POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 논공S/S 56MW ESS 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-7e26b0cd7251ffff59081ae8
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1c8d468e8253bcba
stable_project_keyprjtDef:231535:ESB
project_definition231535
first_region_codeESB
manual_source_formatfalse
project_name154kV 논공S/S 56MW ESS 건설사업
project_name_list154kV 논공S/S 56MW ESS 건설사업
purpose계통안정화용 ESS 설치
project_region_detail대구광역시 달성군
project_period_raw
project_scale_raw56MW ESS 및 계통연계설비 1식
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type변전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_b1112556007029b1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_1c8d468e8253bcba

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1c8d468e8253bcba

Sources EV-7e26b0cd7251ffff59081ae8
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 80fd278638d010e997c9ec75d167ec8a348a229611bd471b0fe223abcb656224
Source snapshots by date · KOR · kepco_planned

154kV 논공S/S 56MW ESS 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_b1112556007029b1
stable_project_idkproj_1c8d468e8253bcba
source_key202609|231535|ESB
basic_ym202609
source_stage_raw
project_name_list154kV 논공S/S 56MW ESS 건설사업
project_name_detail154kV 논공S/S 56MW ESS 건설사업
region_summary_raw대구광역시 달성군등 1 지역
equipment_type_raw변전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 계통안정화용 ESS 설치
Project region
  • 대구광역시 달성군
Project period
사업 규모
  • 56MW ESS 및 계통연계설비 1식
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha2569173dec614f6664a03b6368ed2ca2b768f9f30c6a1af375e9969ca35e3bd82e1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231535|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b1112556007029b1

Sources EV-c38e43ffcbc12c56ec706812
Evidence SHA-256 9173dec614f6664a03b6368ed2ca2b768f9f30c6a1af375e9969ca35e3bd82e1
행 SHA-256 dcc75b84745e9ca1fd3ecff3060d6a40d0a94433ddeac4195ac91d5a0616df42
Source snapshots by date · KOR · kepco_planned

154kV 논공S/S 56MW ESS 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1c8d468e8253bcba
stable_project_keyprjtDef:231535:ESB
project_definition231535
first_region_codeESB
manual_source_formatfalse
project_name154kV 논공S/S 56MW ESS 건설사업
project_name_list154kV 논공S/S 56MW ESS 건설사업
purpose계통안정화용 ESS 설치
project_region_detail대구광역시 달성군
project_period_raw
project_scale_raw56MW ESS 및 계통연계설비 1식
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type변전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_b1112556007029b1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_1c8d468e8253bcba

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1c8d468e8253bcba

Sources EV-7e26b0cd7251ffff59081ae8
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 80fd278638d010e997c9ec75d167ec8a348a229611bd471b0fe223abcb656224

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel