Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Evidence relationships · USA · primary:ae1b30ffcdc10e1e998b3fa4
Relationship status: Source-stated · contract applies to inherited subject Related record r1:power_source:ae1b30ffcdc1:power_asset:1d6c58870cf2 · Relationship evidence
contracted grid connection capacity · Undisclosed · as published As-of date 2025-08-28 Sources EV-9a6a908990cc52e626b31a65
Detailed source fields
Original source field
Published value or condition
inherited_batch
AIDC-GLOBAL-20261005-DATA-R1-FIX1
eligible_for_exact_contract_mw
true
Verification status
primary_statement
Change type
reused
Contracting parties
Filing states all three Texas sites have executed grid connection agreements. 750MW is grid/site capacity; the same source reports only 650MW operating data-center capacity at June 30, 2025. Do not equate with IT load.
Sources, reference dates and retrieval dates 1itemswww.sec.gov ↗