POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 40items · current page 1–40 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 345 kV literal project name label not service voltage · project name · Construction project As-of date Not stated Sources EV-b8f3b1e479fc3ad4eb0103db
Detailed source fields Original source field Published value or condition stable_project_id kproj_6de04392a7f64e85 stable_project_key manual:6:0:- project_definition 0 first_region_code manual_source_format true project_name 345kV 서남권 해상풍력 공동접속설비 건설사업 project_name_list 345kV 서남권 해상풍력 공동접속설비 건설사업 purpose 전북 서남권 해상풍력 발전전력(2.4GW) 계통연계 project_region_detail 전북특별자치도 부안군,정읍시 project_period_raw 2024.03~2031.12 project_scale_raw 가공 35km / 지중 6km responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_6de04392a7f64e85
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_6de04392a7f64e85
Sources EV-b8f3b1e479fc3ad4eb0103db Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f4d5f5ac285013abac97d03179aedec5f144ae8900fb19a6f8236754986e9aa2 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2031-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2026-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2029-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2028-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-02 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2031-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12-31 date_precision day assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-08 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 6|0| migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_801b930996d5f6fb stable_project_id kproj_6de04392a7f64e85 source_key 6|0| basic_ym 6 source_stage_raw 계획확정-사업승인전 project_name_list 345kV 서남권 해상풍력 공동접속설비 건설사업 project_name_detail 345kV 서남권 해상풍력 공동접속설비 건설사업 region_summary_raw 전북특별자치도 부안군등 2 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 전북건설지사 section_fields Project purpose 전북 서남권 해상풍력 발전전력(2.4GW) 계통연계 입지선정 전력입지영향평가 용역 착수: 2023.02 입지선정위원회 구성시기: 2024.06 참여 위원 수 : 35 지장유무 조회: 2026.08~2026.09 경과지(부지) 확정: 2026.09 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 □ '24.03 : 부안군으로 양육점 결정 □ '24.04 ~ '24.05 : 부안군, 정읍시 주민 대상 사업설명회 시행 □ '24.06 : 입지선정위원 구성 □ '24.07 ~ '24.10 : 제1~3차 입지선정위원회 회의 - 내용 : 선호도 조사에 따른 후보 경과 대역 발표 → 대역 내 주민설명 후 차기 회의 예정 □ '24.11 ~ '25.02 : 정읍시, 부안군 읍면동별 주민 대상 사업설명회 시행 □ '25.02 ~ '25.06 : 제4~5차 입지선정위원회 회의 - 내용 : 최적경과대역 확정 □ '25.07 ~ '25.08 : 주민소통 간담회 시행(최적경과대역 내 마을 대상) □ '25.09 ~ '25.12 : 제6~9차 입지선정위원회 회의 - 내용 : 최적경과지 의결 단계에서 위원 단체 불참으로 인한 회의 2회 무산 □ '25.12 : 입지선정위원회 운영기간 종료('25.12.31) □ '26.01 : 입지선정위원회 생략공고 □ '26.04 ~ '26.06 : 제1차 주민소통 간담회 통한 대안위원회 사전 안내 □ '26.06 : 제1차 대안위원회 회의 - 내용 : 입지선정위원회 결과 승계 등 □ '26.07 : 제2차 대안위원회 회의 - 내용 : 후보경과지 2개안으로 압축 등 □ '26.07 ~ '26.08 : 2차 주민소통 간담회 통한 대안위원회 경과 안내 □ '26.08 : 제3차 대안위원회 회의 - 내용 : 주민의견 청취 중간보고 등 □ '26.08 : 제4차 대안위원회 회의 - 내용 : 후보경과지 일부구간 조정 등 □ '26.09 : 제5차 대안위원회 회의 - 내용 : 최적경과지 확정 등 □ '28.03 : 전원개발사업 실시계획 승인 □ '29.01 : 공사 착공 □ '31.12 : 공사 준공 future_plan_redacted □ 향후계획 □ '28.03 : 전원개발사업 실시계획 승인 □ '29.01 : 공사 착공 □ '31.12 : 공사 준공 attachment_count 2 source_detail_sha256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 6 source_record_id 6|0|
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_801b930996d5f6fb
Sources EV-508cae2f78f3db0165b51878 Evidence SHA-256 af1b7e58415eb1a98a6ba8b69415639ebb2fd0753b09fce867a3cf6af0e08fc5 행 SHA-256 9f1ed7a5fa95a65d39d9cbfa151e4d82188f25dabf486730da5a66a34e2fbd11 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_6de04392a7f64e85 stable_project_key manual:6:0:- project_definition 0 first_region_code manual_source_format true project_name 345kV 서남권 해상풍력 공동접속설비 건설사업 project_name_list 345kV 서남권 해상풍력 공동접속설비 건설사업 purpose 전북 서남권 해상풍력 발전전력(2.4GW) 계통연계 project_region_detail 전북특별자치도 부안군,정읍시 project_period_raw 2024.03~2031.12 project_scale_raw 가공 35km / 지중 6km responsible_office_raw 중부건설본부/전북건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 전북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_6de04392a7f64e85
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source Not stated · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_6de04392a7f64e85
Sources EV-b8f3b1e479fc3ad4eb0103db Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f4d5f5ac285013abac97d03179aedec5f144ae8900fb19a6f8236754986e9aa2 Observations for this power asset History for this project