사업자 뉴스 A동 2026년 11월 착공·캠퍼스 2028년 3분기 순차 준공 목표 / 현재 프로젝트 페이지 2026년 3분기 착공·2028년 4분기 준공
NFD Dangjin Songsan AI Data Center Campus
Songsan 2 General Industrial Complex, Dangjin City, South Chungcheong Province (Public Agreement: 35,239 m²; Developer’s Current Project: 43,188 m²; specific lot details not disclosed)
Distinguish between power supply, UPS, and IT load
AI Training, Inference, and High-Density Liquid-Cooled Data Center Campus
Confirm move-in conditions at this center.
Discuss facility, power and network requirements → · Compare published Korean rental productsAdditional power and facility specifications
Values and scope are preserved from public sources. Different phases and dates for one facility remain separate observations.
당진 송산 IDC
data center project · Published statement
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| IT capacity | 140 MW | IT · Project · as published As-of date Not stated Sources EV-5cdec73f2283619e6101fda3 |
| PUE | 1.33 ratio | Design · Project · Design As-of date Not stated Sources EV-f58be36e5d8bee2553893793 |
| site_area | 43188 m2 | site area · Project · Undisclosed As-of date Not stated Sources EV-0f68b78b6761de8d15481fbc |
| Gross floor area | 106716 m2 | gross floor area · Project · Undisclosed As-of date Not stated Sources EV-7b82b3a75ca880f62e0597f7 |
| Contracted electricity supply capacity | 300 MW | contract · Campus · developer claimed secured As-of date 2026-09-14 Sources EV-a6511102f4f07ab4e76a18fa |
| planned_capacity_unspecified | 200 MW | unspecified · buildings A and B · Plan As-of date 2026-09-14 Sources EV-d3fa3a076a34730276f76c05 |
| planned_capacity_unspecified | 100 MW | unspecified · building C · permitting As-of date 2026-09-14 Sources EV-520e3a0c9cdd204b88bba6fe |
| rack_power_density | 160 kW/rack | Design · rack · Design As-of date 2026-09-14 Sources EV-a4ea847e51023b422a5989bb |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| source_record_id | r1:nfd:dangjin-songsan |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 9items
Data Source Not stated · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan
Sources EV-cb453c353a4567c3f34a6c63Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
Data Source Not stated · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 0
Sources EV-5cdec73f2283619e6101fda3Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
Data Source Not stated · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 1
Sources EV-f58be36e5d8bee2553893793Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
Data Source Not stated · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 2
Sources EV-0f68b78b6761de8d15481fbcEvidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
Data Source Not stated · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 3
Sources EV-7b82b3a75ca880f62e0597f7Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
Data Source 2026-09-14 · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 4
Sources EV-a6511102f4f07ab4e76a18faEvidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
Data Source 2026-09-14 · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 5
Sources EV-d3fa3a076a34730276f76c05Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
Data Source 2026-09-14 · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 6
Sources EV-520e3a0c9cdd204b88bba6feEvidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
Data Source 2026-09-14 · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 7
Sources EV-a4ea847e51023b422a5989bbEvidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
당진 송산 IDC
building C · publisher stated
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| planned_capacity_unspecified | 100 MW | unspecified · building C · permitting As-of date 2026-09-14 Sources EV-520e3a0c9cdd204b88bba6fe |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| origin_family | project_record_metrics |
| inherited_batch | AIDC-GLOBAL-20261005-DATA-R1-FIX1 |
| Verification status | publisher_stated |
| Change type | reused |
| Contracting parties |
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1items
Data Source 2026-09-14 · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 6
Sources EV-520e3a0c9cdd204b88bba6feEvidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
당진 송산 IDC
Project · publisher stated
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| PUE | 1.33 ratio | Design · Project · Design As-of date Not stated Sources EV-f58be36e5d8bee2553893793 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| origin_family | project_record_metrics |
| inherited_batch | AIDC-GLOBAL-20261005-DATA-R1-FIX1 |
| Verification status | publisher_stated |
| Change type | reused |
| Contracting parties |
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1items
Data Source Not stated · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 1
Sources EV-f58be36e5d8bee2553893793Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
당진 송산 IDC
Campus · developer contract claim not utility verified
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Contracted electricity supply capacity | 300 MW | contract · Campus · developer claimed secured As-of date 2026-09-14 Sources EV-a6511102f4f07ab4e76a18fa |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| origin_family | project_record_metrics |
| inherited_batch | AIDC-GLOBAL-20261005-DATA-R1-FIX1 |
| Verification status | developer_contract_claim_not_utility_verified |
| Change type | reused |
| Contracting parties |
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1items
Data Source 2026-09-14 · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 4
Sources EV-a6511102f4f07ab4e76a18faEvidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
당진 송산 IDC
rack · publisher stated
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| rack_power_density | ≤ 160 kW/rack | Design · rack · Design As-of date 2026-09-14 Sources EV-a4ea847e51023b422a5989bb |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| origin_family | project_record_metrics |
| inherited_batch | AIDC-GLOBAL-20261005-DATA-R1-FIX1 |
| Verification status | publisher_stated |
| Change type | reused |
| Contracting parties |
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1items
Data Source 2026-09-14 · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 7
Sources EV-a4ea847e51023b422a5989bbEvidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
당진 송산 IDC
Project · publisher stated
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Gross floor area | 106716 m2 | gross floor area · Project · Undisclosed As-of date Not stated Sources EV-7b82b3a75ca880f62e0597f7 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| origin_family | project_record_metrics |
| inherited_batch | AIDC-GLOBAL-20261005-DATA-R1-FIX1 |
| Verification status | publisher_stated |
| Change type | reused |
| Contracting parties |
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1items
Data Source Not stated · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 3
Sources EV-7b82b3a75ca880f62e0597f7Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
당진 송산 IDC
buildings A and B · publisher stated
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| planned_capacity_unspecified | 200 MW | unspecified · buildings A and B · Plan As-of date 2026-09-14 Sources EV-d3fa3a076a34730276f76c05 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| origin_family | project_record_metrics |
| inherited_batch | AIDC-GLOBAL-20261005-DATA-R1-FIX1 |
| Verification status | publisher_stated |
| Change type | reused |
| Contracting parties |
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1items
Data Source 2026-09-14 · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 5
Sources EV-d3fa3a076a34730276f76c05Evidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
당진 송산 IDC
Project · publisher stated
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| site_area | 43188 m2 | site area · Project · Undisclosed As-of date Not stated Sources EV-0f68b78b6761de8d15481fbc |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| origin_family | project_record_metrics |
| inherited_batch | AIDC-GLOBAL-20261005-DATA-R1-FIX1 |
| Verification status | publisher_stated |
| Change type | reused |
| Contracting parties |
Project page IT140MW, campus contract claim300MW and AB200/C100 published plan have distinct bases/scopes; do not add or overwrite. Contract is a developer assertion; no exact utility route/substation or contract-document verification.
Sources, reference dates and retrieval dates 1items
Data Source Not stated · Retrieved Unverified
www.nfd.kr
Source location R1 entity nfd:dangjin-songsan metric 2
Sources EV-0f68b78b6761de8d15481fbcEvidence SHA-256 5192e54ecd0c5420682e0eff9ae302ab2825f2dff9953534bc804b7b444aa0f2 · inherited_normalized_file
Linked source evidence
Only sources reviewed as referring to the same site are linked. Publication dates and metric scope are preserved; different capacities are not added together or treated as current available capacity.
당진 송산 IDC
Source: nfd · Based on public sources
| Indicators | Published value | Basis / phase | Source / reference dates |
|---|---|---|---|
| IT capacity | 140 MW | IT · as published Project | Check the original text Source reference date not disclosed |
| PUE | 1.33 ratio | Design · Design Project | Check the original text Source reference date not disclosed |
| site area | 43188 m2 | site area · Undisclosed Project | Check the original text Source reference date not disclosed |
| Gross floor area | 106716 m2 | gross floor area · Undisclosed Project | Check the original text Source reference date not disclosed |
