POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · USA · primary:47dc866c5592e5343eba9d75

Jamestown blockchain facility (Fried Township, Stutsman County, North Dakota) / contracted_electricity_supply_capacity

Not obtained · Source-stated

Relationship status: Source-stated · contract applies to inherited subject
Related record r1:power_source:47dc866c5592:power_asset:1daf6c189d4a · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idpower:contract:P004
to_kindpower_object
to_idr1:power_source:47dc866c5592:power_asset:1daf6c189d4a
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
ir.applieddigital.com ↗

Data Source 2021-08-13 · Retrieved 2026-10-05

ir.applieddigital.com

Source location inherited observation P004

Sources EV-23d172b4cf83f16ecb9104db
Evidence SHA-256 c4d14dfaf829f591c536df9adcb8ee08071da621e62c7d48839470e5059cf719 · raw_http_response
Power assets and projects · USA · primary:47dc866c5592e5343eba9d75

Jamestown blockchain facility (Fried Township, Stutsman County, North Dakota) / contracted_electricity_supply_capacity

Facilities · Published statement

Metric or conditionSource valueBasis, scope and stage
Contracted electricity supply capacity100 MWcontracted electricity supply capacity · Facilities · as published
As-of date 2021-08-13
Sources EV-30434318a1f8232fca3c9cc0
Detailed source fields
Original source fieldPublished value or condition
Contracting parties
  • Name
    APLD Hosting LLC
    Role
    customer
    Organization ID
    Not obtained
    Verification status
    name_in_primary_source_not_registry_verified
  • Name
    Not obtained
    Role
    electricity_supplier_redacted
    Organization ID
    Not obtained
    Verification status
    name_in_primary_source_not_registry_verified
contract_details
Agreement type
interruptible_electric_service
Initial term (years)
5
Renewal conditions
year-to-year after initial term
Service voltage (kV)
41.6
Firm demand level (MW)
5
Controllable load (%)
95
Supply start date
Not obtained
Actual energization date
Not obtained
Termination deadline if capacity is unavailable
2022-01-14
Connection point
Not obtained
Supplier identity
redacted in exhibit
source_record_idcontract:P004

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
ir.applieddigital.com ↗

Data Source 2021-08-13 · Retrieved 2026-10-05

ir.applieddigital.com

Source location inherited observation P004

Sources EV-23d172b4cf83f16ecb9104db
Evidence SHA-256 c4d14dfaf829f591c536df9adcb8ee08071da621e62c7d48839470e5059cf719 · raw_http_response
ir.applieddigital.com ↗

Data Source 2021-08-13 · Retrieved 2026-10-05

ir.applieddigital.com

Source location Exhibit 10.6 sections 1,3,4,5,9 and term clause

Sources EV-30434318a1f8232fca3c9cc0
Evidence SHA-256 c4d14dfaf829f591c536df9adcb8ee08071da621e62c7d48839470e5059cf719 · raw_http_response
Power observations · USA · primary:47dc866c5592e5343eba9d75

Jamestown blockchain facility (Fried Township, Stutsman County, North Dakota) / contracted_electricity_supply_capacity

Facilities · Document verified

Metric or conditionSource valueBasis, scope and stage
Contracted electricity supply capacity100 MWcontracted electricity supply capacity · Facilities · as published
As-of date 2021-08-13
Sources EV-23d172b4cf83f16ecb9104db
Detailed source fields
Original source fieldPublished value or condition
Agreement typeinterruptible_electric_service
Initial term (years)5
Renewal conditionsyear-to-year after initial term
Service voltage (kV)41.6
Firm demand level (MW)5
Controllable load (%)95
Supply start dateNot obtained
Actual energization dateNot obtained
Termination deadline if capacity is unavailable2022-01-14
Connection pointNot obtained
Supplier identityredacted in exhibit
inherited_batchAIDC-GLOBAL-20261005-DATA-R1-FIX1
eligible_for_exact_contract_mwtrue
Verification statusdocument_verified
Change typeenriched
Contracting parties
  • Name
    APLD Hosting LLC
    Role
    customer
    Organization ID
    Not obtained
    Verification status
    name_in_primary_source_not_registry_verified
  • Name
    Not obtained
    Role
    electricity_supplier_redacted
    Organization ID
    Not obtained
    Verification status
    name_in_primary_source_not_registry_verified

Historic filed contract; supplier name redacted. Agreement clauses explicitly cover 100MW capacity, interruptible service, conditions precedent, five-year initial term and annual continuation. This is not 100MW firm supply and does not establish 2026 contract status. Source date is S-1 filing date. Signature block gives effective date August 4, 2021. 100 MW is interruptible contracted capacity. 2022-01-14 is a termination condition, not an energization promise. Supplier is redacted; no guessed utility name.

Sources, reference dates and retrieval dates 2items
ir.applieddigital.com ↗

Data Source 2021-08-13 · Retrieved 2026-10-05

ir.applieddigital.com

Source location inherited observation P004

Sources EV-23d172b4cf83f16ecb9104db
Evidence SHA-256 c4d14dfaf829f591c536df9adcb8ee08071da621e62c7d48839470e5059cf719 · raw_http_response
ir.applieddigital.com ↗

Data Source 2021-08-13 · Retrieved 2026-10-05

ir.applieddigital.com

Source location Exhibit 10.6 sections 1,3,4,5,9 and term clause

Sources EV-30434318a1f8232fca3c9cc0
Evidence SHA-256 c4d14dfaf829f591c536df9adcb8ee08071da621e62c7d48839470e5059cf719 · raw_http_response

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel