POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · SWE · primary:17930b1f5eb3c818d9741625

Falun data center / generation_ppa_physical_supply_capacity

Not obtained · Source-stated

Relationship status: Source-stated · contract applies to inherited subject
Related record r1:power_source:17930b1f5eb3:power_asset:bb05301bedb0 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idpower:contract:P010
to_kindpower_object
to_idr1:power_source:17930b1f5eb3:power_asset:bb05301bedb0
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
www.fortum.com ↗

Data Source 2026-06-22 · Retrieved 2026-10-05

www.fortum.com

Source location inherited observation P010

Sources EV-161b7fa17213a1fa13f5b2db
Evidence SHA-256 a2a79b2ea85478ba32c1609866376b1107178eda7fecf42db49ca6a7b66fbd12 · raw_http_response
Power assets and projects · SWE · primary:17930b1f5eb3c818d9741625

Falun data center / generation_ppa_physical_supply_capacity

Facilities · Published statement

Metric or conditionSource valueBasis, scope and stage
generation_ppa_physical_supply_capacity10 MWgeneration ppa physical supply capacity · Facilities · as published
As-of date 2026-06-22
Sources EV-98cc426d5096f6c6cdbaa18c
Detailed source fields
Original source fieldPublished value or condition
Contracting parties
  • Name
    Fortum
    Role
    electricity_supplier_and_balance_responsible
    Organization ID
    Not obtained
    Verification status
    name_in_primary_source_not_registry_verified
  • Name
    EcoDataCenter
    Role
    customer
    Organization ID
    Not obtained
    Verification status
    name_in_primary_source_not_registry_verified
contract_details
Agreement type
physical_hydropower_supply_with_Guarantees_of_Origin
term_years
5
supply_start_period
2026-01
supply_end_period
2030-12
generation_area
Dalälven
exact_generation_plant
Not obtained
Connection point
Not obtained
source_record_idcontract:P010

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
www.fortum.com ↗

Data Source 2026-06-22 · Retrieved 2026-10-05

www.fortum.com

Source location inherited observation P010

Sources EV-161b7fa17213a1fa13f5b2db
Evidence SHA-256 a2a79b2ea85478ba32c1609866376b1107178eda7fecf42db49ca6a7b66fbd12 · raw_http_response
www.fortum.com ↗

Data Source 2026-06-22 · Retrieved 2026-10-05

www.fortum.com

Source location article body

Sources EV-98cc426d5096f6c6cdbaa18c
Evidence SHA-256 a2a79b2ea85478ba32c1609866376b1107178eda7fecf42db49ca6a7b66fbd12 · raw_http_response
Power observations · SWE · primary:17930b1f5eb3c818d9741625

Falun data center / generation_ppa_physical_supply_capacity

Facilities · Official statement

Metric or conditionSource valueBasis, scope and stage
generation_ppa_physical_supply_capacity10 MWgeneration ppa physical supply capacity · Facilities · as published
As-of date 2026-06-22
Sources EV-161b7fa17213a1fa13f5b2db
Detailed source fields
Original source fieldPublished value or condition
Agreement typephysical_hydropower_supply_with_Guarantees_of_Origin
term_years5
supply_start_period2026-01
supply_end_period2030-12
generation_areaDalälven
exact_generation_plantNot obtained
Connection pointNot obtained
inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
eligible_for_exact_contract_mwfalse
Verification statusprimary_statement
Change typeenriched
Contracting parties
  • Name
    Fortum
    Role
    electricity_supplier_and_balance_responsible
    Organization ID
    Not obtained
    Verification status
    name_in_primary_source_not_registry_verified
  • Name
    EcoDataCenter
    Role
    customer
    Organization ID
    Not obtained
    Verification status
    name_in_primary_source_not_registry_verified

Explicit physical generation-linked supply contract from nearby Dalälven plants; Fortum also assumes physical-supply and balance responsibility. 10MW covers a share of energy needs, not campus grid connection capacity or total IT load.

Sources, reference dates and retrieval dates 2items
www.fortum.com ↗

Data Source 2026-06-22 · Retrieved 2026-10-05

www.fortum.com

Source location inherited observation P010

Sources EV-161b7fa17213a1fa13f5b2db
Evidence SHA-256 a2a79b2ea85478ba32c1609866376b1107178eda7fecf42db49ca6a7b66fbd12 · raw_http_response
www.fortum.com ↗

Data Source 2026-06-22 · Retrieved 2026-10-05

www.fortum.com

Source location article body

Sources EV-98cc426d5096f6c6cdbaa18c
Evidence SHA-256 a2a79b2ea85478ba32c1609866376b1107178eda7fecf42db49ca6a7b66fbd12 · raw_http_response

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel