POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 고수S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-c0273f6fa51b8712d09c67b9
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_4bd63e7ae4f79e08
stable_project_keyprjtDef:231559:ESB
project_definition231559
first_region_codeESB
manual_source_formatfalse
project_name154kV 고수S/S 건설사업
project_name_list154kV 고수S/S 건설사업
purpose고창지역 신재생발전 접속용량 확보
project_region_detail전북특별자치도 고창군
project_period_raw2021.10~2028.10
project_scale_raw154KV M.TR 60MVA × 2BANK
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b71de56c659f426e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_4bd63e7ae4f79e08

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_4bd63e7ae4f79e08

Sources EV-c0273f6fa51b8712d09c67b9
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 f5db70570ccb6c0c17d57bfcd4f0e1dd10580c102a338f18523418ecfd474f4f
Source schedule candidates · KOR · kepco_planned

154kV 고수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231559|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b71de56c659f426e

Sources EV-9e463ddd664a0ea402e7f05c
Evidence SHA-256 98211bf84793fe576411e4f253abac2cf0678aaedd0c4fb8985df0df889f1081
행 SHA-256 86a29113f3115ffc77424b3e9014bee8834a2161938e113229aab0a17a459e51
Source schedule candidates · KOR · kepco_planned

154kV 고수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231559|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b71de56c659f426e

Sources EV-9e463ddd664a0ea402e7f05c
Evidence SHA-256 98211bf84793fe576411e4f253abac2cf0678aaedd0c4fb8985df0df889f1081
행 SHA-256 86a29113f3115ffc77424b3e9014bee8834a2161938e113229aab0a17a459e51
Source snapshots by date · KOR · kepco_planned

154kV 고수S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_b71de56c659f426e
stable_project_idkproj_4bd63e7ae4f79e08
source_key202609|231559|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 고수S/S 건설사업
project_name_detail154kV 고수S/S 건설사업
region_summary_raw전북특별자치도 고창군등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 고창지역 신재생발전 접속용량 확보
Project region
  • 전북특별자치도 고창군
Project period
  • 2021.10~2028.10
사업 규모
  • 154KV M.TR 60MVA × 2BANK
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2024.01 입지선정위원회 구성시기: 2024.01 참여 위원 수 : 17 지장유무 조회: 2024.03~2024.04 경과지(부지) 확정: 2024.07
환경/재해 영향평가
  • 환경영향평가: 2025.03 ~ 재해영향평가: 2025.03 ~
주민의견 수렴
  • 지자체 공고 열람: 2025.04 ~ 2025.05 설명회·공청회: 2025.04 자체설명회: 2023.08 ~ 2023.10
입지선정 및 주민의견 수렴 주요 내용
[추진실적] □'21.10 : 제9차 장기 송변전설비계획 신규 반영 □'23.04 : 입지선정실무위원회 구성 및 1차 회의 □'23.05 : 도로점용(굴착) 심의결과 "불가" 회신 □'23.06 : 고창#3S/S 및 분기T/L 인출방안 변경 추진 □'23.07 : 송전선로 인출방안 변경 관련 지자체 안내(고창군) □'23.08 ~ 10 : 최적부지대약 마을대표 사업설명회(고수면 부곡마을 등 6개 마을대표) □'23.11 : 전력영향평가 용역 발주 □'24.01 ~ 05 : 입지선정위원회 구성 및 시행 □'24.07 : 입지확정위원회 구성 및 심의 □'25.03 : 사업시행계획 제출 □'25.04 ~ 05 : 지자체 열람공고 및 신문공고 시행 □'25.04 : 주민설명회 시행 □'25.06 : 전원개발사업 실시계획 승인 신청 [향후계획] □'26.05 : 전원개발사업 실시계획 승인 □'27.03 : 변전소 토건공사 착공 □'28.10 : 변전설비 가압
future_plan_redacted□ 향후계획 [추진실적] □'21.10 : 제9차 장기 송변전설비계획 신규 반영 □'23.04 : 입지선정실무위원회 구성 및 1차 회의 □'23.05 : 도로점용(굴착) 심의결과 "불가" 회신 □'23.06 : 고창#3S/S 및 분기T/L 인출방안 변경 추진 □'23.07 : 송전선로 인출방안 변경 관련 지자체 안내(고창군) □'23.08 ~ 10 : 최적부지대약 마을대표 사업설명회(고수면 부곡마을 등 6개 마을대표) □'23.11 : 전력영향평가 용역 발주 □'24.01 ~ 05 : 입지선정위원회 구성 및 시행 □'24.07 : 입지확정위원회 구성 및 심의 □'25.03 : 사업시행계획 제출 □'25.04 ~ 05 : 지자체 열람공고 및 신문공고 시행 □'25.04 : 주민설명회 시행 □'25.06 : 전원개발사업 실시계획 승인 신청 [향후계획] □'26.05 : 전원개발사업 실시계획 승인 □'27.03 : 변전소 토건공사 착공 □'28.10 : 변전설비 가압
attachment_count0
source_detail_sha25698211bf84793fe576411e4f253abac2cf0678aaedd0c4fb8985df0df889f1081
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231559|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b71de56c659f426e

Sources EV-9e463ddd664a0ea402e7f05c
Evidence SHA-256 98211bf84793fe576411e4f253abac2cf0678aaedd0c4fb8985df0df889f1081
행 SHA-256 86a29113f3115ffc77424b3e9014bee8834a2161938e113229aab0a17a459e51
Source snapshots by date · KOR · kepco_planned

154kV 고수S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_4bd63e7ae4f79e08
stable_project_keyprjtDef:231559:ESB
project_definition231559
first_region_codeESB
manual_source_formatfalse
project_name154kV 고수S/S 건설사업
project_name_list154kV 고수S/S 건설사업
purpose고창지역 신재생발전 접속용량 확보
project_region_detail전북특별자치도 고창군
project_period_raw2021.10~2028.10
project_scale_raw154KV M.TR 60MVA × 2BANK
responsible_office_raw중부건설본부/전북건설지사
equipment_type변전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b71de56c659f426e
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_4bd63e7ae4f79e08

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_4bd63e7ae4f79e08

Sources EV-c0273f6fa51b8712d09c67b9
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 f5db70570ccb6c0c17d57bfcd4f0e1dd10580c102a338f18523418ecfd474f4f

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel