POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북세종분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-66985b3a492f42b12683718e
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7b0cce043edcacf0
stable_project_keyprjtDef:232432:ESB
project_definition232432
first_region_codeESB
manual_source_formatfalse
project_name154kV 북세종분기T/L 건설사업
project_name_list154kV 북세종분기T/L 건설사업
purpose행복도시 개발에 따른 신규부하 공급
project_region_detailSejong Special Self-Governing City
project_period_raw2019.11~2028.10
project_scale_rawHSTACIR330㎟×4C×2.0KM
responsible_office_raw중부건설본부/직할
equipment_type가공송전
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b1bfc23a76ee81b9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_7b0cce043edcacf0

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7b0cce043edcacf0

Sources EV-66985b3a492f42b12683718e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 08ea828c0d9d19e8936b542be721e4e55ff7215fb19c02c99c03f21ebe43005e
Source schedule candidates · KOR · kepco_planned

154kV 북세종분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2019-11
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232432|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b1bfc23a76ee81b9

Sources EV-b1d55c5fa7d0463d1a757bd1
Evidence SHA-256 209f56e25e9809c0f45d76c24d149f9ddb4bb1e54c13ab57b605108e82485910
행 SHA-256 c426dbaa46b4035676cd8c713cc33c55d6d7667c15b08b43037f59c1478701d1
Source schedule candidates · KOR · kepco_planned

154kV 북세종분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232432|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b1bfc23a76ee81b9

Sources EV-b1d55c5fa7d0463d1a757bd1
Evidence SHA-256 209f56e25e9809c0f45d76c24d149f9ddb4bb1e54c13ab57b605108e82485910
행 SHA-256 c426dbaa46b4035676cd8c713cc33c55d6d7667c15b08b43037f59c1478701d1
Source snapshots by date · KOR · kepco_planned

154kV 북세종분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_b1bfc23a76ee81b9
stable_project_idkproj_7b0cce043edcacf0
source_key202609|232432|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 북세종분기T/L 건설사업
project_name_detail154kV 북세종분기T/L 건설사업
region_summary_raw세종특별자치시등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 행복도시 개발에 따른 신규부하 공급
Project region
  • Sejong Special Self-Governing City
Project period
  • 2019.11~2028.10
사업 규모
  • HSTACIR330㎟×4C×2.0KM
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2024.04
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
□ ’11.03 : 제 5차 장기송배전설비계획 반영(준공목표 ’28년 이후) □ ’16.07 : 7차장기송변전설비계획 준공목표 조정(’28년이후→’22.04) □ ’18.01 : 준공목표 변경(←계통계획처, ’20.04→’24.10) □ ’20.04 : 준공목표 변경(←계통계획처, ’24.10→’25.10) □ ’21.10 : 제9차 장기 송변전설비계획 반영(’25.10→’28.10) □ ’22.03 : 북세종S/S 입지선정 실무위원회 개최 □ ’22.10 : 변전소 입지 확정 완료 □ ’24.03 : 북세종분기T/L 지중화 심의 시행 □ ’24.04 : 북세종분기T/L 지중화 심의 결과보고(→송변전건설단, 계통계획처)
future_plan_redacted□ 향후계획 □ ’11.03 : 제 5차 장기송배전설비계획 반영(준공목표 ’28년 이후) □ ’16.07 : 7차장기송변전설비계획 준공목표 조정(’28년이후→’22.04) □ ’18.01 : 준공목표 변경(←계통계획처, ’20.04→’24.10) □ ’20.04 : 준공목표 변경(←계통계획처, ’24.10→’25.10) □ ’21.10 : 제9차 장기 송변전설비계획 반영(’25.10→’28.10) □ ’22.03 : 북세종S/S 입지선정 실무위원회 개최 □ ’22.10 : 변전소 입지 확정 완료 □ ’24.03 : 북세종분기T/L 지중화 심의 시행 □ ’24.04 : 북세종분기T/L 지중화 심의 결과보고(→송변전건설단, 계통계획처)
attachment_count0
source_detail_sha256209f56e25e9809c0f45d76c24d149f9ddb4bb1e54c13ab57b605108e82485910
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232432|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b1bfc23a76ee81b9

Sources EV-b1d55c5fa7d0463d1a757bd1
Evidence SHA-256 209f56e25e9809c0f45d76c24d149f9ddb4bb1e54c13ab57b605108e82485910
행 SHA-256 c426dbaa46b4035676cd8c713cc33c55d6d7667c15b08b43037f59c1478701d1
Source snapshots by date · KOR · kepco_planned

154kV 북세종분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7b0cce043edcacf0
stable_project_keyprjtDef:232432:ESB
project_definition232432
first_region_codeESB
manual_source_formatfalse
project_name154kV 북세종분기T/L 건설사업
project_name_list154kV 북세종분기T/L 건설사업
purpose행복도시 개발에 따른 신규부하 공급
project_region_detailSejong Special Self-Governing City
project_period_raw2019.11~2028.10
project_scale_rawHSTACIR330㎟×4C×2.0KM
responsible_office_raw중부건설본부/직할
equipment_type가공송전
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b1bfc23a76ee81b9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_7b0cce043edcacf0

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7b0cce043edcacf0

Sources EV-66985b3a492f42b12683718e
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 08ea828c0d9d19e8936b542be721e4e55ff7215fb19c02c99c03f21ebe43005e

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel