KOREA DATA CENTER DATABASE
Find a domestic data center and compare them under the same conditions.
Search by region, operator, and project stage, and switch between the list and map to check facility specifications and sources. Be sure to review the scope and timing of the publicly available data.
Latest facility record check 2026-10-10 · The verification date for each individual record is indicated in the details. The number of registered entries does not represent the total market size nationwide.
Official specification evidence 93records · latest check 2026-10-14. The listing of specifications does not imply verification of remaining capacity or the validity of certifications.
Centers by operator · 29entities
Current Search Results: Project Stage and Regional Distribution
These are registered sites that match your current search criteria.
This is distinct from overall market share nationwide.
NFD Dangjin Songsan AI Data Center Campus
NFD Korea·EFD
Songsan 2 General Industrial Complex, Dangjin City, South Chungcheong Province (Public Agreement: 35,239 m²; Developer’s Current Project: 43,188 m²; specific lot details not disclosed)
- Public Power
- Official documents: 100 MW Power System Impact Assessment submitted; operator claims 300 MW supply contract with KEPCO; currently disclosed IT load: 140 MW; original contract text not verified.
- Size & facility
- Public Agreement: Building C, 100 MW; Operator Campus Announcement: Buildings A, B, and C, total 300 MW; Current project page: IT load 140 MW
Find a center and continue your review.
Please verify the facility’s publicly disclosed specifications and actual occupancy and supply conditions separately.
