Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 10items · current page 1–10 · Source records, not unique facilities.
Evidence relationships · KOR · primary:a3fccdd0b91a082fc55ade26
당진 송산 IDC
Not obtained · Identity match confirmed
Relationship status: Identity match confirmed · same inherited record Related record nfd:dangjin-songsan · Relationship evidence
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
from_kind
power_object
from_id
r1:nfd:dangjin-songsan
to_kind
r1_entity
to_id
nfd:dangjin-songsan
geometry_relation
false
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1itemswww.nfd.kr ↗
Data Source Not stated · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan
Sources EV-cb453c353a4567c3f34a6c63 Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_filePower assets and projects · KOR · primary:a3fccdd0b91a082fc55ade26
당진 송산 IDC
data center project · Published statement
Metric or condition
Source value
Basis, scope and stage
IT capacity
140 MW
IT · Project · as published As-of date Not stated Sources EV-5cdec73f2283619e6101fda3
PUE
1.33 ratio
Design · Project · Design As-of date Not stated Sources EV-f58be36e5d8bee2553893793
site_area
43188 m2
site area · Project · Undisclosed As-of date Not stated Sources EV-0f68b78b6761de8d15481fbc
Gross floor area
106716 m2
gross floor area · Project · Undisclosed As-of date Not stated Sources EV-7b82b3a75ca880f62e0597f7
unspecified · building C · permitting As-of date 2026-09-14 Sources EV-520e3a0c9cdd204b88bba6fe
Detailed source fields
Original source field
Published value or condition
origin_family
project_record_metrics
inherited_batch
AIDC-GLOBAL-20261005-DATA-R1-FIX1
Verification status
publisher_stated
Change type
reused
Contracting parties
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1itemswww.nfd.kr ↗
Design · Project · Design As-of date Not stated Sources EV-f58be36e5d8bee2553893793
Detailed source fields
Original source field
Published value or condition
origin_family
project_record_metrics
inherited_batch
AIDC-GLOBAL-20261005-DATA-R1-FIX1
Verification status
publisher_stated
Change type
reused
Contracting parties
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1itemswww.nfd.kr ↗
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1itemswww.nfd.kr ↗
Design · rack · Design As-of date 2026-09-14 Sources EV-a4ea847e51023b422a5989bb
Detailed source fields
Original source field
Published value or condition
origin_family
project_record_metrics
inherited_batch
AIDC-GLOBAL-20261005-DATA-R1-FIX1
Verification status
publisher_stated
Change type
reused
Contracting parties
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1itemswww.nfd.kr ↗
gross floor area · Project · Undisclosed As-of date Not stated Sources EV-7b82b3a75ca880f62e0597f7
Detailed source fields
Original source field
Published value or condition
origin_family
project_record_metrics
inherited_batch
AIDC-GLOBAL-20261005-DATA-R1-FIX1
Verification status
publisher_stated
Change type
reused
Contracting parties
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1itemswww.nfd.kr ↗
unspecified · buildings A and B · Plan As-of date 2026-09-14 Sources EV-d3fa3a076a34730276f76c05
Detailed source fields
Original source field
Published value or condition
origin_family
project_record_metrics
inherited_batch
AIDC-GLOBAL-20261005-DATA-R1-FIX1
Verification status
publisher_stated
Change type
reused
Contracting parties
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1itemswww.nfd.kr ↗
site area · Project · Undisclosed As-of date Not stated Sources EV-0f68b78b6761de8d15481fbc
Detailed source fields
Original source field
Published value or condition
origin_family
project_record_metrics
inherited_batch
AIDC-GLOBAL-20261005-DATA-R1-FIX1
Verification status
publisher_stated
Change type
reused
Contracting parties
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1itemswww.nfd.kr ↗
IT · Project · as published As-of date Not stated Sources EV-5cdec73f2283619e6101fda3
Detailed source fields
Original source field
Published value or condition
origin_family
project_record_metrics
inherited_batch
AIDC-GLOBAL-20261005-DATA-R1-FIX1
Verification status
publisher_stated
Change type
reused
Contracting parties
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1itemswww.nfd.kr ↗