POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 15items · current page 1–15 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-8b59eb06e76b6c32acb2caf4
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_3deedea2ccd15144
stable_project_keyprjtDef:233784:ESB
project_definition233784
first_region_codeESB
manual_source_formatfalse
project_name154kV 사직-율량 지중T/L 건설사업
project_name_list154kV 사직-율량 지중T/L 건설사업
purpose345㎸ 신청주 및 인근 변전소 고장전류 초과
project_region_detail충청북도 청주시 청원구,청주시 흥덕구
project_period_raw2024.01~2026.10
project_scale_raw154㎸ XLPE 2,000㎟, 2C × 6.12KM
responsible_office_raw중부건설본부/직할
equipment_type지중송전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a789ff250797acc1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_3deedea2ccd15144

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_3deedea2ccd15144

Sources EV-8b59eb06e76b6c32acb2caf4
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 8512c32f6c2a3ea23c98f8770d424bdac464499995cb11cb152344889fbd9c5e
Source schedule candidates · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233784|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a789ff250797acc1

Sources EV-ab1250ac5e3cb90cf105ebb5
Evidence SHA-256 7ef46377ef865ae17e990412ad1f439ff13246ead1b0f10d5b738abe66e69878
행 SHA-256 19dcf8527cab45abc4d22d0b7e496c5e37a79e7c21c85e797ae3679450b56baa
Source schedule candidates · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233784|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a789ff250797acc1

Sources EV-ab1250ac5e3cb90cf105ebb5
Evidence SHA-256 7ef46377ef865ae17e990412ad1f439ff13246ead1b0f10d5b738abe66e69878
행 SHA-256 19dcf8527cab45abc4d22d0b7e496c5e37a79e7c21c85e797ae3679450b56baa
Source schedule candidates · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233784|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a789ff250797acc1

Sources EV-ab1250ac5e3cb90cf105ebb5
Evidence SHA-256 7ef46377ef865ae17e990412ad1f439ff13246ead1b0f10d5b738abe66e69878
행 SHA-256 19dcf8527cab45abc4d22d0b7e496c5e37a79e7c21c85e797ae3679450b56baa
Source schedule candidates · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233784|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a789ff250797acc1

Sources EV-ab1250ac5e3cb90cf105ebb5
Evidence SHA-256 7ef46377ef865ae17e990412ad1f439ff13246ead1b0f10d5b738abe66e69878
행 SHA-256 19dcf8527cab45abc4d22d0b7e496c5e37a79e7c21c85e797ae3679450b56baa
Source schedule candidates · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233784|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a789ff250797acc1

Sources EV-ab1250ac5e3cb90cf105ebb5
Evidence SHA-256 7ef46377ef865ae17e990412ad1f439ff13246ead1b0f10d5b738abe66e69878
행 SHA-256 19dcf8527cab45abc4d22d0b7e496c5e37a79e7c21c85e797ae3679450b56baa
Source schedule candidates · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2023-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233784|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a789ff250797acc1

Sources EV-ab1250ac5e3cb90cf105ebb5
Evidence SHA-256 7ef46377ef865ae17e990412ad1f439ff13246ead1b0f10d5b738abe66e69878
행 SHA-256 19dcf8527cab45abc4d22d0b7e496c5e37a79e7c21c85e797ae3679450b56baa
Source schedule candidates · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233784|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a789ff250797acc1

Sources EV-ab1250ac5e3cb90cf105ebb5
Evidence SHA-256 7ef46377ef865ae17e990412ad1f439ff13246ead1b0f10d5b738abe66e69878
행 SHA-256 19dcf8527cab45abc4d22d0b7e496c5e37a79e7c21c85e797ae3679450b56baa
Source schedule candidates · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233784|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a789ff250797acc1

Sources EV-ab1250ac5e3cb90cf105ebb5
Evidence SHA-256 7ef46377ef865ae17e990412ad1f439ff13246ead1b0f10d5b738abe66e69878
행 SHA-256 19dcf8527cab45abc4d22d0b7e496c5e37a79e7c21c85e797ae3679450b56baa
Source schedule candidates · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233784|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a789ff250797acc1

