POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 13items · current page 1–13 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 권선(舊,탑동)S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-847e59d6e05efe5567428f52
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_8aa4ef55c08bcb0b
stable_project_keyprjtDef:231608:ESB
project_definition231608
first_region_codeESB
manual_source_formatfalse
project_name154kV 권선(舊,탑동)S/S 건설사업
project_name_list154kV 권선변전소 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail경기도 수원시 권선구
project_period_raw2023.04~2028.04
project_scale_raw154KV M.TR(60MVA)×2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_3b5a8493c29232ad
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_8aa4ef55c08bcb0b

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_8aa4ef55c08bcb0b

Sources EV-847e59d6e05efe5567428f52
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1a27f8411797271d8b9f966325d7cffe90188ab3e765dc416b94359418e75cac
Source schedule candidates · KOR · kepco_planned

154kV 권선(舊,탑동)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231608|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b5a8493c29232ad

Sources EV-1d526403fff14f564c0b54a0
Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6
행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882
Source schedule candidates · KOR · kepco_planned

154kV 권선(舊,탑동)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2028-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231608|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b5a8493c29232ad

Sources EV-1d526403fff14f564c0b54a0
Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6
행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882
Source schedule candidates · KOR · kepco_planned

154kV 권선(舊,탑동)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231608|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b5a8493c29232ad

Sources EV-1d526403fff14f564c0b54a0
Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6
행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882
Source schedule candidates · KOR · kepco_planned

154kV 권선(舊,탑동)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2028-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231608|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b5a8493c29232ad

Sources EV-1d526403fff14f564c0b54a0
Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6
행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882
Source schedule candidates · KOR · kepco_planned

154kV 권선(舊,탑동)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231608|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b5a8493c29232ad

Sources EV-1d526403fff14f564c0b54a0
Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6
행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882
Source schedule candidates · KOR · kepco_planned

154kV 권선(舊,탑동)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2028-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231608|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b5a8493c29232ad

Sources EV-1d526403fff14f564c0b54a0
Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6
행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882
Source schedule candidates · KOR · kepco_planned

154kV 권선(舊,탑동)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2029-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231608|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b5a8493c29232ad

Sources EV-1d526403fff14f564c0b54a0
Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6
행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882
Source schedule candidates · KOR · kepco_planned

154kV 권선(舊,탑동)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231608|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b5a8493c29232ad

Sources EV-1d526403fff14f564c0b54a0
Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6
행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882
Source schedule candidates · KOR · kepco_planned

154kV 권선(舊,탑동)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231608|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b5a8493c29232ad

Sources EV-1d526403fff14f564c0b54a0
Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6
행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882
Source schedule candidates · KOR · kepco_planned

154kV 권선(舊,탑동)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231608|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b5a8493c29232ad

Sources EV-1d526403fff14f564c0b54a0
Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6
행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882
Source snapshots by date · KOR · kepco_planned

154kV 권선(舊,탑동)S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_3b5a8493c29232ad
stable_project_idkproj_8aa4ef55c08bcb0b
source_key202609|231608|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 권선변전소 건설사업
project_name_detail154kV 권선(舊,탑동)S/S 건설사업
region_summary_raw경기도 수원시 권선구등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 변전설비 적기확충으로 안정적 전력공급
Project region
  • 경기도 수원시 권선구
Project period
  • 2023.04~2028.04
사업 규모
  • 154KV M.TR(60MVA)×2BANK
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
[진행경과] ○ '23.04 : 제10차 장기송변전설비계획 신규반영 ○ '25.12 : 효행지구 도시개발사업 실시계획인가(화성시 고시 제2025-975호) ○ '25.12 : 입지선정실무위윈회 시행 [향후계획] ○ '26.05 : 변전소 입지 확정 ○ '28.01 : 실시설계 완료 ○ '28.05 : 토건공사 착공 ○ '28.07 : 변전공사 착공 ○ '29.04 : 변전소 최초가압
future_plan_redacted□ 향후계획 [진행경과] ○ '23.04 : 제10차 장기송변전설비계획 신규반영 ○ '25.12 : 효행지구 도시개발사업 실시계획인가(화성시 고시 제2025-975호) ○ '25.12 : 입지선정실무위윈회 시행 [향후계획] ○ '26.05 : 변전소 입지 확정 ○ '28.01 : 실시설계 완료 ○ '28.05 : 토건공사 착공 ○ '28.07 : 변전공사 착공 ○ '29.04 : 변전소 최초가압
attachment_count0
source_detail_sha256da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231608|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_3b5a8493c29232ad

Sources EV-1d526403fff14f564c0b54a0
Evidence SHA-256 da45206339f25a0a68d87cd04f6482f5d0e31e95db8675cb8da3f753603a4fa6
행 SHA-256 f1fe5c7a328ee8dca6bf4f5e825d6e3375df676186d32978366da0927c054882
Source snapshots by date · KOR · kepco_planned

154kV 권선(舊,탑동)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_8aa4ef55c08bcb0b
stable_project_keyprjtDef:231608:ESB
project_definition231608
first_region_codeESB
manual_source_formatfalse
project_name154kV 권선(舊,탑동)S/S 건설사업
project_name_list154kV 권선변전소 건설사업
purpose변전설비 적기확충으로 안정적 전력공급
project_region_detail경기도 수원시 권선구
project_period_raw2023.04~2028.04
project_scale_raw154KV M.TR(60MVA)×2BANK
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_3b5a8493c29232ad
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_8aa4ef55c08bcb0b

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_8aa4ef55c08bcb0b

Sources EV-847e59d6e05efe5567428f52
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1a27f8411797271d8b9f966325d7cffe90188ab3e765dc416b94359418e75cac

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel