POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 41items · current page 1–41 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-ce0f5bd85f47b17ea48f2358
Detailed source fields Original source field Published value or condition stable_project_id kproj_04c6626f715583be stable_project_key prjtDef:232504:ESB project_definition 232504 first_region_code ESB manual_source_format false project_name 154kV 서예산분기 T/L 건설사업 project_name_list 154kV 서예산분기 송전선로 건설사업 purpose 예산, 홍성지역의 전력공급을 위함 project_region_detail 충청남도 예산군 project_period_raw 2018.11~2028.10 project_scale_raw ACSR 410㎟×2B×2C×0.854KM, 4회선 C/H 1기 responsible_office_raw 중부건설본부/직할 equipment_type 가공송전 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_04c6626f715583be
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_04c6626f715583be
Sources EV-ce0f5bd85f47b17ea48f2358 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d5836b0c07ba08b51a3c9f2dd9c2a27b2840ba647221413b122b17f79a93bb7d Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2024-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2018-11 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2025-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2025-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2020-01 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2025-08 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2021-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2024-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2022-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2018-11 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232504|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_bc30bb104b826854 stable_project_id kproj_04c6626f715583be source_key 202609|232504|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 서예산분기 송전선로 건설사업 project_name_detail 154kV 서예산분기 T/L 건설사업 region_summary_raw 충청남도 예산군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 직할 section_fields 사업 규모 ACSR 410㎟×2B×2C×0.854KM, 4회선 C/H 1기 입지선정 전력입지영향평가 용역 착수: 2018.11 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2022.07 환경/재해 영향평가 환경영향평가: 2024.07 ~ 2025.05 재해영향평가: 2024.07 ~ 2025.05 주민의견 수렴 지자체 공고 열람: 2024.02 ~ 2024.03 설명회·공청회: 2024.02 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 □ ’20.01 덕산면 이장협의회 대상 사업설명 시행 □ ’21.04 3자 간담회 개최(반대대책위 한전 예산군) □ ’21.05 주민공청회 개최(삽교읍 신리) □ ’21.06 주민공청회 개최(덕산면 신평1, 2리) □ ’23.03 사업시행계획 공고·열람 협조 요청(→예산군청) □ ’24.07 : 전원개발사업 실시계획 승인 신청 □ ’25.08 : 전원개발사업 실시계획 승인 사업설계 설계용역: 기본설계: 2025.09 ~ 2025.11 실시설계: 2025.11 ~ 설계담당자: [redacted] □ 진행경과 ○ ‘15. 10 : 제7차 장기 송변전설비계획 신규 설비계획반영(‘23. 10) ○ ‘18. 01 : 제8차 장기 송변전설비계획 준공목표 조정(‘24.10) ○ ‘19. 09 : 내포 E/C 입지선정 1차 실무위원회 구성, 운영(예산지사) - 후보지: 1안 예산군 덕산면 신평리 일원 2안 내포 열병합발전소 ○ ‘19. 12 : 내포 E/C 입지선정 2차 실무위원회 구성, 운영(예산지사) - 최종 후보지 선정: 1안 후보지(충남 예산군 덕산면 신평리 일원) ○ ’22.08, '22.11 : 신리, 송산리마을 특별지원사업비 협의서 체결 ○ ’22.12, ‘23.01, ’23.03 신평2리마을 반대집회 개최(중부건설본부사옥) ○ ’23.10~ : 신평리 2리(4반마을) 특별지원사업비 협의서 체결 완료 ○ ’23.12~ : 신평리 2리(본마을) 특별지원사업비 협의서 체결 완료 ○ ’24.02 : 신리마을 특별지원사업비 추가지원 협의서 체결 ○ ’24.07 : 전원개발사업 실시계획 승인 신청 ○ ’24.07 : 소규모 환경영향평가서 본안 제출 ○ ’25.02 : 소규모 재해영향평가서 심의결과 통보(←산업통상자원부) ○ ’25.06 : 기본설계(안) 송전, 토목분야 작성 및 검토 ○ ’25.08 : 전원개발사업 실시계획 승인 ○ ’25.09 : 용지 권원확보의뢰 ○ ’25.11 : 기본설계 완료 및 실시설계 의뢰 □ 향후계획 ○ ’26.12 : 공사 계약의뢰 및 감리용역 설계 future_plan_redacted □ 향후계획 □ 진행경과 ○ ‘15. 10 : 제7차 장기 송변전설비계획 신규 설비계획반영(‘23. 10) ○ ‘18. 01 : 제8차 장기 송변전설비계획 준공목표 조정(‘24.10) ○ ‘19. 09 : 내포 E/C 입지선정 1차 실무위원회 구성, 운영(예산지사) - 후보지: 1안 예산군 덕산면 신평리 일원 2안 내포 열병합발전소 ○ ‘19. 12 : 내포 E/C 입지선정 2차 실무위원회 구성, 운영(예산지사) - 최종 후보지 선정: 1안 후보지(충남 예산군 덕산면 신평리 일원) ○ ’22.08, '22.11 : 신리, 송산리마을 특별지원사업비 협의서 체결 ○ ’22.12, ‘23.01, ’23.03 신평2리마을 반대집회 개최(중부건설본부사옥) ○ ’23.10~ : 신평리 2리(4반마을) 특별지원사업비 협의서 체결 완료 ○ ’23.12~ : 신평리 2리(본마을) 특별지원사업비 협의서 체결 완료 ○ ’24.02 : 신리마을 특별지원사업비 추가지원 협의서 체결 ○ ’24.07 : 전원개발사업 실시계획 승인 신청 ○ ’24.07 : 소규모 환경영향평가서 본안 제출 ○ ’25.02 : 소규모 재해영향평가서 심의결과 통보(←산업통상자원부) ○ ’25.06 : 기본설계(안) 송전, 토목분야 작성 및 검토 ○ ’25.08 : 전원개발사업 실시계획 승인 ○ ’25.09 : 용지 권원확보의뢰 ○ ’25.11 : 기본설계 완료 및 실시설계 의뢰 □ 향후계획 ○ ’26.12 : 공사 계약의뢰 및 감리용역 설계 attachment_count 0 source_detail_sha256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232504|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_bc30bb104b826854
Sources EV-16d33eb5e2a5625c521b9435 Evidence SHA-256 dfd770d462afea5690bbc86c6f69ff0131b5cc3035c0138c0084189bddf517e8 행 SHA-256 3c43d2cc8972524cf922c946f2d6293912056adad6297db810bfa48cdfaa206f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_04c6626f715583be stable_project_key prjtDef:232504:ESB project_definition 232504 first_region_code ESB manual_source_format false project_name 154kV 서예산분기 T/L 건설사업 project_name_list 154kV 서예산분기 송전선로 건설사업 purpose 예산, 홍성지역의 전력공급을 위함 project_region_detail 충청남도 예산군 project_period_raw 2018.11~2028.10 project_scale_raw ACSR 410㎟×2B×2C×0.854KM, 4회선 C/H 1기 responsible_office_raw 중부건설본부/직할 equipment_type 가공송전 headquarters 중부건설본부 office 직할 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_04c6626f715583be
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_04c6626f715583be
Sources EV-ce0f5bd85f47b17ea48f2358 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 d5836b0c07ba08b51a3c9f2dd9c2a27b2840ba647221413b122b17f79a93bb7d Observations for this power asset History for this project