Sources EV-ab1250ac5e3cb90cf105ebb5
Evidence SHA-256 7ef46377ef865ae17e990412ad1f439ff13246ead1b0f10d5b738abe66e69878
행 SHA-256 19dcf8527cab45abc4d22d0b7e496c5e37a79e7c21c85e797ae3679450b56baa
Source schedule candidates · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2025-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233784|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a789ff250797acc1

Sources EV-ab1250ac5e3cb90cf105ebb5
Evidence SHA-256 7ef46377ef865ae17e990412ad1f439ff13246ead1b0f10d5b738abe66e69878
행 SHA-256 19dcf8527cab45abc4d22d0b7e496c5e37a79e7c21c85e797ae3679450b56baa
Source schedule candidates · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2024-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233784|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a789ff250797acc1

Sources EV-ab1250ac5e3cb90cf105ebb5
Evidence SHA-256 7ef46377ef865ae17e990412ad1f439ff13246ead1b0f10d5b738abe66e69878
행 SHA-256 19dcf8527cab45abc4d22d0b7e496c5e37a79e7c21c85e797ae3679450b56baa
Source schedule candidates · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233784|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a789ff250797acc1

Sources EV-ab1250ac5e3cb90cf105ebb5
Evidence SHA-256 7ef46377ef865ae17e990412ad1f439ff13246ead1b0f10d5b738abe66e69878
행 SHA-256 19dcf8527cab45abc4d22d0b7e496c5e37a79e7c21c85e797ae3679450b56baa
Source snapshots by date · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_a789ff250797acc1
stable_project_idkproj_3deedea2ccd15144
source_key202609|233784|ESB
basic_ym202609
source_stage_raw공사착수-사업완료전
project_name_list154kV 사직-율량 지중T/L 건설사업
project_name_detail154kV 사직-율량 지중T/L 건설사업
region_summary_raw충청북도 청주시 청원구등 2 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 345㎸ 신청주 및 인근 변전소 고장전류 초과
Project region
  • 충청북도 청주시 청원구,청주시 흥덕구
Project period
  • 2024.01~2026.10
사업 규모
  • 154㎸ XLPE 2,000㎟, 2C × 6.12KM
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 2024.06 ~ 2024.12 설계담당자: [redacted]
건설공사 개요
  • 공사 착공: 2025.03 공사 기간: 2025.03 ~ 2026.10 감독자: [redacted], 실적): 100, 102
[진행경과] □ '23.05 : 제10차 장기송변전설비계획 신규사업 반영 □ '23.04 : 기본설계 완료 □ '24.12 : 실시설계 완료 □ '25.03 : 공사 착공 [향후계획] □ '26.10 : 케이블공사 가
future_plan_redacted□ 향후계획 [진행경과] □ '23.05 : 제10차 장기송변전설비계획 신규사업 반영 □ '23.04 : 기본설계 완료 □ '24.12 : 실시설계 완료 □ '25.03 : 공사 착공 [향후계획] □ '26.10 : 케이블공사 가
attachment_count0
source_detail_sha2567ef46377ef865ae17e990412ad1f439ff13246ead1b0f10d5b738abe66e69878
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233784|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a789ff250797acc1

Sources EV-ab1250ac5e3cb90cf105ebb5
Evidence SHA-256 7ef46377ef865ae17e990412ad1f439ff13246ead1b0f10d5b738abe66e69878
행 SHA-256 19dcf8527cab45abc4d22d0b7e496c5e37a79e7c21c85e797ae3679450b56baa
Source snapshots by date · KOR · kepco_planned

154kV 사직-율량 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_3deedea2ccd15144
stable_project_keyprjtDef:233784:ESB
project_definition233784
first_region_codeESB
manual_source_formatfalse
project_name154kV 사직-율량 지중T/L 건설사업
project_name_list154kV 사직-율량 지중T/L 건설사업
purpose345㎸ 신청주 및 인근 변전소 고장전류 초과
project_region_detail충청북도 청주시 청원구,청주시 흥덕구
project_period_raw2024.01~2026.10
project_scale_raw154㎸ XLPE 2,000㎟, 2C × 6.12KM
responsible_office_raw중부건설본부/직할
equipment_type지중송전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a789ff250797acc1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_3deedea2ccd15144

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_3deedea2ccd15144

Sources EV-8b59eb06e76b6c32acb2caf4
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 8512c32f6c2a3ea23c98f8770d424bdac464499995cb11cb152344889fbd9c5e

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel