Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 농생#2분기 전력구 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-f61f08b08ed14de517daeb89
Sources EV-2c8ed2921fa66844d4df7d82 Evidence SHA-256 5111758d3d6efe8d1c55d686141f22e10ac8d05bfd3c7260a7a191f7dc7463f5 행 SHA-256 8e91da8d4597d61e414e23e92de85730ef6c6de3f2c0a3affcc36cbfbd2d21e3Source snapshots by date · KOR · kepco_planned
154kV 농생#2분기 전력구 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_6566c76c0392bafe
stable_project_id
kproj_653c1e4e4cae6f81
source_key
202609|234601|ESB
basic_ym
202609
source_stage_raw
계획확정-사업승인전
project_name_list
154kV 농생#2분기 전력구 건설사업
project_name_detail
154kV 농생#2분기 전력구 건설사업
region_summary_raw
전북특별자치도 군산시등 1 지역
equipment_type_raw
전력구
headquarters_raw
중부건설본부
office_raw
전북건설지사
section_fields
Project purpose
신규부하 해소
Project region
전북특별자치도 군산시
Project period
2029.07~2032.05
사업 규모
154KV 송전 4회선 전력구 6KM
담당 사업소
중부건설본부/전북건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-2c8ed2921fa66844d4df7d82 Evidence SHA-256 5111758d3d6efe8d1c55d686141f22e10ac8d05bfd3c7260a7a191f7dc7463f5 행 SHA-256 8e91da8d4597d61e414e23e92de85730ef6c6de3f2c0a3affcc36cbfbd2d21e3Source snapshots by date · KOR · kepco_planned