This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · USA · primary:b408d305f7f942cd3523df22

AWS Susquehanna-adjacent campus and other Pennsylvania sites / generation_ppa_capacity

Not obtained · Source-stated

Relationship status: Source-stated · contract applies to inherited subject
Related record r1:power_source:b408d305f7f9:power_asset:4fd8fc47122f · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idpower:contract:P014
to_kindpower_object
to_idr1:power_source:b408d305f7f9:power_asset:4fd8fc47122f
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
ir.talenenergy.com ↗

Data Source 2025-06-11 · Retrieved Unverified

ir.talenenergy.com

Source location inherited observation P014

Sources EV-4047d11432548b889769660b
Evidence SHA-256 f70420e5f2ae99cb7db8393fbebe03a59727b20187d959aec62ab51ab1dd090a · inherited_normalized_file
Power assets and projects · USA · primary:b408d305f7f942cd3523df22

AWS Susquehanna-adjacent campus and other Pennsylvania sites / generation_ppa_capacity

regional portfolio · Published statement

Metric or conditionSource valueBasis, scope and stage
generation_ppa_capacity1920 MWgeneration ppa capacity · regional portfolio · as published
As-of date 2025-06-11
Sources EV-4047d11432548b889769660b
Detailed source fields
Original source fieldPublished value or condition
Contracting parties
    contract_details
    source_record_idcontract:P014

    Location: Coordinates not obtained · no map marker

    Sources, reference dates and retrieval dates 1items
    ir.talenenergy.com ↗

    Data Source 2025-06-11 · Retrieved Unverified

    ir.talenenergy.com

    Source location inherited observation P014

    Sources EV-4047d11432548b889769660b
    Evidence SHA-256 f70420e5f2ae99cb7db8393fbebe03a59727b20187d959aec62ab51ab1dd090a · inherited_normalized_file
    Power observations · USA · primary:b408d305f7f942cd3523df22

    AWS Susquehanna-adjacent campus and other Pennsylvania sites / generation_ppa_capacity

    regional portfolio · Official statement

    Metric or conditionSource valueBasis, scope and stage
    generation_ppa_capacity1920 MWgeneration ppa capacity · regional portfolio · as published
    As-of date 2025-06-11
    Sources EV-4047d11432548b889769660b
    Detailed source fields
    Original source fieldPublished value or condition
    inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
    eligible_for_exact_contract_mwfalse
    Verification statusprimary_statement
    Change typereused
    Contracting parties

      Regional nuclear-generation procurement, with ability to deliver beyond Susquehanna-adjacent campus. Do not assign 1,920MW as a single facility grid limit, IT load, or immediate operating draw.

      Sources, reference dates and retrieval dates 1items
      ir.talenenergy.com ↗

      Data Source 2025-06-11 · Retrieved Unverified

      ir.talenenergy.com

      Source location inherited observation P014

      Sources EV-4047d11432548b889769660b
      Evidence SHA-256 f70420e5f2ae99cb7db8393fbebe03a59727b20187d959aec62ab51ab1dd090a · inherited_normalized_file

      AI-DC KOREA MEMBER

      Log In

      Sign in to continue on this page.

      G Continue with GoogleK Continue with Kakao

      Choose the Google or Kakao account you registered with.

      Start a consultation · Choose a channel