POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 18items · current page 1–18 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-24e07ecff8bf833feec515b2
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7027a3bafa0b72f5
stable_project_keyprjtDef:234668:ESB
project_definition234668
first_region_codeESB
manual_source_formatfalse
project_name154kV 남춘천-춘천 전력구 건설사업
project_name_list전력구
purpose상정고장시 춘천시 154KV선로 과부하 해소
project_region_detail강원특별자치도 춘천시
project_period_raw2025.11~2028.02
project_scale_raw관로 5,152M,쉴드TBM 1,333M, 압입 65M
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type전력구
headquarters중부건설본부
office충북강원건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e979d153d1bd990f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_7027a3bafa0b72f5

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7027a3bafa0b72f5

Sources EV-24e07ecff8bf833feec515b2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 714211ac45e8a662c60eb79dc32f1a43f0b30fc76b1de3f3cb3fbe469d2dc955
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-11
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2024-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-02
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2028-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2028-02
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source schedule candidates · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2024-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234668|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source snapshots by date · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_e979d153d1bd990f
stable_project_idkproj_7027a3bafa0b72f5
source_key202609|234668|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list전력구
project_name_detail154kV 남춘천-춘천 전력구 건설사업
region_summary_raw강원특별자치도 춘천시등 1 지역
equipment_type_raw전력구
headquarters_raw중부건설본부
office_raw충북강원건설지사
section_fields
Project purpose
  • 상정고장시 춘천시 154KV선로 과부하 해소
Project region
  • 강원특별자치도 춘천시
Project period
  • 2025.11~2028.02
사업 규모
  • 관로 5,152M,쉴드TBM 1,333M, 압입 65M
담당 사업소
  • 중부건설본부/충북강원건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2023.07 ~ 2024.07 기본설계: 2023.07 ~ 2023.12 실시설계: 2024.01 ~ 2024.07 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.11 공사 기간: 2025.11 ~ 2028.02 감독자: [redacted], 실적): 71, 3
'24.07 : 실시설계 완료 '24.08 : 구매처에서 계약 진행 예정 '25.11 : 공사착공 '28.06: 공사준공 예정
future_plan_redacted□ 향후계획 '24.07 : 실시설계 완료 '24.08 : 구매처에서 계약 진행 예정 '25.11 : 공사착공 '28.06: 공사준공 예정
attachment_count0
source_detail_sha25637aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234668|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e979d153d1bd990f

Sources EV-83df188d2791da15917dd588
Evidence SHA-256 37aca7c0eef391d2e0a2c173298cf0db382a258836d14a537475484e760b6b0f
행 SHA-256 3d9abf92adf928220a445ace4eae0bad6fe00fcd02b87402a0975f974a2f463e
Source snapshots by date · KOR · kepco_planned

154kV 남춘천-춘천 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_7027a3bafa0b72f5
stable_project_keyprjtDef:234668:ESB
project_definition234668
first_region_codeESB
manual_source_formatfalse
project_name154kV 남춘천-춘천 전력구 건설사업
project_name_list전력구
purpose상정고장시 춘천시 154KV선로 과부하 해소
project_region_detail강원특별자치도 춘천시
project_period_raw2025.11~2028.02
project_scale_raw관로 5,152M,쉴드TBM 1,333M, 압입 65M
responsible_office_raw중부건설본부/충북강원건설지사
equipment_type전력구
headquarters중부건설본부
office충북강원건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e979d153d1bd990f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_7027a3bafa0b72f5

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_7027a3bafa0b72f5

Sources EV-24e07ecff8bf833feec515b2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 714211ac45e8a662c60eb79dc32f1a43f0b30fc76b1de3f3cb3fbe469d2dc955

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel