POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 10items · current page 1–10 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 남해-금남T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-eaeaf0c2db50670b121b9906
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0f79b7fcf21e1b95
stable_project_keyprjtDef:232514:ESB
project_definition232514
first_region_codeESB
manual_source_formatfalse
project_name154kV 남해-금남T/L 건설사업
project_name_list154kV 남해-금남T/L 건설사업
purpose단일계통 보강을 통한 안정적 전력공급
project_region_detail경상남도 남해군,하동군
project_period_raw2018.08~2028.10
project_scale_rawACSR 330㎟ × S × 2C × 25KM
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_4b738602ab4c91b2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_0f79b7fcf21e1b95

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0f79b7fcf21e1b95

Sources EV-eaeaf0c2db50670b121b9906
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7111a56487b793644ef64661f3369ee9f04601672cf1581e7672ec776c208f9b
Source schedule candidates · KOR · kepco_planned

154kV 남해-금남T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232514|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4b738602ab4c91b2

Sources EV-423ff375ba44a41ac6c815d8
Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95
행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f
Source schedule candidates · KOR · kepco_planned

154kV 남해-금남T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232514|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4b738602ab4c91b2

Sources EV-423ff375ba44a41ac6c815d8
Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95
행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f
Source schedule candidates · KOR · kepco_planned

154kV 남해-금남T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-08
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232514|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4b738602ab4c91b2

Sources EV-423ff375ba44a41ac6c815d8
Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95
행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f
Source schedule candidates · KOR · kepco_planned

154kV 남해-금남T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2019-11
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232514|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4b738602ab4c91b2

Sources EV-423ff375ba44a41ac6c815d8
Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95
행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f
Source schedule candidates · KOR · kepco_planned

154kV 남해-금남T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232514|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4b738602ab4c91b2

Sources EV-423ff375ba44a41ac6c815d8
Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95
행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f
Source schedule candidates · KOR · kepco_planned

154kV 남해-금남T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232514|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4b738602ab4c91b2

Sources EV-423ff375ba44a41ac6c815d8
Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95
행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f
Source schedule candidates · KOR · kepco_planned

154kV 남해-금남T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-08
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232514|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4b738602ab4c91b2

Sources EV-423ff375ba44a41ac6c815d8
Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95
행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f
Source snapshots by date · KOR · kepco_planned

154kV 남해-금남T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_4b738602ab4c91b2
stable_project_idkproj_0f79b7fcf21e1b95
source_key202609|232514|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 남해-금남T/L 건설사업
project_name_detail154kV 남해-금남T/L 건설사업
region_summary_raw경상남도 남해군등 2 지역
equipment_type_raw가공송전
headquarters_raw남부건설본부
office_raw직할
section_fields
Project purpose
  • 단일계통 보강을 통한 안정적 전력공급
Project region
  • 경상남도 남해군,하동군
Project period
  • 2018.08~2028.10
사업 규모
  • ACSR 330㎟ × S × 2C × 25KM
담당 사업소
  • 남부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2018.08 입지선정위원회 구성시기: 2019.11 참여 위원 수 : 51 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • line [진행경과] ㅇ'18. 8 : 주민주도 송전선로 입지선정 용역 착수 ㅇ'19. 5 ~ '20. 4 : 남해군 주민주도 입지선정위원회 구성 및 운영(1~4차) ㅇ'20. 8 ~ '23. 6 : 하동군 주민주도 입지선정위원회 구성 및 운영(1~7차) ㅇ'23. 2 : 계통계획 변경(남해-갈사T/L → 남해-금남T/L) ㅇ'24.10 : 하동군 주민주도 입지선정위원회 구성 및 운영(8차) - 최적경과지 확정 ㅇ'26. 3 : 하동군, 남해군 최적경과지 선정 결과보고 ㅇ'26. 5 : 대송산업단지 내 철탑부지 확보 관련 지자체(하동군) 협의 ㅇ'26. 6 : 최적경과지 지장물 조회(지자체 등) [향후계획] ㅇ'26. 9 : 최적경과지 측량 시
line [진행경과] ㅇ'18. 8 : 주민주도 송전선로 입지선정 용역 착수 ㅇ'19. 5 ~ '20. 4 : 남해군 주민주도 입지선정위원회 구성 및 운영(1~4차) ㅇ'20. 8 ~ '23. 6 : 하동군 주민주도 입지선정위원회 구성 및 운영(1~7차) ㅇ'23. 2 : 계통계획 변경(남해-갈사T/L → 남해-금남T/L) ㅇ'24.10 : 하동군 주민주도 입지선정위원회 구성 및 운영(8차) - 최적경과지 확정 ㅇ'26. 3 : 하동군, 남해군 최적경과지 선정 결과보고 ㅇ'26. 5 : 대송산업단지 내 철탑부지 확보 관련 지자체(하동군) 협의 ㅇ'26. 6 : 최적경과지 지장물 조회(지자체 등) [향후계획] ㅇ'26. 9 : 최적경과지 측량 시
future_plan_redactedline □ 향후계획 [진행경과] ㅇ'18. 8 : 주민주도 송전선로 입지선정 용역 착수 ㅇ'19. 5 ~ '20. 4 : 남해군 주민주도 입지선정위원회 구성 및 운영(1~4차) ㅇ'20. 8 ~ '23. 6 : 하동군 주민주도 입지선정위원회 구성 및 운영(1~7차) ㅇ'23. 2 : 계통계획 변경(남해-갈사T/L → 남해-금남T/L) ㅇ'24.10 : 하동군 주민주도 입지선정위원회 구성 및 운영(8차) - 최적경과지 확정 ㅇ'26. 3 : 하동군, 남해군 최적경과지 선정 결과보고 ㅇ'26. 5 : 대송산업단지 내 철탑부지 확보 관련 지자체(하동군) 협의 ㅇ'26. 6 : 최적경과지 지장물 조회(지자체 등) [향후계획] ㅇ'26. 9 : 최적경과지 측량 시
attachment_count0
source_detail_sha256a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232514|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_4b738602ab4c91b2

Sources EV-423ff375ba44a41ac6c815d8
Evidence SHA-256 a561984ea374e6a6f10d98178e63fc4b04e6f45dd9aa7a625720f0eeb179ce95
행 SHA-256 e75681fdb66883d101be2539d9f111ae27f53cb0eec91193145881bdb8727a2f
Source snapshots by date · KOR · kepco_planned

154kV 남해-금남T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0f79b7fcf21e1b95
stable_project_keyprjtDef:232514:ESB
project_definition232514
first_region_codeESB
manual_source_formatfalse
project_name154kV 남해-금남T/L 건설사업
project_name_list154kV 남해-금남T/L 건설사업
purpose단일계통 보강을 통한 안정적 전력공급
project_region_detail경상남도 남해군,하동군
project_period_raw2018.08~2028.10
project_scale_rawACSR 330㎟ × S × 2C × 25KM
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_4b738602ab4c91b2
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_0f79b7fcf21e1b95

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0f79b7fcf21e1b95

Sources EV-eaeaf0c2db50670b121b9906
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 7111a56487b793644ef64661f3369ee9f04601672cf1581e7672ec776c208f9b

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel