Power assets and projects · KOR · kepco_planned

154kV 금산#2 S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-af55882112fec13ea9135ecb
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_253c6f77217d918b
stable_project_keyprjtDef:231709:ESB
project_definition231709
first_region_codeESB
manual_source_formatfalse
project_name154kV 금산#2 S/S 건설사업
project_name_list154kV 금산#2 S/S 건설사업
purpose신규부하 공급
project_region_detail충청남도 금산군
project_period_raw
project_scale_raw60MVA×2BANK (최종 4BANK)
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_4d8ea4806dbf9aab
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_253c6f77217d918b

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_253c6f77217d918b

Sources EV-af55882112fec13ea9135ecb
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 78837c9f791fb0fe864d2b0914b47b63c759a3e7bfad6a212b784eae3d1e2474
Source snapshots by date · KOR · kepco_planned

154kV 금산#2 S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_4d8ea4806dbf9aab
stable_project_idkproj_253c6f77217d918b
source_key202609|231709|ESB
basic_ym202609
source_stage_raw
project_name_list154kV 금산#2 S/S 건설사업
project_name_detail154kV 금산#2 S/S 건설사업
region_summary_raw충청남도 금산군등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 신규부하 공급
Project region
  • 충청남도 금산군
Project period
사업 규모
  • 60MVA×2BANK (최종 4BANK)
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha25601ca5a5dbcaf81d72070a8ab9ceff2c496b1f6603f68bd8c2a9bcf94561ad5d4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231709|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4d8ea4806dbf9aab

Sources EV-e070cd34bb5d2d126007c77e
Evidence SHA-256 01ca5a5dbcaf81d72070a8ab9ceff2c496b1f6603f68bd8c2a9bcf94561ad5d4
행 SHA-256 2d62ad2bb373a49014756ea2216254035b40b6ccc0c029e8f34a8a65928113ee
Source snapshots by date · KOR · kepco_planned

154kV 금산#2 S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_253c6f77217d918b
stable_project_keyprjtDef:231709:ESB
project_definition231709
first_region_codeESB
manual_source_formatfalse
project_name154kV 금산#2 S/S 건설사업
project_name_list154kV 금산#2 S/S 건설사업
purpose신규부하 공급
project_region_detail충청남도 금산군
project_period_raw
project_scale_raw60MVA×2BANK (최종 4BANK)
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_4d8ea4806dbf9aab
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_253c6f77217d918b

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_253c6f77217d918b

Sources EV-af55882112fec13ea9135ecb
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 78837c9f791fb0fe864d2b0914b47b63c759a3e7bfad6a212b784eae3d1e2474

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel