Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 병곡(영덕#2)분기T/L 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-8734299670d6cf971ac1693c
Sources EV-f636ab7d450308cc29be26e7 Evidence SHA-256 61d8b2704bb3e730bb00cb5565f8eae07586a87a8e81db2f8464c2635527fc0b 행 SHA-256 465b4099fb2b5ca9e5969fa0ad99eeb51ac2b4c339aff311dafd77d902eb7c86Source snapshots by date · KOR · kepco_planned
154kV 병곡(영덕#2)분기T/L 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_cbfb15d36083efde
stable_project_id
kproj_87f389f424acf9bb
source_key
202609|232619|ESB
basic_ym
202609
source_stage_raw
계획확정-사업승인전
project_name_list
154kV 병곡분기T/L 건설공사
project_name_detail
154kV 병곡(영덕#2)분기T/L 건설사업
region_summary_raw
경상북도 영덕군등 1 지역
equipment_type_raw
가공송전
headquarters_raw
남부건설본부
office_raw
대구경북건설지사
section_fields
Project purpose
영덕지역 재생E 계통연계
Project region
경상북도 영덕군
Project period
2023.04~2030.12
사업 규모
ACSR/AW 410B*4C*3KM, 9기
담당 사업소
남부건설본부/대구경북건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 2024.09 입지선정위원회 구성시기: 2025.02 참여 위원 수 : 16 경과지(부지) 확정: 2025.11
Sources EV-f636ab7d450308cc29be26e7 Evidence SHA-256 61d8b2704bb3e730bb00cb5565f8eae07586a87a8e81db2f8464c2635527fc0b 행 SHA-256 465b4099fb2b5ca9e5969fa0ad99eeb51ac2b4c339aff311dafd77d902eb7c86Source snapshots by date · KOR · kepco_planned