| Contracted electricity supply capacity | 300 MW | contract · developer claimed secured Campus | Check the original text 2026-09-14 |
| planned capacity unspecified | 200 MW | unspecified · Plan buildings A and B | Check the original text 2026-09-14 |
| planned capacity unspecified | 100 MW | unspecified · permitting building C | Check the original text 2026-09-14 |
| rack power density | ≤ 160 kW/rack | Design · Design rack | Check the original text 2026-09-14 |
| delivery role | 자체 개발 하이퍼스케일 프로그램 | Published statement · announced not independently verified Project | Check the original text Source reference date not disclosed |
| cooling technology | 액체냉각 설계 | Published statement · announced not independently verified Project | Check the original text Source reference date not disclosed |
| construction start announced | 2026-Q3 | Published statement · announced not independently verified Project | Check the original text Source reference date not disclosed |
| completion target | 2028-Q4 | Published statement · announced not independently verified Project | Check the original text Source reference date not disclosed |
| liquid cooled it capacity | 140 MW | IT · publisher design or specification Project | Check the original text Source reference date not disclosed |
| construction start target | 2026-11 초 | Published statement · developer announced plan building A | Check the original text 2026-09-14 |
| service start target | 2028-Q1 | Published statement · developer announced plan building A | Check the original text 2026-09-14 |
| service start target | 2028 | Published statement · developer announced plan buildings B and C | Check the original text 2026-09-14 |
| permit completion target | 2026-12 | Published statement · developer announced plan building C | Check the original text 2026-09-14 |
| procurement delivery window | 2027–2028 | Published statement · developer announced plan campus transformers | Check the original text 2026-09-14 |
| construction contractor | DL이앤씨 선정 주장 | Published statement · developer announced plan buildings A and B | Check the original text 2026-09-14 |
| transformer supplier | LS일렉트릭 공급 예정 | Published statement · developer announced plan Campus | Check the original text 2026-09-14 |
| development milestone | 부지 매입·전력 계약·건축허가 완료 주장; 원 계약·허가증은 미확보 | Published statement · developer announced plan buildings A and B | Check the original text 2026-09-14 |
| specification maturity | 최종 제원은 입주 고객 요구에 따라 확정 예정 | Published statement · developer announced plan Campus | Check the original text 2026-09-14 |
| mou parties | 충청남도; 당진시; NFD코리아; EFD | Published statement · publisher reported building C | Check the original text 2026-09-09 |
| phase one completion target | 2028-Q3 | Published statement · developer announced plan campus phase one | Check the original text 2026-09-09 |
| schedule review note | 소개 페이지 2026-Q3 착공·2028-Q4 준공, 9/9 발표 1단계 2028-Q3, 9/14 발표 A동 2026-11 착공·2028-Q1 개시. 범위·판본이 달라 확정일로 병합하지 않음. | document comparison · publisher reported cross source review | Check the original text 2026-09-14 |
- Source evidence 1 · Source date: Not stated · Confirm: 2026-10-05
- Source evidence 2 · Source date: 2026-09-14 · Confirm: 2026-10-05
- Source evidence 3 · Source date: Not stated · Confirm: 2026-10-07
- Source evidence 4 · Source date: 2026-09-14 · Confirm: 2026-10-07
- Source evidence 5 · Source date: 2026-09-09 · Confirm: 2026-10-07
CENTER OVERVIEW
About the Center
이에프디가 투자하고 엔에프디코리아가 개발·인허가·운영 준비를 지원하는 당진 송산2일반산업단지 AI 데이터센터 단계개발 사업입니다.
AI-DC KOREA ANALYSIS
Interpretation and Verification Points
충남도는 2026년 9월 9일 35,239㎡ 부지의 100MW AI 데이터센터에 2029년까지 1조2,405억원을 투자하는 협약을 발표했습니다. 공식자료상 부지는 확보됐지만 100MW 전력계통영향평가는 제출 단계이고 건축 인허가도 진행 중입니다. NFD Korea는 같은 송산 캠퍼스의 A·B·C동 총 300MW, 한전 공급계약과 변경인허가 완료, DL이앤씨 프리콘·11월 착공, LS ELECTRIC 변압기 공급을 발표했습니다. 회사의 현재 프로젝트 페이지는 다시 대지 43,188㎡, 연면적 106,716㎡, IT Load 140MW, 설계 PUE 1.33, 2026년 3분기 착공·2028년 4분기 준공으로 표시합니다. 두 자료의 물리 사업지와 단계개발 맥락이 같아 센터를 중복 생성하지 않았습니다. 공공 협약 100MW와 사업자 캠퍼스 300MW는 기술적 용량 정의가 공개되지 않은 계획값으로, 현재 프로젝트 페이지에서 명시한 IT Load 140MW와 분리했습니다. 공공자료와 사업자 발표의 전력·허가 단계, 부지면적, 착공·준공 일정도 서로 달라 전기사용계약서, 계통영향평가 결과, 건축허가·변경허가 원문이 확인되기 전에는 300MW 전력확보와 허가완료를 확정하지 않습니다. 세부 필지와 공신력 있는 좌표가 없어 지도 핀도 보류합니다.
Power supply capacity refers to the range of power designed and contracted to be received from KEPCO; UPS capacity refers to the size of the uninterruptible power supply system; and IT load refers to the power actually allocated to IT equipment. Do not make estimates unless these are distinguished in the published data.
Cross-Reference Data and Licensing Detail Ledger
We publish basic information about the centers and their official legal basis. For links to candidate sites by data source, as well as details on permits, groundbreaking, and occupancy permits—including any changes—please refer to Research Pro.