This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 6items · current page 1–6 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 서오송분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-de7a96d3d1fb32609ac45e5d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_10e697968632ac48
stable_project_keyprjtDef:234773:ESB
project_definition234773
first_region_codeESB
manual_source_formatfalse
project_name154kV 서오송분기 전력구 건설사업
project_name_list154kV 서오송분기 전력구 건설사업
purpose지역 개발에 따른 공급능력 확보 및 인근변전소 부하 부담
project_region_detail충청북도 청주시 흥덕구
project_period_raw2026.02~2033.04
project_scale_raw345KV XLPE 2500(D)X2C, L=0.2KM
responsible_office_raw중부건설본부/직할
equipment_type전력구
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_2cdf9a3909157613
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_10e697968632ac48

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_10e697968632ac48

Sources EV-de7a96d3d1fb32609ac45e5d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 48e3ad14bc0a0cafe28cf9f01f7b275f006d76f9cd3f81d21717add833c427aa
Source schedule candidates · KOR · kepco_planned

154kV 서오송분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2033-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234773|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2cdf9a3909157613

Sources EV-c0c097eaa7cebccce23612ba
Evidence SHA-256 7f1b2bbfe62d0f968267efa2c0fff61aa808bf0d98682ef240bdb2ab42f0322a
행 SHA-256 61b90e6534d09a0c9708b0b4d6127ef0e65e30e1c9ac0473142b3527516eeb6d
Source schedule candidates · KOR · kepco_planned

154kV 서오송분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2026-02
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234773|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2cdf9a3909157613

Sources EV-c0c097eaa7cebccce23612ba
Evidence SHA-256 7f1b2bbfe62d0f968267efa2c0fff61aa808bf0d98682ef240bdb2ab42f0322a
행 SHA-256 61b90e6534d09a0c9708b0b4d6127ef0e65e30e1c9ac0473142b3527516eeb6d
Source schedule candidates · KOR · kepco_planned

154kV 서오송분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|234773|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2cdf9a3909157613

Sources EV-c0c097eaa7cebccce23612ba
Evidence SHA-256 7f1b2bbfe62d0f968267efa2c0fff61aa808bf0d98682ef240bdb2ab42f0322a
행 SHA-256 61b90e6534d09a0c9708b0b4d6127ef0e65e30e1c9ac0473142b3527516eeb6d
Source snapshots by date · KOR · kepco_planned

154kV 서오송분기 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_2cdf9a3909157613
stable_project_idkproj_10e697968632ac48
source_key202609|234773|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 서오송분기 전력구 건설사업
project_name_detail154kV 서오송분기 전력구 건설사업
region_summary_raw충청북도 청주시 흥덕구등 1 지역
equipment_type_raw전력구
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 지역 개발에 따른 공급능력 확보 및 인근변전소 부하 부담
Project region
  • 충청북도 청주시 흥덕구
Project period
  • 2026.02~2033.04
사업 규모
  • 345KV XLPE 2500(D)X2C, L=0.2KM
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
-25.05 제 11차 장기 송변전설비계획 수립
future_plan_redacted□ 향후계획 -25.05 제 11차 장기 송변전설비계획 수립
attachment_count0
source_detail_sha2567f1b2bbfe62d0f968267efa2c0fff61aa808bf0d98682ef240bdb2ab42f0322a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234773|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_2cdf9a3909157613

Sources EV-c0c097eaa7cebccce23612ba
Evidence SHA-256 7f1b2bbfe62d0f968267efa2c0fff61aa808bf0d98682ef240bdb2ab42f0322a
행 SHA-256 61b90e6534d09a0c9708b0b4d6127ef0e65e30e1c9ac0473142b3527516eeb6d
Source snapshots by date · KOR · kepco_planned

154kV 서오송분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_10e697968632ac48
stable_project_keyprjtDef:234773:ESB
project_definition234773
first_region_codeESB
manual_source_formatfalse
project_name154kV 서오송분기 전력구 건설사업
project_name_list154kV 서오송분기 전력구 건설사업
purpose지역 개발에 따른 공급능력 확보 및 인근변전소 부하 부담
project_region_detail충청북도 청주시 흥덕구
project_period_raw2026.02~2033.04
project_scale_raw345KV XLPE 2500(D)X2C, L=0.2KM
responsible_office_raw중부건설본부/직할
equipment_type전력구
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_2cdf9a3909157613
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_10e697968632ac48

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_10e697968632ac48

Sources EV-de7a96d3d1fb32609ac45e5d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 48e3ad14bc0a0cafe28cf9f01f7b275f006d76f9cd3f81d21717add833c427aa

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel