Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 북세종분기T/L 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-66985b3a492f42b12683718e
Sources EV-b1d55c5fa7d0463d1a757bd1 Evidence SHA-256 209f56e25e9809c0f45d76c24d149f9ddb4bb1e54c13ab57b605108e82485910 행 SHA-256 c426dbaa46b4035676cd8c713cc33c55d6d7667c15b08b43037f59c1478701d1Source snapshots by date · KOR · kepco_planned
154kV 북세종분기T/L 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_b1bfc23a76ee81b9
stable_project_id
kproj_7b0cce043edcacf0
source_key
202609|232432|ESB
basic_ym
202609
source_stage_raw
계획확정-사업승인전
project_name_list
154kV 북세종분기T/L 건설사업
project_name_detail
154kV 북세종분기T/L 건설사업
region_summary_raw
세종특별자치시등 1 지역
equipment_type_raw
가공송전
headquarters_raw
중부건설본부
office_raw
직할
section_fields
Project purpose
행복도시 개발에 따른 신규부하 공급
Project region
Sejong Special Self-Governing City
Project period
2019.11~2028.10
사업 규모
HSTACIR330㎟×4C×2.0KM
담당 사업소
중부건설본부/직할
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2024.04
Sources EV-b1d55c5fa7d0463d1a757bd1 Evidence SHA-256 209f56e25e9809c0f45d76c24d149f9ddb4bb1e54c13ab57b605108e82485910 행 SHA-256 c426dbaa46b4035676cd8c713cc33c55d6d7667c15b08b43037f59c1478701d1Source snapshots by date · KOR · kepco_planned