POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · USA · primary:a222f206efa3a4657231d965

Crusoe / Google Armstrong County campus

Not obtained · Source-stated

Relationship status: Source-stated · announced direct generation connection
Related record power:goodnight-2 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idpower:crusoe-armstrong
to_kindpower_object
to_idpower:goodnight-2
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
www.crusoe.ai ↗

Data Source 2026-09-28 · Retrieved 2026-10-05

www.crusoe.ai

Source location article body

Sources EV-14a0f36e441e08202207a5c1
Evidence SHA-256 c660d236e43bfaee290fd37aac392ae029bfe715d54cd9b1e4d7b441ab6ce4c0 · raw_http_response
Power assets and projects · USA · primary:a222f206efa3a4657231d965

Goodnight 2 wind project

Generation facilities · Under construction

Metric or conditionSource valueBasis, scope and stage
generation_nameplate_capacity265.5 MWgeneration nameplate capacity · generation project · Under construction
As-of date 2026-09-28
Sources EV-14a0f36e441e08202207a5c1
Detailed source fields
Original source fieldPublished value or condition
source_record_idgoodnight-2

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
www.crusoe.ai ↗

Data Source 2026-09-28 · Retrieved 2026-10-05

www.crusoe.ai

Source location article body

Sources EV-14a0f36e441e08202207a5c1
Evidence SHA-256 c660d236e43bfaee290fd37aac392ae029bfe715d54cd9b1e4d7b441ab6ce4c0 · raw_http_response
Power observations · USA · primary:a222f206efa3a4657231d965

Goodnight 2 wind project

generation project · Official statement

Metric or conditionSource valueBasis, scope and stage
generation_nameplate_capacity265.5 MWgeneration nameplate capacity · generation project · Under construction
As-of date 2026-09-28
Sources EV-14a0f36e441e08202207a5c1
Detailed source fields
Original source fieldPublished value or condition
Verification statusprimary_statement
Change typenew
Contracting parties

    Wind plant rating. Does not state DC contracted supply MW or IT load.

    Sources, reference dates and retrieval dates 1items
    www.crusoe.ai ↗

    Data Source 2026-09-28 · Retrieved 2026-10-05

    www.crusoe.ai

    Source location article body

    Sources EV-14a0f36e441e08202207a5c1
    Evidence SHA-256 c660d236e43bfaee290fd37aac392ae029bfe715d54cd9b1e4d7b441ab6ce4c0 · raw_http_response

    AI-DC KOREA MEMBER

    Log In

    Sign in to continue on this page.

    G Continue with GoogleK Continue with Kakao

    Choose the Google or Kakao account you registered with.

    Start a consultation · Choose a channel