POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 9items · current page 1–9 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북과천(과천#2)S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-9e97e9e22a2afc6bf1380ab2
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_5e42006cb0769d07
stable_project_keyprjtDef:231512:ESB
project_definition231512
first_region_codeESB
manual_source_formatfalse
project_name154kV 북과천(과천#2)S/S 건설사업
project_name_list154kV 북과천S/S 건설사업
purpose과천지역 전력공급
project_region_detail경기도 과천시
project_period_raw2021.09~2029.06
project_scale_raw154KV MTR 60MVA×2BANK, 170KV GIS×10CCT
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b6deb720bd2c827a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_5e42006cb0769d07

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_5e42006cb0769d07

Sources EV-9e97e9e22a2afc6bf1380ab2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 95f1d1364ccbc36fa6a05ae7f4a0a5d3a1ed93f4af10f1112173c59ec0951633
Source schedule candidates · KOR · kepco_planned

154kV 북과천(과천#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2029-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231512|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6deb720bd2c827a

Sources EV-7e6e92c87869a738405e4abf
Evidence SHA-256 859224d213d1b0402818967fd0a3e71b369ebac0039faea1f24da15ac5238ffc
행 SHA-256 e87d6d1a47ba137b29c42f8270ffc2cc20dc055a196b17963676f5dc34602c37
Source schedule candidates · KOR · kepco_planned

154kV 북과천(과천#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231512|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6deb720bd2c827a

Sources EV-7e6e92c87869a738405e4abf
Evidence SHA-256 859224d213d1b0402818967fd0a3e71b369ebac0039faea1f24da15ac5238ffc
행 SHA-256 e87d6d1a47ba137b29c42f8270ffc2cc20dc055a196b17963676f5dc34602c37
Source schedule candidates · KOR · kepco_planned

154kV 북과천(과천#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231512|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6deb720bd2c827a

Sources EV-7e6e92c87869a738405e4abf
Evidence SHA-256 859224d213d1b0402818967fd0a3e71b369ebac0039faea1f24da15ac5238ffc
행 SHA-256 e87d6d1a47ba137b29c42f8270ffc2cc20dc055a196b17963676f5dc34602c37
Source schedule candidates · KOR · kepco_planned

154kV 북과천(과천#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231512|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6deb720bd2c827a

Sources EV-7e6e92c87869a738405e4abf
Evidence SHA-256 859224d213d1b0402818967fd0a3e71b369ebac0039faea1f24da15ac5238ffc
행 SHA-256 e87d6d1a47ba137b29c42f8270ffc2cc20dc055a196b17963676f5dc34602c37
Source schedule candidates · KOR · kepco_planned

154kV 북과천(과천#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-09
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231512|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6deb720bd2c827a

Sources EV-7e6e92c87869a738405e4abf
Evidence SHA-256 859224d213d1b0402818967fd0a3e71b369ebac0039faea1f24da15ac5238ffc
행 SHA-256 e87d6d1a47ba137b29c42f8270ffc2cc20dc055a196b17963676f5dc34602c37
Source schedule candidates · KOR · kepco_planned

154kV 북과천(과천#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2021-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231512|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6deb720bd2c827a

Sources EV-7e6e92c87869a738405e4abf
Evidence SHA-256 859224d213d1b0402818967fd0a3e71b369ebac0039faea1f24da15ac5238ffc
행 SHA-256 e87d6d1a47ba137b29c42f8270ffc2cc20dc055a196b17963676f5dc34602c37
Source snapshots by date · KOR · kepco_planned

154kV 북과천(과천#2)S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_b6deb720bd2c827a
stable_project_idkproj_5e42006cb0769d07
source_key202609|231512|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 북과천S/S 건설사업
project_name_detail154kV 북과천(과천#2)S/S 건설사업
region_summary_raw경기도 과천시등 1 지역
equipment_type_raw변전
headquarters_raw경인건설본부
office_raw남서울인천건설지사
section_fields
Project purpose
  • 과천지역 전력공급
Project region
  • 경기도 과천시
Project period
  • 2021.09~2029.06
사업 규모
  • 154KV MTR 60MVA×2BANK, 170KV GIS×10CCT
담당 사업소
  • 경인건설본부/남서울인천건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2025.07 ~ 2025.12 실시설계: 2026.01 ~ 설계담당자: [redacted]
□ ‘21.10 ~ : 과천 3기 신도시내 변전소 부지 관련 협의(↔LH측) □ ‘24. 8.14 : 과천과천택지지구 실시계획 승인 □ ‘25. 5.: 토건실시설계 착수 □ ‘26. 10.: 토건공사 착수 예정
future_plan_redacted□ 향후계획 □ ‘21.10 ~ : 과천 3기 신도시내 변전소 부지 관련 협의(↔LH측) □ ‘24. 8.14 : 과천과천택지지구 실시계획 승인 □ ‘25. 5.: 토건실시설계 착수 □ ‘26. 10.: 토건공사 착수 예정
attachment_count0
source_detail_sha256859224d213d1b0402818967fd0a3e71b369ebac0039faea1f24da15ac5238ffc
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231512|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6deb720bd2c827a

Sources EV-7e6e92c87869a738405e4abf
Evidence SHA-256 859224d213d1b0402818967fd0a3e71b369ebac0039faea1f24da15ac5238ffc
행 SHA-256 e87d6d1a47ba137b29c42f8270ffc2cc20dc055a196b17963676f5dc34602c37
Source snapshots by date · KOR · kepco_planned

154kV 북과천(과천#2)S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_5e42006cb0769d07
stable_project_keyprjtDef:231512:ESB
project_definition231512
first_region_codeESB
manual_source_formatfalse
project_name154kV 북과천(과천#2)S/S 건설사업
project_name_list154kV 북과천S/S 건설사업
purpose과천지역 전력공급
project_region_detail경기도 과천시
project_period_raw2021.09~2029.06
project_scale_raw154KV MTR 60MVA×2BANK, 170KV GIS×10CCT
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type변전
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b6deb720bd2c827a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_5e42006cb0769d07

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_5e42006cb0769d07

Sources EV-9e97e9e22a2afc6bf1380ab2
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 95f1d1364ccbc36fa6a05ae7f4a0a5d3a1ed93f4af10f1112173c59ec0951633

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel