Data Center Database/NFD Korea·EFD/Dangjin, South Chungcheong Province
● Plan

NFD Dangjin Songsan AI Data Center Campus

Songsan 2 General Industrial Complex, Dangjin City, South Chungcheong Province (Public Agreement: 35,239 m²; Developer’s Current Project: 43,188 m²; specific lot details not disclosed)

Center OverviewPhysical Sites · PowerSame operator
Operational StatusPlan

사업자 뉴스 A동 2026년 11월 착공·캠퍼스 2028년 3분기 순차 준공 목표 / 현재 프로젝트 페이지 2026년 3분기 착공·2028년 4분기 준공

Public PowerOfficial documents: 100 MW Power System Impact Assessment submitted; operator claims 300 MW supply contract with KEPCO; currently disclosed IT load: 140 MW; original contract text not verified.

Distinguish between power supply, UPS, and IT load

Facility SizePublic Agreement: Building C, 100 MW; Operator Campus Announcement: Buildings A, B, and C, total 300 MW; Current project page: IT load 140 MW

AI Training, Inference, and High-Density Liquid-Cooled Data Center Campus

Confirm move-in conditions at this center.

Discuss facility, power and network requirements → · Compare published Korean rental products

Additional power and facility specifications

Values and scope are preserved from public sources. Different phases and dates for one facility remain separate observations.

Power assets and projects · KOR · primary:a3fccdd0b91a082fc55ade26

당진 송산 IDC

data center project · Published statement

Metric or conditionSource valueBasis, scope and stage
IT capacity140 MWIT · Project · as published
As-of date Not stated
Sources EV-5cdec73f2283619e6101fda3
PUE1.33 ratioDesign · Project · Design
As-of date Not stated
Sources EV-f58be36e5d8bee2553893793
site_area43188 m2site area · Project · Undisclosed
As-of date Not stated
Sources EV-0f68b78b6761de8d15481fbc
Gross floor area106716 m2gross floor area · Project · Undisclosed
As-of date Not stated
Sources EV-7b82b3a75ca880f62e0597f7
Contracted electricity supply capacity300 MWcontract · Campus · developer claimed secured
As-of date 2026-09-14
Sources EV-a6511102f4f07ab4e76a18fa
planned_capacity_unspecified200 MWunspecified · buildings A and B · Plan
As-of date 2026-09-14
Sources EV-d3fa3a076a34730276f76c05
planned_capacity_unspecified100 MWunspecified · building C · permitting
As-of date 2026-09-14
Sources EV-520e3a0c9cdd204b88bba6fe
rack_power_density160 kW/rackDesign · rack · Design
As-of date 2026-09-14
Sources EV-a4ea847e51023b422a5989bb
Detailed source fields
Original source fieldPublished value or condition
source_record_idr1:nfd:dangjin-songsan

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 9items
www.nfd.kr ↗

Data Source Not stated · Retrieved Unverified

www.nfd.kr

Source location R1 entity nfd:dangjin-songsan

Sources EV-cb453c353a4567c3f34a6c63
Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
www.nfd.kr ↗

Data Source Not stated · Retrieved Unverified

www.nfd.kr

Source location R1 entity nfd:dangjin-songsan metric 0

Sources EV-5cdec73f2283619e6101fda3
Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
www.nfd.kr ↗

Data Source Not stated · Retrieved Unverified

www.nfd.kr

Source location R1 entity nfd:dangjin-songsan metric 1

Sources EV-f58be36e5d8bee2553893793
Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
www.nfd.kr ↗

Data Source Not stated · Retrieved Unverified

www.nfd.kr

Source location R1 entity nfd:dangjin-songsan metric 2

Sources EV-0f68b78b6761de8d15481fbc
Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
www.nfd.kr ↗

Data Source Not stated · Retrieved Unverified

www.nfd.kr

Source location R1 entity nfd:dangjin-songsan metric 3

Sources EV-7b82b3a75ca880f62e0597f7
Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
www.nfd.kr ↗

Data Source 2026-09-14 · Retrieved Unverified

www.nfd.kr

Source location R1 entity nfd:dangjin-songsan metric 4

Sources EV-a6511102f4f07ab4e76a18fa
Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
www.nfd.kr ↗

Data Source 2026-09-14 · Retrieved Unverified

www.nfd.kr

Source location R1 entity nfd:dangjin-songsan metric 5

Sources EV-d3fa3a076a34730276f76c05
Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
www.nfd.kr ↗

Data Source 2026-09-14 · Retrieved Unverified

www.nfd.kr

Source location R1 entity nfd:dangjin-songsan metric 6

Sources EV-520e3a0c9cdd204b88bba6fe
Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
www.nfd.kr ↗

Data Source 2026-09-14 · Retrieved Unverified

www.nfd.kr

Source location R1 entity nfd:dangjin-songsan metric 7

Sources EV-a4ea847e51023b422a5989bb
Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
Facility specifications · KOR · primary:9ffa050638ca46db5f23af84

당진 송산 IDC

building C · publisher stated

Metric or conditionSource valueBasis, scope and stage
planned_capacity_unspecified100 MWunspecified · building C · permitting
As-of date 2026-09-14
Sources EV-520e3a0c9cdd204b88bba6fe
Detailed source fields
Original source fieldPublished value or condition
origin_familyproject_record_metrics
inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
Verification statuspublisher_stated
Change typereused
Contracting parties

    Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.

    Sources, reference dates and retrieval dates 1items
    www.nfd.kr ↗

    Data Source 2026-09-14 · Retrieved Unverified

    www.nfd.kr

    Source location R1 entity nfd:dangjin-songsan metric 6

    Sources EV-520e3a0c9cdd204b88bba6fe
    Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
    Facility specifications · KOR · primary:a3fccdd0b91a082fc55ade26

    당진 송산 IDC

    Project · publisher stated

    Metric or conditionSource valueBasis, scope and stage
    PUE1.33 ratioDesign · Project · Design
    As-of date Not stated
    Sources EV-f58be36e5d8bee2553893793
    Detailed source fields
    Original source fieldPublished value or condition
    origin_familyproject_record_metrics
    inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
    Verification statuspublisher_stated
    Change typereused
    Contracting parties

      Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.

      Sources, reference dates and retrieval dates 1items
      www.nfd.kr ↗

      Data Source Not stated · Retrieved Unverified

      www.nfd.kr

      Source location R1 entity nfd:dangjin-songsan metric 1

      Sources EV-f58be36e5d8bee2553893793
      Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
      Facility specifications · KOR · primary:9ffa050638ca46db5f23af84

      당진 송산 IDC

      Campus · developer contract claim not utility verified

      Metric or conditionSource valueBasis, scope and stage
      Contracted electricity supply capacity300 MWcontract · Campus · developer claimed secured
      As-of date 2026-09-14
      Sources EV-a6511102f4f07ab4e76a18fa
      Detailed source fields
      Original source fieldPublished value or condition
      origin_familyproject_record_metrics
      inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
      Verification statusdeveloper_contract_claim_not_utility_verified
      Change typereused
      Contracting parties

        Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.

        Sources, reference dates and retrieval dates 1items
        www.nfd.kr ↗

        Data Source 2026-09-14 · Retrieved Unverified

        www.nfd.kr

        Source location R1 entity nfd:dangjin-songsan metric 4

        Sources EV-a6511102f4f07ab4e76a18fa
        Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
        Facility specifications · KOR · primary:9ffa050638ca46db5f23af84

        당진 송산 IDC

        rack · publisher stated

        Metric or conditionSource valueBasis, scope and stage
        rack_power_density≤ 160 kW/rackDesign · rack · Design
        As-of date 2026-09-14
        Sources EV-a4ea847e51023b422a5989bb
        Detailed source fields
        Original source fieldPublished value or condition
        origin_familyproject_record_metrics
        inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
        Verification statuspublisher_stated
        Change typereused
        Contracting parties

          Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.

          Sources, reference dates and retrieval dates 1items
          www.nfd.kr ↗

          Data Source 2026-09-14 · Retrieved Unverified

          www.nfd.kr

          Source location R1 entity nfd:dangjin-songsan metric 7

          Sources EV-a4ea847e51023b422a5989bb
          Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
          Facility specifications · KOR · primary:a3fccdd0b91a082fc55ade26

          당진 송산 IDC

          Project · publisher stated

          Metric or conditionSource valueBasis, scope and stage
          Gross floor area106716 m2gross floor area · Project · Undisclosed
          As-of date Not stated
          Sources EV-7b82b3a75ca880f62e0597f7
          Detailed source fields
          Original source fieldPublished value or condition
          origin_familyproject_record_metrics
          inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
          Verification statuspublisher_stated
          Change typereused
          Contracting parties

            Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.

            Sources, reference dates and retrieval dates 1items
            www.nfd.kr ↗

            Data Source Not stated · Retrieved Unverified

            www.nfd.kr

            Source location R1 entity nfd:dangjin-songsan metric 3

            Sources EV-7b82b3a75ca880f62e0597f7
            Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
            Facility specifications · KOR · primary:9ffa050638ca46db5f23af84

            당진 송산 IDC

            buildings A and B · publisher stated

            Metric or conditionSource valueBasis, scope and stage
            planned_capacity_unspecified200 MWunspecified · buildings A and B · Plan
            As-of date 2026-09-14
            Sources EV-d3fa3a076a34730276f76c05
            Detailed source fields
            Original source fieldPublished value or condition
            origin_familyproject_record_metrics
            inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
            Verification statuspublisher_stated
            Change typereused
            Contracting parties

              Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.

              Sources, reference dates and retrieval dates 1items
              www.nfd.kr ↗

              Data Source 2026-09-14 · Retrieved Unverified

              www.nfd.kr

              Source location R1 entity nfd:dangjin-songsan metric 5

              Sources EV-d3fa3a076a34730276f76c05
              Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
              Facility specifications · KOR · primary:a3fccdd0b91a082fc55ade26

              당진 송산 IDC

              Project · publisher stated

              Metric or conditionSource valueBasis, scope and stage
              site_area43188 m2site area · Project · Undisclosed
              As-of date Not stated
              Sources EV-0f68b78b6761de8d15481fbc
              Detailed source fields
              Original source fieldPublished value or condition
              origin_familyproject_record_metrics
              inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
              Verification statuspublisher_stated
              Change typereused
              Contracting parties

                Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.

                Sources, reference dates and retrieval dates 1items
                www.nfd.kr ↗

                Data Source Not stated · Retrieved Unverified

                www.nfd.kr

                Source location R1 entity nfd:dangjin-songsan metric 2

                Sources EV-0f68b78b6761de8d15481fbc
                Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
                Total 9evidence records

                Linked source evidence

                Only sources reviewed as referring to the same site are linked. Publication dates and metric scope are preserved; different capacities are not added together or treated as current available capacity.

                당진 송산 IDC

                Source: nfd · Based on public sources

                IndicatorsPublished valueBasis / phaseSource / reference dates
                IT capacity140 MWIT · as published
                Project
                Check the original text
                Source reference date not disclosed
                PUE1.33 ratioDesign · Design
                Project
                Check the original text
                Source reference date not disclosed
                site area43188 m2site area · Undisclosed
                Project
                Check the original text
                Source reference date not disclosed
                Gross floor area106716 m2gross floor area · Undisclosed
                Project
                Check the original text
                Source reference date not disclosed
                Contracted electricity supply capacity300 MWcontract · developer claimed secured
                Campus
                Check the original text
                2026-09-14
                planned capacity unspecified200 MWunspecified · Plan
                buildings A and B
                Check the original text
                2026-09-14
                planned capacity unspecified100 MWunspecified · permitting
                building C
                Check the original text
                2026-09-14
                rack power density≤ 160 kW/rackDesign · Design
                rack
                Check the original text
                2026-09-14
                delivery role자체 개발 하이퍼스케일 프로그램Published statement · announced not independently verified
                Project
                Check the original text
                Source reference date not disclosed
                cooling technology액체냉각 설계Published statement · announced not independently verified
                Project
                Check the original text
                Source reference date not disclosed
                construction start announced2026-Q3Published statement · announced not independently verified
                Project
                Check the original text
                Source reference date not disclosed
                completion target2028-Q4Published statement · announced not independently verified
                Project
                Check the original text
                Source reference date not disclosed
                liquid cooled it capacity140 MWIT · publisher design or specification
                Project
                Check the original text
                Source reference date not disclosed
                construction start target2026-11 초Published statement · developer announced plan
                building A
                Check the original text
                2026-09-14
                service start target2028-Q1Published statement · developer announced plan
                building A
                Check the original text
                2026-09-14
                service start target2028Published statement · developer announced plan
                buildings B and C
                Check the original text
                2026-09-14
                permit completion target2026-12Published statement · developer announced plan
                building C
                Check the original text
                2026-09-14
                procurement delivery window2027–2028Published statement · developer announced plan
                campus transformers
                Check the original text
                2026-09-14
                construction contractorDL이앤씨 선정 주장Published statement · developer announced plan
                buildings A and B
                Check the original text
                2026-09-14
                transformer supplierLS일렉트릭 공급 예정Published statement · developer announced plan
                Campus
                Check the original text
                2026-09-14
                development milestone부지 매입·전력 계약·건축허가 완료 주장; 원 계약·허가증은 미확보Published statement · developer announced plan
                buildings A and B
                Check the original text
                2026-09-14
                specification maturity최종 제원은 입주 고객 요구에 따라 확정 예정Published statement · developer announced plan
                Campus
                Check the original text
                2026-09-14
                mou parties충청남도; 당진시; NFD코리아; EFDPublished statement · publisher reported
                building C
                Check the original text
                2026-09-09
                phase one completion target2028-Q3Published statement · developer announced plan
                campus phase one
                Check the original text
                2026-09-09
                schedule review note소개 페이지 2026-Q3 착공·2028-Q4 준공, 9/9 발표 1단계 2028-Q3, 9/14 발표 A동 2026-11 착공·2028-Q1 개시. 범위·판본이 달라 확정일로 병합하지 않음.document comparison · publisher reported
                cross source review
                Check the original text
                2026-09-14

                CENTER OVERVIEW

                About the Center

                이에프디가 투자하고 엔에프디코리아가 개발·인허가·운영 준비를 지원하는 당진 송산2일반산업단지 AI 데이터센터 단계개발 사업입니다.

                01공공 협약 C동 100MW·1조2,405억원·35,239㎡
                02현재 사업자 페이지 IT Load 140MW·설계 PUE 1.33
                03사업자 300MW 전력·허가 완료 주장과 공공자료 단계 차이·원문 확인 필요

                AI-DC KOREA ANALYSIS

                Interpretation and Verification Points

                충남도는 2026년 9월 9일 35,239㎡ 부지의 100MW AI 데이터센터에 2029년까지 1조2,405억원을 투자하는 협약을 발표했습니다. 공식자료상 부지는 확보됐지만 100MW 전력계통영향평가는 제출 단계이고 건축 인허가도 진행 중입니다. NFD Korea는 같은 송산 캠퍼스의 A·B·C동 총 300MW, 한전 공급계약과 변경인허가 완료, DL이앤씨 프리콘·11월 착공, LS ELECTRIC 변압기 공급을 발표했습니다. 회사의 현재 프로젝트 페이지는 다시 대지 43,188㎡, 연면적 106,716㎡, IT Load 140MW, 설계 PUE 1.33, 2026년 3분기 착공·2028년 4분기 준공으로 표시합니다. 두 자료의 물리 사업지와 단계개발 맥락이 같아 센터를 중복 생성하지 않았습니다. 공공 협약 100MW와 사업자 캠퍼스 300MW는 기술적 용량 정의가 공개되지 않은 계획값으로, 현재 프로젝트 페이지에서 명시한 IT Load 140MW와 분리했습니다. 공공자료와 사업자 발표의 전력·허가 단계, 부지면적, 착공·준공 일정도 서로 달라 전기사용계약서, 계통영향평가 결과, 건축허가·변경허가 원문이 확인되기 전에는 300MW 전력확보와 허가완료를 확정하지 않습니다. 세부 필지와 공신력 있는 좌표가 없어 지도 핀도 보류합니다.

                Principles for Interpreting Numbers

                Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.

                RESEARCH PRO

                Cross-Reference Data and Licensing Detail Ledger

                We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.

                Start a consultation · Choose a channel