POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 13items · current page 1–13 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-847e59d6e05efe5567428f52
Detailed source fields Original source field Published value or condition stable_project_id kproj_8aa4ef55c08bcb0b stable_project_key prjtDef:231608:ESB project_definition 231608 first_region_code ESB manual_source_format false project_name 154kV 권선(舊,탑동)S/S 건설사업 project_name_list 154kV 권선변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경기도 수원시 권선구 project_period_raw 2023.04~2028.04 project_scale_raw 154KV M.TR(60MVA)×2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_8aa4ef55c08bcb0b
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_8aa4ef55c08bcb0b
Sources EV-847e59d6e05efe5567428f52 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1a27f8411797271d8b9f966325d7cffe90188ab3e765dc416b94359418e75cac Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231608|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b5a8493c29232ad
Sources EV-1d526403fff14f564c0b54a0 Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6 행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2028-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231608|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b5a8493c29232ad
Sources EV-1d526403fff14f564c0b54a0 Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6 행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231608|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b5a8493c29232ad
Sources EV-1d526403fff14f564c0b54a0 Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6 행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2028-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231608|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b5a8493c29232ad
Sources EV-1d526403fff14f564c0b54a0 Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6 행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231608|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b5a8493c29232ad
Sources EV-1d526403fff14f564c0b54a0 Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6 행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2028-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231608|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b5a8493c29232ad
Sources EV-1d526403fff14f564c0b54a0 Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6 행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2029-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231608|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b5a8493c29232ad
Sources EV-1d526403fff14f564c0b54a0 Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6 행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231608|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b5a8493c29232ad
Sources EV-1d526403fff14f564c0b54a0 Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6 행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231608|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b5a8493c29232ad
Sources EV-1d526403fff14f564c0b54a0 Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6 행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-04 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231608|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b5a8493c29232ad
Sources EV-1d526403fff14f564c0b54a0 Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6 행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_3b5a8493c29232ad stable_project_id kproj_8aa4ef55c08bcb0b source_key 202609|231608|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 권선변전소 건설사업 project_name_detail 154kV 권선(舊,탑동)S/S 건설사업 region_summary_raw 경기도 수원시 권선구등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 기본설계: 실시설계: 설계담당자: [redacted] [진행경과] ○ '23.04 : 제10차 장기송변전설비계획 신규반영 ○ '25.12 : 효행지구 도시개발사업 실시계획인가(화성시 고시 제2025-975호) ○ '25.12 : 입지선정실무위윈회 시행 [향후계획] ○ '26.05 : 변전소 입지 확정 ○ '28.01 : 실시설계 완료 ○ '28.05 : 토건공사 착공 ○ '28.07 : 변전공사 착공 ○ '29.04 : 변전소 최초가압 future_plan_redacted □ 향후계획 [진행경과] ○ '23.04 : 제10차 장기송변전설비계획 신규반영 ○ '25.12 : 효행지구 도시개발사업 실시계획인가(화성시 고시 제2025-975호) ○ '25.12 : 입지선정실무위윈회 시행 [향후계획] ○ '26.05 : 변전소 입지 확정 ○ '28.01 : 실시설계 완료 ○ '28.05 : 토건공사 착공 ○ '28.07 : 변전공사 착공 ○ '29.04 : 변전소 최초가압 attachment_count 0 source_detail_sha256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231608|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_3b5a8493c29232ad
Sources EV-1d526403fff14f564c0b54a0 Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6 행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_8aa4ef55c08bcb0b stable_project_key prjtDef:231608:ESB project_definition 231608 first_region_code ESB manual_source_format false project_name 154kV 권선(舊,탑동)S/S 건설사업 project_name_list 154kV 권선변전소 건설사업 purpose 변전설비 적기확충으로 안정적 전력공급 project_region_detail 경기도 수원시 권선구 project_period_raw 2023.04~2028.04 project_scale_raw 154KV M.TR(60MVA)×2BANK responsible_office_raw 경인건설본부/경기건설지사 equipment_type 변전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_8aa4ef55c08bcb0b
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_8aa4ef55c08bcb0b
Sources EV-847e59d6e05efe5567428f52 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 1a27f8411797271d8b9f966325d7cffe90188ab3e765dc416b94359418e75cac Observations for this power asset History for this project