Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 복정-수서 지중T/L 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-7c62b410ec77138b6d11eef4
Sources EV-1539c7f6a7067818983ce215 Evidence SHA-256 a3a6cff09c4b59e1b31a7dbe6498ac34a6377eca903539e2cef63d521801a9a9 행 SHA-256 145bed77437b6829cfd251ce2ac73d07f43227678003f1cdb8b2165fa7af0523Source snapshots by date · KOR · kepco_planned
154kV 복정-수서 지중T/L 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_9f9f9555ba08f168
stable_project_id
kproj_127262dde58663b8
source_key
202609|233682|ESB
basic_ym
202609
source_stage_raw
계획확정-사업승인전
project_name_list
154kV 복정-수서 지중T/L 건설사업
project_name_detail
154kV 복정-수서 지중T/L 건설사업
region_summary_raw
경기도 성남시 수정구등 1 지역
equipment_type_raw
지중송전
headquarters_raw
경인건설본부
office_raw
남서울인천건설지사
section_fields
Project purpose
복정S/S 단일계통 해소
Project region
경기도 성남시 수정구
Project period
2025.04~2027.06
사업 규모
154KV XLPE 2000, 2C-0.4KM
담당 사업소
경인건설본부/남서울인천건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-1539c7f6a7067818983ce215 Evidence SHA-256 a3a6cff09c4b59e1b31a7dbe6498ac34a6377eca903539e2cef63d521801a9a9 행 SHA-256 145bed77437b6829cfd251ce2ac73d07f43227678003f1cdb8b2165fa7af0523Source snapshots by date · KOR · kepco_planned