Power assets and projects · KOR · kepco_planned
154kV 금산#2 S/S 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-af55882112fec13ea9135ecb
Sources EV-af55882112fec13ea9135ecb Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 78837c9f791fb0fe864d2b0914b47b63c759a3e7bfad6a212b784eae3d1e2474Source snapshots by date · KOR · kepco_planned
154kV 금산#2 S/S 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_4d8ea4806dbf9aab
stable_project_id
kproj_253c6f77217d918b
source_key
202609|231709|ESB
basic_ym
202609
source_stage_raw
project_name_list
154kV 금산#2 S/S 건설사업
project_name_detail
154kV 금산#2 S/S 건설사업
region_summary_raw
충청남도 금산군등 1 지역
equipment_type_raw
변전
headquarters_raw
중부건설본부
office_raw
직할
section_fields
Project purpose
신규부하 공급
Project region
충청남도 금산군
Project period
사업 규모
60MVA×2BANK (최종 4BANK)
담당 사업소
중부건설본부/직할
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: