Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Evidence relationships · USA · primary:b408d305f7f942cd3523df22
AWS Susquehanna-adjacent campus and other Pennsylvania sites / generation_ppa_capacity
Not obtained · Source-stated
Relationship status: Source-stated · contract applies to inherited subject Related record r1:power_source:b408d305f7f9:power_asset:4fd8fc47122f · Relationship evidence
AWS Susquehanna-adjacent campus and other Pennsylvania sites / generation_ppa_capacity
regional portfolio · Official statement
Metric or condition
Source value
Basis, scope and stage
generation_ppa_capacity
1920 MW
generation ppa capacity · regional portfolio · as published As-of date 2025-06-11 Sources EV-4047d11432548b889769660b
Detailed source fields
Original source field
Published value or condition
inherited_batch
AIDC-GLOBAL-20261005-DATA-R1-FIX1
eligible_for_exact_contract_mw
false
Verification status
primary_statement
Change type
reused
Contracting parties
Regional nuclear-generation procurement, with ability to deliver beyond Susquehanna-adjacent campus. Do not assign 1,920MW as a single facility grid limit, IT load, or immediate operating draw.