a002a9fe70955c71207a39ad3e2286282d83589
행 SHA-256 e6be73c8463588a1d6aaa8abbc645722368fa81aa674428ae4502189dde5202c
Source snapshots by date · KOR · kepco_planned

154kV 북신갈분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_a937d83b6123b776
stable_project_keyprjtDef:234762:ESB
project_definition234762
first_region_codeESB
manual_source_formatfalse
project_name154kV 북신갈분기 전력구 건설사업
project_name_list154kV 북신갈분기 전력구 건설사업
purpose용인플랫폼시티 계통보강
project_region_detail경기도 용인시 기흥구
project_period_raw2024.01~2027.09
project_scale_rawXLPE 1,200㎟ 4C
responsible_office_raw경인건설본부/직할
equipment_type전력구
headquarters경인건설본부
office직할
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_125133d2ffe00d09
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_a937d83b6123b776

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_a937d83b6123b776

Sources EV-e47aef5d0c6d1319fc661875
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1224fd7e8292330596642f1794bea3f546fe165e652f0cb851b57fd76d566648

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel