Power assets and projects · KOR · kepco_planned

154kV 논산#2분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-2ed3c7911efcb1bc6d52df68
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_31154e93f753b30b
stable_project_keyprjtDef:232732:ESB
project_definition232732
first_region_codeESB
manual_source_formatfalse
project_name154kV 논산#2분기T/L 건설사업
project_name_list154kV 논산#2분기T/L 건설사업
purpose논산지역의 분산형 전원 연계용량 부족예상 및 신재생E 접속용량 선제적 확보
project_region_detail충청남도 논산시
project_period_raw
project_scale_rawACSR 410㎟×S×2C×5KM
responsible_office_raw중부건설본부/직할
equipment_type가공송전
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a1d0b4aedb6b3c40
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_31154e93f753b30b

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_31154e93f753b30b

Sources EV-2ed3c7911efcb1bc6d52df68
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1e05459270aec7313bf70afdc06e19a0ec58fc9c4ac4d28a42ef6a19b49a37d6
Source snapshots by date · KOR · kepco_planned

154kV 논산#2분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_a1d0b4aedb6b3c40
stable_project_idkproj_31154e93f753b30b
source_key202609|232732|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 논산#2분기T/L 건설사업
project_name_detail154kV 논산#2분기T/L 건설사업
region_summary_raw충청남도 논산시등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 논산지역의 분산형 전원 연계용량 부족예상 및 신재생E 접속용량 선제적 확보
Project region
  • 충청남도 논산시
Project period
사업 규모
  • ACSR 410㎟×S×2C×5KM
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha256807da0aa2f990ad57e018fe7c2056b155e2c4b50a590b406f8f6a8936b578cde
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232732|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_a1d0b4aedb6b3c40

Sources EV-cd8f481d761d6bd3ecdb1c8c
Evidence SHA-256 807da0aa2f990ad57e018fe7c2056b155e2c4b50a590b406f8f6a8936b578cde
행 SHA-256 2a7471e98218cfcf29cc8d4765d7d507d24a4ff0487df8cd6d4b73f70178793e
Source snapshots by date · KOR · kepco_planned

154kV 논산#2분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_31154e93f753b30b
stable_project_keyprjtDef:232732:ESB
project_definition232732
first_region_codeESB
manual_source_formatfalse
project_name154kV 논산#2분기T/L 건설사업
project_name_list154kV 논산#2분기T/L 건설사업
purpose논산지역의 분산형 전원 연계용량 부족예상 및 신재생E 접속용량 선제적 확보
project_region_detail충청남도 논산시
project_period_raw
project_scale_rawACSR 410㎟×S×2C×5KM
responsible_office_raw중부건설본부/직할
equipment_type가공송전
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_a1d0b4aedb6b3c40
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_31154e93f753b30b

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_31154e93f753b30b

Sources EV-2ed3c7911efcb1bc6d52df68
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1e05459270aec7313bf70afdc06e19a0ec58fc9c4ac4d28a42ef6a19b49a37d6

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel