POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 16items · current page 1–16 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-4b1b3fb7566f5950f56c1ed7
Detailed source fields Original source field Published value or condition stable_project_id kproj_2b112dde97a3d436 stable_project_key prjtDef:233615:ESB project_definition 233615 first_region_code ESB manual_source_format false project_name 154kV 논공-상인 지중T/L 건설사업 project_name_list 154kV 논공-상인 지중 송전선로 건설사업 purpose 대구지역 154KV 계통보강 project_region_detail 대구광역시 달서구 project_period_raw 2027.06~2029.01 project_scale_raw 154㎸ XLPE 2,000㎟(D), 2C × 2.4㎞ responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 지중송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_2b112dde97a3d436
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_2b112dde97a3d436
Sources EV-4b1b3fb7566f5950f56c1ed7 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 a84491437cca28fc082dd448d4f63930db2dd61d07ce8d2a530dda056dffa654 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2027-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233615|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c18b182be0e8dbc9
Sources EV-457ca1a4f54894a4b3f64412 Evidence SHA-256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 행 SHA-256 638d42b9a3bd06231e20e7252dd2827567848cf9aeaa49d095ee9dc1c30cfa58 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233615|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c18b182be0e8dbc9
Sources EV-457ca1a4f54894a4b3f64412 Evidence SHA-256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 행 SHA-256 638d42b9a3bd06231e20e7252dd2827567848cf9aeaa49d095ee9dc1c30cfa58 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233615|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c18b182be0e8dbc9
Sources EV-457ca1a4f54894a4b3f64412 Evidence SHA-256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 행 SHA-256 638d42b9a3bd06231e20e7252dd2827567848cf9aeaa49d095ee9dc1c30cfa58 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2028-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233615|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c18b182be0e8dbc9
Sources EV-457ca1a4f54894a4b3f64412 Evidence SHA-256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 행 SHA-256 638d42b9a3bd06231e20e7252dd2827567848cf9aeaa49d095ee9dc1c30cfa58 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233615|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c18b182be0e8dbc9
Sources EV-457ca1a4f54894a4b3f64412 Evidence SHA-256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 행 SHA-256 638d42b9a3bd06231e20e7252dd2827567848cf9aeaa49d095ee9dc1c30cfa58 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233615|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c18b182be0e8dbc9
Sources EV-457ca1a4f54894a4b3f64412 Evidence SHA-256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 행 SHA-256 638d42b9a3bd06231e20e7252dd2827567848cf9aeaa49d095ee9dc1c30cfa58 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2027-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233615|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c18b182be0e8dbc9
Sources EV-457ca1a4f54894a4b3f64412 Evidence SHA-256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 행 SHA-256 638d42b9a3bd06231e20e7252dd2827567848cf9aeaa49d095ee9dc1c30cfa58 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2025-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233615|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c18b182be0e8dbc9
Sources EV-457ca1a4f54894a4b3f64412 Evidence SHA-256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 행 SHA-256 638d42b9a3bd06231e20e7252dd2827567848cf9aeaa49d095ee9dc1c30cfa58 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2028-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233615|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c18b182be0e8dbc9
Sources EV-457ca1a4f54894a4b3f64412 Evidence SHA-256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 행 SHA-256 638d42b9a3bd06231e20e7252dd2827567848cf9aeaa49d095ee9dc1c30cfa58 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2027-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233615|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c18b182be0e8dbc9
Sources EV-457ca1a4f54894a4b3f64412 Evidence SHA-256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 행 SHA-256 638d42b9a3bd06231e20e7252dd2827567848cf9aeaa49d095ee9dc1c30cfa58 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233615|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c18b182be0e8dbc9
Sources EV-457ca1a4f54894a4b3f64412 Evidence SHA-256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 행 SHA-256 638d42b9a3bd06231e20e7252dd2827567848cf9aeaa49d095ee9dc1c30cfa58 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233615|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c18b182be0e8dbc9
Sources EV-457ca1a4f54894a4b3f64412 Evidence SHA-256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 행 SHA-256 638d42b9a3bd06231e20e7252dd2827567848cf9aeaa49d095ee9dc1c30cfa58 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2027-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233615|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c18b182be0e8dbc9
Sources EV-457ca1a4f54894a4b3f64412 Evidence SHA-256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 행 SHA-256 638d42b9a3bd06231e20e7252dd2827567848cf9aeaa49d095ee9dc1c30cfa58 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_c18b182be0e8dbc9 stable_project_id kproj_2b112dde97a3d436 source_key 202609|233615|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 논공-상인 지중 송전선로 건설사업 project_name_detail 154kV 논공-상인 지중T/L 건설사업 region_summary_raw 대구광역시 달서구등 1 지역 equipment_type_raw 지중송전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 사업 규모 154㎸ XLPE 2,000㎟(D), 2C × 2.4㎞ 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 사업설계 설계용역: 2027.01 ~ 2027.10 기본설계: 2027.01 ~ 2027.04 실시설계: 2027.05 ~ 2027.10 설계담당자: [redacted] - 25.05 : 제 11차 장기송변전설비계획 준공목표 변경 (->'28.12) - 27.04 : 기본설계 완료 예정 - 27.10 : 실시설계 완료 예정 - 28.03 : 지중송전선로 공사 착공 예정 future_plan_redacted □ 향후계획 - 25.05 : 제 11차 장기송변전설비계획 준공목표 변경 (->'28.12) - 27.04 : 기본설계 완료 예정 - 27.10 : 실시설계 완료 예정 - 28.03 : 지중송전선로 공사 착공 예정 attachment_count 0 source_detail_sha256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233615|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c18b182be0e8dbc9
Sources EV-457ca1a4f54894a4b3f64412 Evidence SHA-256 2ea61961c4c6253ad7da704213ae75c226d67f54ae897b8e66020f99bbc52160 행 SHA-256 638d42b9a3bd06231e20e7252dd2827567848cf9aeaa49d095ee9dc1c30cfa58 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_2b112dde97a3d436 stable_project_key prjtDef:233615:ESB project_definition 233615 first_region_code ESB manual_source_format false project_name 154kV 논공-상인 지중T/L 건설사업 project_name_list 154kV 논공-상인 지중 송전선로 건설사업 purpose 대구지역 154KV 계통보강 project_region_detail 대구광역시 달서구 project_period_raw 2027.06~2029.01 project_scale_raw 154㎸ XLPE 2,000㎟(D), 2C × 2.4㎞ responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 지중송전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_2b112dde97a3d436
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_2b112dde97a3d436
Sources EV-4b1b3fb7566f5950f56c1ed7 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 a84491437cca28fc082dd448d4f63930db2dd61d07ce8d2a530dda056dffa654 Observations for this power asset History for this project