POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 18items · current page 1–18 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-0fc7eab085777e43a9a1383c
Detailed source fields Original source field Published value or condition stable_project_id kproj_3bddea9ea2776f64 stable_project_key prjtDef:233374:ESB project_definition 233374 first_region_code ESB manual_source_format false project_name 154kV 북세종-서세종 연결지중T/L 건설사업 project_name_list 154kV 북세종-서세종 지중송전선로 건설사업 purpose 세종지역 전력공급능력 확보 project_region_detail Sejong Special Self-Governing City project_period_raw 2027.01~2028.10 project_scale_raw 154㎸ XLPE 2,000㎟, 2C-2.0KM responsible_office_raw 중부건설본부/직할 equipment_type 지중송전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_3bddea9ea2776f64
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_3bddea9ea2776f64
Sources EV-0fc7eab085777e43a9a1383c Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 2b294929424bbaad19b6a68f0c62170b16e5934713c33971e4fb91c0e954e1f6 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2028-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2024-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2028-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2020-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2028-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2027-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2020-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2016-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2022-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2018-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233374|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_0c7329f8267ef1c4 stable_project_id kproj_3bddea9ea2776f64 source_key 202609|233374|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 북세종-서세종 지중송전선로 건설사업 project_name_detail 154kV 북세종-서세종 연결지중T/L 건설사업 region_summary_raw 세종특별자치시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 중부건설본부 office_raw 직할 section_fields Project region Sejong Special Self-Governing City 사업 규모 154㎸ XLPE 2,000㎟, 2C-2.0KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: -'16.06 : 제7차 장기 송변전설비계획 반영 -'18.01 : 제8차 장기송변전계획 수립 관련 준공 목표 연기(‘22.04→’24.10) -'20.04 : 중장기적정성검토 관련 준공 목표 연기(‘24.10→’25.10) -'20.10 : 제9차 장기송변전계획 수립 관련 준공 목표 연기(‘25.10→’28.10) -'27.05 : 착수시점 도래시 기본설계 등 사업착수 -'28.02 : 착공 -'28.10 : 준공 future_plan_redacted □ 향후계획 -'16.06 : 제7차 장기 송변전설비계획 반영 -'18.01 : 제8차 장기송변전계획 수립 관련 준공 목표 연기(‘22.04→’24.10) -'20.04 : 중장기적정성검토 관련 준공 목표 연기(‘24.10→’25.10) -'20.10 : 제9차 장기송변전계획 수립 관련 준공 목표 연기(‘25.10→’28.10) -'27.05 : 착수시점 도래시 기본설계 등 사업착수 -'28.02 : 착공 -'28.10 : 준공 attachment_count 0 source_detail_sha256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233374|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_0c7329f8267ef1c4
Sources EV-9495d7668b7018d236c3af7f Evidence SHA-256 1b4efb1e852465409fae1c89f0b43b4c33fe050b4dd769156ef8d1582247dc60 행 SHA-256 a1ee62f9dcaadea7db5ab825388ef77869aa11b3ce916b7c6394fca16bf6c9d1 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_3bddea9ea2776f64 stable_project_key prjtDef:233374:ESB project_definition 233374 first_region_code ESB manual_source_format false project_name 154kV 북세종-서세종 연결지중T/L 건설사업 project_name_list 154kV 북세종-서세종 지중송전선로 건설사업 purpose 세종지역 전력공급능력 확보 project_region_detail Sejong Special Self-Governing City project_period_raw 2027.01~2028.10 project_scale_raw 154㎸ XLPE 2,000㎟, 2C-2.0KM responsible_office_raw 중부건설본부/직할 equipment_type 지중송전 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_3bddea9ea2776f64
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_3bddea9ea2776f64
Sources EV-0fc7eab085777e43a9a1383c Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 2b294929424bbaad19b6a68f0c62170b16e5934713c33971e4fb91c0e954e1f6 Observations for this power asset History for this project