Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Evidence relationships · USA · primary:a222f206efa3a4657231d965
Crusoe / Google Armstrong County campus
Not obtained · Source-stated
Relationship status: Source-stated · announced direct generation connection Related record power:goodnight-2 · Relationship evidence
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
from_kind
power_object
from_id
power:crusoe-armstrong
to_kind
power_object
to_id
power:goodnight-2
geometry_relation
false
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1itemswww.crusoe.ai ↗
Data Source 2026-09-28 · Retrieved 2026-10-05
www.crusoe.ai
Source location article body
Sources EV-14a0f36e441e08202207a5c1 Evidence SHA-256 c660d236e43bfaee290fd37aac392ae029bfe715d54cd9b1e4d7b441ab6ce4c0 · raw_http_responsePower assets and projects · USA · primary:a222f206efa3a4657231d965
Goodnight 2 wind project
Generation facilities · Under construction
Metric or condition
Source value
Basis, scope and stage
generation_nameplate_capacity
265.5 MW
generation nameplate capacity · generation project · Under construction As-of date 2026-09-28 Sources EV-14a0f36e441e08202207a5c1
Detailed source fields
Original source field
Published value or condition
source_record_id
goodnight-2
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1itemswww.crusoe.ai ↗