Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 남춘천-춘천 지중T/L 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-ef9a627b209970cda5de7a02
Sources EV-859323575ea6bf6df730d0f9 Evidence SHA-256 8e01ebcb122d12c91d760c9e1ff9ec336e19f4f0fa1db65f0bf6bcbdc8c418e1 행 SHA-256 5b8b735dc6a96ce7e4ab1f2528e0d2013ced6ab3acb1fef5bdf96cbcdaba04acSource snapshots by date · KOR · kepco_planned
154kV 남춘천-춘천 지중T/L 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_86003330a1859a93
stable_project_id
kproj_54526c5f5fde9d58
source_key
202609|233730|ESB
basic_ym
202609
source_stage_raw
계획확정-사업승인전
project_name_list
154kV 남춘천-춘천 지중T/L 건설사업
project_name_detail
154kV 남춘천-춘천 지중T/L 건설사업
region_summary_raw
강원특별자치도 춘천시등 1 지역
equipment_type_raw
지중송전
headquarters_raw
중부건설본부
office_raw
직할
section_fields
Project purpose
춘천지역 송전선로 과부하 해소
Project region
강원특별자치도 춘천시
Project period
2026.01~2026.12
사업 규모
XLPE 2000㎟ X 2C 6.1KM
담당 사업소
중부건설본부/직할
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-859323575ea6bf6df730d0f9 Evidence SHA-256 8e01ebcb122d12c91d760c9e1ff9ec336e19f4f0fa1db65f0bf6bcbdc8c418e1 행 SHA-256 5b8b735dc6a96ce7e4ab1f2528e0d2013ced6ab3acb1fef5bdf96cbcdaba04acSource snapshots by date · KOR · kepco_planned