POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 10items · current page 1–10 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-eaeaf0c2db50670b121b9906
Detailed source fields Original source field Published value or condition stable_project_id kproj_0f79b7fcf21e1b95 stable_project_key prjtDef:232514:ESB project_definition 232514 first_region_code ESB manual_source_format false project_name 154kV 남해-금남T/L 건설사업 project_name_list 154kV 남해-금남T/L 건설사업 purpose 단일계통 보강을 통한 안정적 전력공급 project_region_detail 경상남도 남해군,하동군 project_period_raw 2018.08~2028.10 project_scale_raw ACSR 330㎟ × S × 2C × 25KM responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_0f79b7fcf21e1b95
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_0f79b7fcf21e1b95
Sources EV-eaeaf0c2db50670b121b9906 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 7111a56487b793644ef64661f3369ee9f04601672cf1581e7672ec776c208f9b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232514|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b738602ab4c91b2
Sources EV-423ff375ba44a41ac6c815d8 Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95 행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232514|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b738602ab4c91b2
Sources EV-423ff375ba44a41ac6c815d8 Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95 행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-08 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232514|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b738602ab4c91b2
Sources EV-423ff375ba44a41ac6c815d8 Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95 행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2019-11 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232514|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b738602ab4c91b2
Sources EV-423ff375ba44a41ac6c815d8 Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95 행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2019-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232514|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b738602ab4c91b2
Sources EV-423ff375ba44a41ac6c815d8 Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95 행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232514|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b738602ab4c91b2
Sources EV-423ff375ba44a41ac6c815d8 Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95 행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2018-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232514|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b738602ab4c91b2
Sources EV-423ff375ba44a41ac6c815d8 Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95 행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_4b738602ab4c91b2 stable_project_id kproj_0f79b7fcf21e1b95 source_key 202609|232514|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 남해-금남T/L 건설사업 project_name_detail 154kV 남해-금남T/L 건설사업 region_summary_raw 경상남도 남해군등 2 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 직할 section_fields 사업 규모 ACSR 330㎟ × S × 2C × 25KM 입지선정 전력입지영향평가 용역 착수: 2018.08 입지선정위원회 구성시기: 2019.11 참여 위원 수 : 51 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 line [진행경과] ㅇ'18. 8 : 주민주도 송전선로 입지선정 용역 착수 ㅇ'19. 5 ~ '20. 4 : 남해군 주민주도 입지선정위원회 구성 및 운영(1~4차) ㅇ'20. 8 ~ '23. 6 : 하동군 주민주도 입지선정위원회 구성 및 운영(1~7차) ㅇ'23. 2 : 계통계획 변경(남해-갈사T/L → 남해-금남T/L) ㅇ'24.10 : 하동군 주민주도 입지선정위원회 구성 및 운영(8차) - 최적경과지 확정 ㅇ'26. 3 : 하동군, 남해군 최적경과지 선정 결과보고 ㅇ'26. 5 : 대송산업단지 내 철탑부지 확보 관련 지자체(하동군) 협의 ㅇ'26. 6 : 최적경과지 지장물 조회(지자체 등) [향후계획] ㅇ'26. 9 : 최적경과지 측량 시 line [진행경과] ㅇ'18. 8 : 주민주도 송전선로 입지선정 용역 착수 ㅇ'19. 5 ~ '20. 4 : 남해군 주민주도 입지선정위원회 구성 및 운영(1~4차) ㅇ'20. 8 ~ '23. 6 : 하동군 주민주도 입지선정위원회 구성 및 운영(1~7차) ㅇ'23. 2 : 계통계획 변경(남해-갈사T/L → 남해-금남T/L) ㅇ'24.10 : 하동군 주민주도 입지선정위원회 구성 및 운영(8차) - 최적경과지 확정 ㅇ'26. 3 : 하동군, 남해군 최적경과지 선정 결과보고 ㅇ'26. 5 : 대송산업단지 내 철탑부지 확보 관련 지자체(하동군) 협의 ㅇ'26. 6 : 최적경과지 지장물 조회(지자체 등) [향후계획] ㅇ'26. 9 : 최적경과지 측량 시 future_plan_redacted line □ 향후계획 [진행경과] ㅇ'18. 8 : 주민주도 송전선로 입지선정 용역 착수 ㅇ'19. 5 ~ '20. 4 : 남해군 주민주도 입지선정위원회 구성 및 운영(1~4차) ㅇ'20. 8 ~ '23. 6 : 하동군 주민주도 입지선정위원회 구성 및 운영(1~7차) ㅇ'23. 2 : 계통계획 변경(남해-갈사T/L → 남해-금남T/L) ㅇ'24.10 : 하동군 주민주도 입지선정위원회 구성 및 운영(8차) - 최적경과지 확정 ㅇ'26. 3 : 하동군, 남해군 최적경과지 선정 결과보고 ㅇ'26. 5 : 대송산업단지 내 철탑부지 확보 관련 지자체(하동군) 협의 ㅇ'26. 6 : 최적경과지 지장물 조회(지자체 등) [향후계획] ㅇ'26. 9 : 최적경과지 측량 시 attachment_count 0 source_detail_sha256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232514|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_4b738602ab4c91b2
Sources EV-423ff375ba44a41ac6c815d8 Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95 행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_0f79b7fcf21e1b95 stable_project_key prjtDef:232514:ESB project_definition 232514 first_region_code ESB manual_source_format false project_name 154kV 남해-금남T/L 건설사업 project_name_list 154kV 남해-금남T/L 건설사업 purpose 단일계통 보강을 통한 안정적 전력공급 project_region_detail 경상남도 남해군,하동군 project_period_raw 2018.08~2028.10 project_scale_raw ACSR 330㎟ × S × 2C × 25KM responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_0f79b7fcf21e1b95
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_0f79b7fcf21e1b95
Sources EV-eaeaf0c2db50670b121b9906 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 7111a56487b793644ef64661f3369ee9f04601672cf1581e7672ec776c208f9b Observations for this power asset History for this project