Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 서오창S/S 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-8f6e55e968d16f444e174a52
Sources EV-d6617d292b59803f7e98e958 Evidence SHA-256 663b26ef01f48db21a4f2fc43beb7aeaa11a3a698f4e7a7be688d513f469e1df 행 SHA-256 6a1e0706587d47b3e9901794caae8d6fc24bc0e875b614bb16c7066541f70211Source snapshots by date · KOR · kepco_planned
154kV 서오창S/S 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_4d5cf66450f61a32
stable_project_id
kproj_0f29f0aea4b2c901
source_key
202609|231547|ESB
basic_ym
202609
source_stage_raw
공사착수-사업완료전
project_name_list
154kV 서오창S/S 건설사업
project_name_detail
154kV 서오창S/S 건설사업
region_summary_raw
충청북도 청주시 청원구등 1 지역
equipment_type_raw
변전
headquarters_raw
중부건설본부
office_raw
충북강원건설지사
section_fields
Project purpose
인근변전소(오창, 국사) 부하분담
Project region
충청북도 청주시 청원구
Project period
2021.09~2026.06
사업 규모
154KV M.TR 2BANK(최종4BANK)
담당 사업소
중부건설본부/충북강원건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
Sources EV-d6617d292b59803f7e98e958 Evidence SHA-256 663b26ef01f48db21a4f2fc43beb7aeaa11a3a698f4e7a7be688d513f469e1df 행 SHA-256 6a1e0706587d47b3e9901794caae8d6fc24bc0e875b614bb16c7066541f70211Source snapshots by date · KOR · kepco_planned